Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SDP201800023 Review Comments Major Amendment, Final Site Plan 2018-05-18
SDP201800023_SPCA_Engr_review_comments Engineer (10) Subject: Engineer —"M" Page Label: 5 show existing MH o m Author: mwentland Tl T Rs Date: 4/20/2018 3:03:01 PM Color: ■ --------------------------------------------------------------------------------------------------------------------- Subject: Engineer „o ,"-salarysiao Page Label: 10 show safety slab for drops >12' .—pa12 Author: mwentland Date: 5/18/2018 1:19:10 PM t6 Color: ■ --------------------------------------------------------------------------------------------------------------------- show safely slab Subject: Engineer show safety slab for drops >12' for drops>,2' Page Label: 10 =2's zF Author: mwentland s;za ZG Date: 5/18/2018 1:19:48 PM Color: ■ --------------------------------------------------------------------------------------------------------------------- E:.,E Subject: Engineer Provide compaction and fill specifications for pipe Page Label: 10 Author: mwentland installed in fill Date: 5/18/2018 1:21:45 PM Color: ■ --------------------------------------------------------------------------------------------------------------------- � Subject: Engineer dimension loading-- page Label: 5 dimension loading space space A"' Author: Author: mwentland SPACE Date: 5/18/2018 1:29:23 PM Ro Color: ■ --------------------------------------------------------------------------------------------------------------------- Subject: Engineer label sidewalk width; also, provide bumper blocks, label sidewalk width; Page Label: 5 \�blod,,,else 6' walk width ref else I,'—IkAuthor: mwentland width 7 to — Date: 5/18/2018 1:29:27 PM I Color: ■ --------------------------------------------------------------------------------------------------------------------- ,0•` Subject: Engineer show dimensions, dumpster pad #'show dimensions, Page Label: 5 dumpster pad Author: mwentland \ Date: 5/18/2018 1:29:38 PM Color: ■ ., --------------------------------------------------------------------------------------------------------------------- Subject: Engineer Provide note if Ex. UG detention will remain. Page Label: 4 Author: mwentland VSMP review may result in additional SP Date: 5/18/2018 1:29:51 PM comments. Color: ■ ►MENT --------------------------------------------------------------------------------------------------------------------- Subject: Engineer VSMP Plan approval required prior to FSP Page Label: 1 VSMP Fan approval requiretl p,i—FSP appro prior ro val. Author: mwentland approval. Date: 5/18/2018 1:30:57 PM Color: 0 --------------------------------------------------------------------------------------------------------------------- GSubject: Engineer Provide dumpster pad section detail with Site y Page Label: 9 Details o o Author: mwentland F Date: 5/18/2018 1:36:54 PM Color: ■ Group (2) "I i Subject: Group Page Label: 10 7LEE�-7--:: Author: mwentland Date: 5/18/2018 1:26:56 PM Color: ■ VSMP plan should consider proposed effect on Ex. UG detention system. --------------------------------------------------------------------------------------------------------------------- Subject: Group Provide additional detail; i.e. Stormceptor Mfr. Page Label: 12 Author: mwentland installation guidelines /details =� Date: 5/18/2018 1:34:41 PM Color: ■