HomeMy WebLinkAboutWPO201600066 Plan - Stormwater WPO VSMP 2016-12-15 Azar COUNTY OF ALBEMARLE
,� Department of Community Development
t41 1 31L 401 McIntire Road,North Wing
�, Charlottesville,Virginia 22902-4596
'` TeL (434)296-5832 • Fax(434)972-4126
Stormwater Pollution Prevention Plan (SWPPP)
Project Name: West Leigh Stream Crossing
Address: 1300 West Leigh Dr, Charlottesville, VA, 22901.
TMP 059C2-01-00-02900
f14o 1 #o Pre--co,,,
Prepared by: W(1/ /vote
o
Shimp Engineering P.C.
Prepared for: ?X �d (oy t; fl7 rim/
JXBill O'Luanaigh 1140re (oj ies 01 5l1
SWPPP Preparation Date: 12/15/2016
(This document is to be made publicly available according to 9VAC25-880-70, Part II, section D)
Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP)Albemarle County
CONTENTS: (from Albemarle County Code Sec. 17-405)
1. Nature of activity
2. Pollution Prevention Plan.
3. Discharges to impaired waters, surface waters within an applicable TMDL wasteload
allocation, and exceptional waters.
4. Qualified personnel
5. Signed Certification
6. Delegation of authority.
7. Inspection logs
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County
Section 3. Nature of activity
THIS SITE IS AN UNDEVELOPED FARM OFF VA-810 IN ALBEMARLE COUNTY BEING CONVERTED INTO A CHILDREN'S DAY CAMP.
THE TOTAL AREA OF DISTURBANCE IS 0.76 ACRES.
THE PROJECT INVOLVES THE FOLLOWING WORK ACTIVITIES:
1. THE CONTRACTOR SHALL OBTAIN ALL LOCAL AND STATE EROSION AND SEDIMENT PERMITTING REQUIREMENTS AND
MAINTAIN ALL EROSION AND SEDIMENT CONTROLS IN ACCORDANCE WITH THE PERMIT REQUIREMENTS.
2. INSTALLATION OF PERMANENT EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON THE PLAN AND DETAILS.
3. GRADING AND PLACEMENT OF FILL SHALL BE IN GENERAL ACCORDANCE WITH THE PLAN.
4. ESTABLISHMENT OF PERMANENT STABILIZATION OF ALL DISTURBED AREAS.
STAGE 1
1. INSTALL CONSTRUCTION ENTRANCE OFF WEST LEIGH DRIVE.
2. INSTALL SILT FENCE ALONG EDGE OF STREAM
3. INSTALL ROAD GRAVEL BASE UP TO STATION 12+00.
4. INSTALL CULVERT WITHIN STREAM BANKS.
5. INSTALL EROSION CONTROL MEASURES AS SHOWN.
STAGE 2
CONTACT THE ENGINEER AND ALBEMARLE COUNTY FOR INSPECTION AND APPROVAL OF ALL E&S CONTROL MEASURES.
STAGE 3
1. UPON APPROVAL OF ALL E&S CONTROL MEASURES, BEGIN GRADING AND PAVING ACTIVITIES.
2. MAINTAIN ALL E&S CONTROL MEASURES AND APPLY TEMPORARY SEEDING AND MULCHING. CONTRACTOR TO CLOSELY
MONITOR FOR EROSION ALONG STREAM BANKS.
STAGE 4
ESTABLISH AND MAINTAIN PERMANENT STABILIZATION, INCLUDING VEGETATION OF ALL SLOPES AND GRASSED AREAS.
CONTRACTOR SHALL BE RESPONSIBLE FOR STREAM BUFFER MITIGATION AS SHOWN ON SHEET C5.
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
Section 2. Pollution Prevention Plan.
(reference County Code 17-404 and State Regulation 9VAC25-880-70 part II section A.4)
A. Plan showing pollution activities and prevention practices
B. Sources of Pollutants, locations, and prevention practices
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County
Cl)I
O
W
o \ \ X o N
, ) \
li i U) r, mST, , '
)'` ,
\ 3 i(j? .... 1 _
0 72
! 1cn
I \40®' \ \ O
\ \ Z' I
) ,, (rJ\ SA C,3
\•. r c.l Gl W CA W CA I
0
1 I \\ - i' :
I 8 \ �D \\ m cin NJ
(.0 co» o, oN
l Z
ai o m
J (' 0 o m o K v m m N n Z
Al D
73 O m D z a) c
O -1
)\4 , 1\
(I N ._.4 m
zi
ur
I
) -
\ Io(i_ 0 (-) x i--,=i
X - X. \
I \ `t, /) r<: ..), i i ----- (- N 3
zal
) . i
o O
ccoo m r CO
03 x
— -,___O --
S. , ....j
OC= Q n C N TNi m f
If
I ( c�Nm
�Omn �D
-<
0 { cZiAov
4.4
)- 0 : io _.,,
1-- • (1 - . , .
.....,,,,,
•- to ,-
m r
I-
,, , ,,,,,, ,„, u) _ . •
_ I rn• ao�
k .I,W 11.3
I
•
C IV
-4f:„.:-.e-,,..
,'-'---x- _
, _,, , , ,, ,:,, ,,,, , ,,_ ,......"._
_ , ,,_.>o
, , .
.. ..›.,r-
x:im I
1 v
4bnw, :
k.
NW-4.4!�•.. � !�' ,. --- r(0.74- m_i0(,) / ID LO
' .. ...:.1...;,:::„,,,,,
'0. ,� . _._ m0
40 0 _.-- )
N ,_ ;: — �.
r Hipp •. 1 -.._...—... -0 —1 )
� ---�
------..„.:•• -N. m (--)
.
1 1:. -3(--- . ,,,, _ ._ ... ,_ . _
N41-4:,y).3,,I ' i I
\t 410 0 •
- -—-3i! . _.
-
j ` ]N17]]edl
\0
NC).iN
/ T3 0�\� \ mZ��
a
xP-1<M -
` rn XI Pi 111
o�cvz
0Ox
\ N A Z-' /
\ t :...,„
O W •cD oo rn cn c+ry ff4 � - cn§or D. Dchi o frl r _ ` �— , \ T� D 0-1 < ---
o K \ O ��or�=�OD��Ni�i��i
CD r Tl Z �-(3)Th n00-CZTDDDDPD
G7 C_ 0 D c Q Z _ C O O
�� r ^\ Z7 Q Z =�DmO�=�rmO‹0�c/1 F
0 D D , % `\ -0 >
3 (CD -1 �W0�Om�D ,�1Z���ZC b y
��® S G (D fTl -9 -n a O D 0 cI n
CD .. Ocn� x�-9rzp�Gm� N
= m C 0• O ' •07 \ Q Q — Q 0 /c0cn o�-0Romm-1rr-
'i /0 -, O rt ,�_ �z0(,,, , zaoorn
j :EE \U $1/W \ / 2 77 0 * D CDc)''zrr�mczi–zi M C1
Z 4D u) (f)
y11i.1 \ �-CA \ 1 (-)
(D O Q 21�W c� �zO�rimcoZ
O Z = m ((
,,•-' \ Q Q O XD �J ��O�UlZ71 CO O00 P.-4
I�4 A\ __ (>r) ,
.. fTl — D TI m
!'
\ si-
rn o
:1.. e , �. u.) zccDi)m>�D�r�r7 V1�� �� O ` -"--,,---- ) leek \ Z - U) ° Z o �cn�Z40.40 \__ D cK� (42� �z + m o
1004 mmm D m 0 =
• l/1/ F m0X W Zc� o 0
1 Fri> m—C�
Z XI
II O z _ , �t�0��.., �q3 `gZ.GS6 .9 t vii N m
4. �iy 1d m D -
II )� c oo+o -n-Lbc\ HOZ • o
o \ m I .dis l °9) z
Pollutant,or Pollutant Prevention Practices,
Location on site
Control
Generating Activity 'Measures
C. Sources of Pollutants continued. Common activities and minimum control and prevention
practices
Pollutant,or Pollutant Prevention Practices,
Location on site
Generating Activity Control Measures
Follow Erosion and Sediment Control
Clearing,grading,excavating,and un- Land disturbance area Plan. Dispose of clearing debris at
stabilized areas acceptable disposal sites. Seed and mulch,
or sod within 7 days of land clearing
Cover storm drain inlets and use drip pans
Paving operations Roads and driveways and absorbent/oil dry for all paving
machines to limit leaks and spills
Direct concrete wash water into a leak-
Concrete washout and Current location and detail shown on proof container or leak-proof settling basin
cement waste plan that is designed so that no overflows can
occur
Enclose or cover material storage areas.
Mix paint indoors in a containment area or
Structure construction,stucco, Structures in a flat unpaved area.Prevent the
painting, and cleaning discharge of soaps,solvents,detergents
and wash water,paint,form release oils
and curing compounds.
Water shall be filtered,settled or similarly
Dewatering operations Dewatering sites shown on plan treated prior to discharge as shown on
plan.
Designated areas for material delivery and
Material delivery and storage Designated area shown on plan storage. Placed near construction
entrances,away from waterways and
drainage paths
Material use during building process Building areas Follow manufacturer's instructions.
MSDS's attached.
Waste collection area will not receive a
substantial amount of runoff from upland
areas and does not drain directly to a
Current designated container areas on waterway. Containers have lids covered
Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP)Albemarle County
•
'ollatant,ori Poitrxtant Prevention Practices, ,
llutan tin' ActivityLocation'+on site
g 4ontrot Meastesese :
Solid waste disposal plan before periods of rain,or are in a covered
area. Scheduled collection to prevent
overfilling.MATERIALS NOT TO BE
BURIED ON-SITE
Convenient and well-maintained portable
sanitary facilities will be provided,and
Sanitary waste Current locations shown on plan located away from waterways or inlets.
Such facilities shall be regularly
maintained.
Apply fertilizers in accordance with
Landscaping operations Landscape areas shown on plan manufacturer's recommendations and not
during rainfall events
To be treated in a sediment basin or better
control as specified on plan.Minimize
Wash Waters Wash areas shown on plan
the discharge of pollutants from
equipment and vehicle washing
Vehicle and equipment washing Designated areas and details shown on Provide containment and filtering for all
plan wash waters per the plan
Minimization of exposure to precipitation and stormwater.Minimize the exposure of building materials,building products,
construction wastes,trash,landscape materials,fertilizers,pesticides,herbicides,detergents,sanitary waste,and other materials
present on the site to precipitation and to stormwater.
(Identify all non-stormwater discharges to occur on your site. Keep this plan up-to-date with ongoing site
changes and inspections. See CGP, 9VAC25-880-70 section E for examples of non-stormwater discharges)
D. Non-stormwater discharges
Pollutants or Pollutant Location on Site
Discharge
Constituents
Dust Control Treatment chemicals Designated areas and details shown on
plan
E. Persons responsible for pollution prevention practices
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County
Pete Wildman - Earthworks Excavating, Inc.
4301 Watts Passage
Charlottesville, VA 22911
Phone: (434) 975-2913
RLD #42712
F. Response and reporting practices
Minimize discharges from spills and leaks. Minimize the discharge of pollutants from spills and leaks and
implement chemical spill and leak prevention and response procedures as follows. To the extent practical, do
not store oils, chemicals, or other potential contaminants on site. When storage of potential contaminants is
required, provide secondary containment, such as spill berms or spill containment pallets. These should be
located within the drainage areas to a sediment trap or sediment basin. Direct concrete wash water into a settling
basin, dispose of hardened concrete with other construction waste debris to an appropriate waste facility.
Respond to all spills, leaks and discharges as follows. Spills of oil, petroleum products, sanitary wastes, and
substances listed under 40 CFR parts 110, 117, and 302 should be cleaned up as soon as possible while
protecting worker safety. Construct an earthen dike around any spills on dirt to prevent spreading. If a spill
occurs during rainfall, cover it with a tarp or another impermeable cover to prevent contaminating runoff. Do
not bury any spills or wash them with water. Maintain a spill kits in a readily accessible location. A spill kit
shall consist of a lined drum with bags of universal sorbents in the bottom, accessible without tipping the drum,
sorbent socks above the bags, and personal protective equipment on the top. All materials used to remove the
contaminants, including any water used to rinse equipment, and all dirt removed must be treated as
contaminated. Textiles, such as from coveralls, may be sent to a certified laundry facility. Waste must be
disposed of according to the standards of Albemarle County and the Commonwealth of Virginia. Store
hazardous materials and wastes in covered containers.
Report all spills, leaks and discharges as follows: All spills, leaks, and discharges shall be recorded in the
inspection logs. If construction activity results in a discharge of contaminants that may be reasonably expected
to enter surface waters, the operator shall notify the Department of Environmental Quality immediately or
within 24 hours, and shall submit a written report within five days. For significant spills that cannot be
controlled by personnel in the immediate vicinity, notify the local emergency response by dialing 911.
Albemarle County must also be notified, and potentially some of the following agencies: the Fire Department,
the Public Works Department, the Coast Guard, the Highway Patrol, the County Police Department,
Department of Toxic Substances, OSHA, etc. For spills of federal reportable quantities, in conformance with
the requirements in 40 CFR parts 110, 119, and 302, the contractor should notify the National Response Center
at(800) 424-8802.
G. Pollution Prevention Awareness
The engineer, project superintendent, and contractor shall have weekly meetings to review on-site conditions
and advise contractor of potential risks that should be addressed. Contractor will be responsible for following
procedures on a daily basis and applying appropriate waste management and prevention practices to be in
compliance with the conditions of the general permit. Employees shall be informed of the danger to nature and
to human health of various chemical spills.
Section 3. Discharges to impaired waters, surface waters within an applicable TMDL
wasteload allocation, and exceptional waters.
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
This site discharges to HUC12 020802040202 Ivy Creek—Little Ivy Creek. This river is listed on the EPA's
Impaired Waters for Benthic-Macroinvertebrate Bioassessments for E-Coli and Fecal Coliforms. Site work
shall be in compliance with the following requirements:
1. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final
grade is reached on any portion of the site;
2. Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient
management plan and shall not be applied during rainfall events; and
3. In accordance with Part I B 4 and Part I B 5, inspections shall be conducted as follows:
I. Inspections shall be conducted at a frequency of(i) at least once every four business days or(ii) at
least once every five business days and no later than 48 hours following a measurable storm event.
In the event that a measurable storm event occurs when there are more than 48 hours between
business days, the inspection shall be conducted on the next business day; and
II. Representative inspections used by utility line installation, pipeline construction, or other similar
linear construction activities shall inspect all outfalls discharging to exceptional waters.
Section 4. Qualified personnel
The following personnel are responsible for inspections;
Pete Wildman- Earthworks Excavating, Inc.
4301 Watts Passage
Charlottesville, VA 22911
Phone: (434) 975-2913
RLD #42712
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
Section 5. Signed Certification
CERTIFICATION
"I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and
evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my
knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for
submitting false information, including the possibility of fine and imprisonment for knowing violations."
Owner/Operator Name:
Company:
Title:
Signature:
Date:
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
Section 6. Delegation of authority.
Delegation of Authority
(name), hereby designate the person or specifically described position below to be a
duly authorized representative for the purpose of overseeing compliance with environmental requirements,
including the Construction General Permit, at the construction site. The
designee is authorized to sign any reports,stormwater pollution prevention plans and all other documents
required by the permit.
(name of person or position)
(company)
(address)
(city, state, zip)
(phone)
By signing this authorization, I confirm that I meet the requirements to make such a designation as set forth in
the Construction General Permit (CGP), and that the designee above meets the definition of a "duly
authorized representative".
Operator Name:
Company:
Title:
Signature:
Date:
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
Section 7. Inspection logs
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
Inspections shall be completed at least once every four business days;or at least once every 5 business days and no later
than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more
than 48 hours between business days,the inspection shall be conducted on the next business day. Representative
inspections used by utility line installation, pipeline construction,or other similar linear construction activities shall inspect
all outfalls discharging to exceptional waters.Where an inspection report does not identify any incidents of non-
compliance,the report shall contain a certification that the construction activity is in compliance with the SWPPP and
general permit.
Inspection requirements:
Describe discharges at time of inspection
Record land-disturbing activities outside approved ESCP
Inspect proper installation, maintenance needs, and effectiveness of:
— Perimeter controls, such as silt fence
— Soil stockpiles and borrow areas
— Completed earthen structures(dams, dikes, ditches, diversions,etc.)
— Cut and fill slopes
— Sediment basins and traps,sediment barriers, etc.
— Channels,flumes, slope drains, etc.
— Operational storm inlets
— Construction vehicle access routes
Areas at final grade or to remain dormant for more than 14 days:
— Initiate stabilization activities
— Complete stabilization activities within 7 days of stopping work
Evidence that ESCP has not been properly implemented:
— Concentrated flows of stormwater in conveyances such as rills,rivulets or channels that have not been filtered,
settled,or similarly treated prior to discharge,or evidence thereof;
— Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove sediments
prior to discharge;
— Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to
surface waters. Inlets and catch basins with failing sediments controls due to improper installation, lack of
maintenance, or inadequate design are considered unprotected;
— Sediment deposition on any property(including public and private streets)outside of the construction activity
covered by this general permit;
— Required stabilization has not been initiated or completed on portions of the site;
— Sediment basins without adequate wet or dry storage volume or sediment basins that allow the discharge of
stormwater from below the surface of the wet storage portion of the basin;
— Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of stormwater
from below the surface of the wet storage portion of the trap; and
— Land disturbance outside of the approved area to be disturbed
Pollutant generating activities from PPP: implementation, maintenance, and effectiveness
Pollutant generating activities not identified in PPP
West Leigh SWPPP Grading Log
Inspection:
Date Time
Instructions: Fill out this sheet as grading events occur. Record grading events and their respective locations on this
log.
Summary:
Event on record: Location(s) on Site:
• Major Grading Activities:
• Construction Activities Cease:
o Temporarily:
o Permanently:
• Stabilization Measures Initiated:
• Other Grading Activity Notes:
Inspector Signature Date Operator Signature Date
West Leigh SWPPP Inspection Log
Inspection: Last Rainfall:
Date Time Date Rainfall Amount
Summary(requirements on back of sheet):
Locations of:
• Prohibited discharges
• Controls needing maintenance
• Failed controls:
• Evidence that ESCP has not been properly implemented:
• Additional measures needed:
Corrective actions required:
Unimplemented corrective actions from previous inspection:
Inspector Signature Date Operator Signature Date
"If this report does not identify any incidents of non-compliance, I certify that the construction activity is in compliance with