Loading...
HomeMy WebLinkAboutSDP201800023 Review Comments Major Amendment, Final Site Plan 2018-05-18SDP201800023_SPCA_Engr_review_comments Engineer (10) Subject: Engineer —"M" Page Label: 5 show existing MH o m Author: mwentland Tl T Rs Date: 4/20/2018 3:03:01 PM Color: ■ --------------------------------------------------------------------------------------------------------------------- Subject: Engineer „o ,"-salarysiao Page Label: 10 show safety slab for drops >12' .—pa12 Author: mwentland Date: 5/18/2018 1:19:10 PM t6 Color: ■ --------------------------------------------------------------------------------------------------------------------- show safely slab Subject: Engineer show safety slab for drops >12' for drops>,2' Page Label: 10 =2's zF Author: mwentland s;za ZG Date: 5/18/2018 1:19:48 PM Color: ■ --------------------------------------------------------------------------------------------------------------------- E:.,E Subject: Engineer Provide compaction and fill specifications for pipe Page Label: 10 Author: mwentland installed in fill Date: 5/18/2018 1:21:45 PM Color: ■ --------------------------------------------------------------------------------------------------------------------- � Subject: Engineer dimension loading-- page Label: 5 dimension loading space space A"' Author: Author: mwentland SPACE Date: 5/18/2018 1:29:23 PM Ro Color: ■ --------------------------------------------------------------------------------------------------------------------- Subject: Engineer label sidewalk width; also, provide bumper blocks, label sidewalk width; Page Label: 5 \�blod,,,else 6' walk width ref else I,'—IkAuthor: mwentland width 7 to — Date: 5/18/2018 1:29:27 PM I Color: ■ --------------------------------------------------------------------------------------------------------------------- ,0•` Subject: Engineer show dimensions, dumpster pad #'show dimensions, Page Label: 5 dumpster pad Author: mwentland \ Date: 5/18/2018 1:29:38 PM Color: ■ ., --------------------------------------------------------------------------------------------------------------------- Subject: Engineer Provide note if Ex. UG detention will remain. Page Label: 4 Author: mwentland VSMP review may result in additional SP Date: 5/18/2018 1:29:51 PM comments. Color: ■ ►MENT --------------------------------------------------------------------------------------------------------------------- Subject: Engineer VSMP Plan approval required prior to FSP Page Label: 1 VSMP Fan approval requiretl p,i—FSP appro prior ro val. Author: mwentland approval. Date: 5/18/2018 1:30:57 PM Color: 0 --------------------------------------------------------------------------------------------------------------------- GSubject: Engineer Provide dumpster pad section detail with Site y Page Label: 9 Details o o Author: mwentland F Date: 5/18/2018 1:36:54 PM Color: ■ Group (2) "I i Subject: Group Page Label: 10 7LEE�-7--:: Author: mwentland Date: 5/18/2018 1:26:56 PM Color: ■ VSMP plan should consider proposed effect on Ex. UG detention system. --------------------------------------------------------------------------------------------------------------------- Subject: Group Provide additional detail; i.e. Stormceptor Mfr. Page Label: 12 Author: mwentland installation guidelines /details =� Date: 5/18/2018 1:34:41 PM Color: ■