HomeMy WebLinkAboutSDP201800023 Review Comments Minor Amendment 2018-05-21SDP201800023-SPCA Engineering Review Comments (summary)
Engineer (11)
Subject: Engineer
Page Label: 5 show existing MH
o m Author: mwentland
Tl T Rs Date: 4/20/2018 3:03:01 PM
Color: ■
---------------------------------------------------------------------------------------------------------------------
Subject: Engineer
„o ,"-a"eryaao Page Label: 10 show safety slab for drops >12'
Author: mwentland
Date: 5/18/2018 1:19:10 PM
Color: ■
---------------------------------------------------------------------------------------------------------------------
show safely slab Subject: Engineer show safety slab for drops >12'
for drops>,2' Page Label: 10
=2's zP Author: mwentland
s;za ZG Date: 5/18/2018 1:19:48 PM
Color: ■
---------------------------------------------------------------------------------------------------------------------
E:.,E Subject: Engineer Provide compaction and fill specifications for pipe
Page Label: 10
Author: mwentland installed in fill
Date: 5/18/2018 1:21:45 PM
Color: ■
---------------------------------------------------------------------------------------------------------------------
� Subject: Engineer
dimension loading-- page Label: 5 dimension loading space
space
A"'
Author: Author: mwentland
SPACE
Date: 5/18/2018 1:29:23 PM
Color: ■
---------------------------------------------------------------------------------------------------------------------
Subject: Engineer label sidewalk width; also, provide bumper blocks,
label sidewalk width; Page Label: 5 \�blod,,,else 6' walk width
ref
else I,'—IkAuthor: mwentland
width 7 to — Date: 5/18/2018 1:29:27 PM
I Color: ■
---------------------------------------------------------------------------------------------------------------------
,0•` Subject: Engineer
show dimensions, dumpster pad
#'show dimensions,
Page Label: 5
dumpster pad Author: mwentland
\ Date: 5/18/2018 1:29:38 PM
Color: ■
---------------------------------------------------------------------------------------------------------------------
., Subject: Engineer Provide note if Ex. UG detention will remain.
Page Label: 4
Author: mwentland VSMP review may result in additional SP
Date: 5/18/2018 1:29:51 PM comments.
Color: ■
---------------------------------------------------------------------------------------------------------------------
G m Subject: Engineer
- Page Label: 9 Provide dumpster pad section detail with Site
o Author: mwentland Details
i Date: 5/18/2018 1:36:54 PM
P Color: ■
MARLE SPCA
DMENT
---------------------------------------------------------------------------------------------------------------------
Subject: Engineer
Page Label: 1
1. VSMP Plan approval is required prior to MIA
iwW;m..
Author: mwentland
approval.
2. VSMP/WPO bond is required prior to MIA
Date: 5/21/2018 9:09:56 AM
approval.
Color: ■
3. Easements must be recorded prior to MIA
approval.
---------------------------------------------------------------------------------------------------------------------
Subject: Engineer
Page Label: 6
Author: mwentland
Provide guardrail to ensure adequate parking lot
safety.
Date: 5/21 /2018 9:11:45 AM
Color: ■
Group (2)
Subject: Group
` Page Label: 10
Author: mwentland
�. Date: 5/18/2018 1:26:56 PM
Color: ■
VSMP plan should consider proposed effect on Ex.
UG detention system.
---------------------------------------------------------------------------------------------------------------------
Subject: Group Provide additional detail; i.e. Stormceptor Mfr.
Page Label: 12
Author: mwentland installation guidelines /details
�m Date: 5/18/2018 1:34:41 PM
Color: ■