Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SDP201800023 Review Comments Minor Amendment 2018-05-21
SDP201800023-SPCA Engineering Review Comments (summary) Engineer (11) Subject: Engineer Page Label: 5 show existing MH o m Author: mwentland Tl T Rs Date: 4/20/2018 3:03:01 PM Color: ■ --------------------------------------------------------------------------------------------------------------------- Subject: Engineer „o ,"-a"eryaao Page Label: 10 show safety slab for drops >12' Author: mwentland Date: 5/18/2018 1:19:10 PM Color: ■ --------------------------------------------------------------------------------------------------------------------- show safely slab Subject: Engineer show safety slab for drops >12' for drops>,2' Page Label: 10 =2's zP Author: mwentland s;za ZG Date: 5/18/2018 1:19:48 PM Color: ■ --------------------------------------------------------------------------------------------------------------------- E:.,E Subject: Engineer Provide compaction and fill specifications for pipe Page Label: 10 Author: mwentland installed in fill Date: 5/18/2018 1:21:45 PM Color: ■ --------------------------------------------------------------------------------------------------------------------- � Subject: Engineer dimension loading-- page Label: 5 dimension loading space space A"' Author: Author: mwentland SPACE Date: 5/18/2018 1:29:23 PM Color: ■ --------------------------------------------------------------------------------------------------------------------- Subject: Engineer label sidewalk width; also, provide bumper blocks, label sidewalk width; Page Label: 5 \�blod,,,else 6' walk width ref else I,'—IkAuthor: mwentland width 7 to — Date: 5/18/2018 1:29:27 PM I Color: ■ --------------------------------------------------------------------------------------------------------------------- ,0•` Subject: Engineer show dimensions, dumpster pad #'show dimensions, Page Label: 5 dumpster pad Author: mwentland \ Date: 5/18/2018 1:29:38 PM Color: ■ --------------------------------------------------------------------------------------------------------------------- ., Subject: Engineer Provide note if Ex. UG detention will remain. Page Label: 4 Author: mwentland VSMP review may result in additional SP Date: 5/18/2018 1:29:51 PM comments. Color: ■ --------------------------------------------------------------------------------------------------------------------- G m Subject: Engineer - Page Label: 9 Provide dumpster pad section detail with Site o Author: mwentland Details i Date: 5/18/2018 1:36:54 PM P Color: ■ MARLE SPCA DMENT --------------------------------------------------------------------------------------------------------------------- Subject: Engineer Page Label: 1 1. VSMP Plan approval is required prior to MIA iwW;m.. Author: mwentland approval. 2. VSMP/WPO bond is required prior to MIA Date: 5/21/2018 9:09:56 AM approval. Color: ■ 3. Easements must be recorded prior to MIA approval. --------------------------------------------------------------------------------------------------------------------- Subject: Engineer Page Label: 6 Author: mwentland Provide guardrail to ensure adequate parking lot safety. Date: 5/21 /2018 9:11:45 AM Color: ■ Group (2) Subject: Group ` Page Label: 10 Author: mwentland �. Date: 5/18/2018 1:26:56 PM Color: ■ VSMP plan should consider proposed effect on Ex. UG detention system. --------------------------------------------------------------------------------------------------------------------- Subject: Group Provide additional detail; i.e. Stormceptor Mfr. Page Label: 12 Author: mwentland installation guidelines /details �m Date: 5/18/2018 1:34:41 PM Color: ■