Loading...
HomeMy WebLinkAboutWPO201500038 Inspection WPO VSMP 2018-02-28 719 rt, pu 6 z/14/14ee Rashid bp affirm t: fta tic 411'1- ewer: Fereaud is Mamas!Amt I tat BOND INSPECTION REQUEST APPROVED PLAN# 11,1% 20 1S •000. PROJECT NAME: Qun!o eA V (As listed on the approved plan) This is to request that an inspection be performed by the County. Where fees are assessed,a fee is requited for each inspection. Please check the inspections requested. iIVSMP/VESCP Erosion Control,Stormwater Management and/or Mitigation per Water Protection Ordinance section 17-207&208 $250 Q Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435 and 14-438; $269 0 Water&Sewer per Subdivision Ordinance section 14-435 $269 O Site Development Performance bond(Incomplete Site Work&Landscape Maintenance) $301 TOTAL PEES ' 250 inspections for the purposes of bond reduction or release will require a separate fee for each bond. Submit requests to: Department of Community Development,401 McIntire Road,North Wing,Charlottesville, VA 22902,Attention:Management Analyst.Phone 434-2965832;Fax 434-972-4126. All roads and stormwater facilities will require construction record drawings,inspection reports,and completion processes through VDOT or DEQ. Bonds will not be reduced or released without record drawings and inspection documentation per the state requirements and county's published procedures.A minimum 20%of the original posting is held until acceptance of all bonded improvements. For Site Development Performance bonds,if landscape installation is part of the bonded incomplete site work,a request for reduction should only be made once all site work is complete. The revised estimate should be sent to; EMAIL: eta,a...ael4.,as-to OR REGULAR MAIL ADDRESS: 'RYS 2.'"1 ST 1� oft er/Developer L5 [ j 2/z3/1g Print Name • Date Revised 711512014,7/20/2015,11/3/2015 . cg"Less 14.01mpliant❑ Notice to Comply 16 Stop Work e✓it42 0 Bond Inv 0 •7,1111 ef,; Warning D Under NTC 0 % li"e Under SWO 0 Re-inspection (fee) ❑ SWPPP INSPECTION Project Name: ),rr (,per T File Number: "flo 2n l 5-• Uvu3 8 DEQ General Permit Number: UI R 1O l 0 LiS County Inspector: ..jat,t Inspection Date: S/3o//7 Time: //. o<., For Warnings or Notices, DATE TO COMPLY BY 6/6/1 Initial controls 0 Clearing 0 Rough Grading 0 Construction❑ Finish Grading 0 Stabilizatio swm conversion 0 Compliance Comments/Notes Yes No Posting at the The coverage letter and SWPPP book location must be posted in a prominent place at site entrance / the entrance to the job'site, available to the public on request. SWPPP The complete document must be available for inspection on-site available for ,/ review ‘l? �. iv rs ,s jp keal_144 moi - rv/tet4 . Coverage / A c0rent coverage letter(expiration date of 2019) must be included letter / Registration A registration statement must be included that goes with the coverage letter. The Statement / acreage disturbed must be accurate. PPP plan l/ A copy of the pollution prevention plan and a copy of the current DEQ permit code must b included in the SWPPP. Th plan must be marked to show location of measures. tZ env 4- UUd }rc1va-1' ' QC Ccdre.4 re,Airl4,0").3 Inspection Reports must be up-to-date, informative, documenting problems, and occurring at reports required intervals. Rain ev nts and inspections for rainievents m4st Ile noted. Inspection Results of inspections must be followed up with corrective actions where necessary reports/corre ctive actions Corncc.J.,K, c-1,4ow�S x.- 'PeevaleeP cs C,0 ie ,.,/ Fueling Fueling stations must be contained, and spill prevention and creanup kits in place station Washouts / A lined sump area must be provided for any concrete washout. Washout facilities for ✓ paint, grouts, etc. are also needed. Trash and Trash and debris must be cleaned up so that it does not leave the job site. Any debris contaminates must be protected from becoming runoff during rains (cover dumpsters). Trash is not to be buried on-site. Sanitation Sanitation facilities must be provided and maintained, and protected from spills, away from inlets. Erosion and Sediment NTC IsSuA-a( rectt,cr,A' 6J rrc�47-.n5 ar CrPi Dr ?cokc.h'a..S c....-4,A Control and yosr•l,^ 4•0/ 0V Sce.c,L,,5 Ou..,tA .ct) cc.s , Stormwater J Management per plans and Standards 4ompliant 0 Notice to Comply[y diF'' Stop Work❑ Bond lnsp❑ Warning❑ Under NTC 0 Under SWO 0 Re-inspection(fee) 0 Erosion Control Inspection Report Project Name: \D(k- (.4. re" V_ File Number: (A)Pu '.0 15---00038 County Inspector: -cw,- �>t-fo Inspection Date: 5/3o/i7 Time: 1/'°4-' For Warnings or Notices, DATE TO COMPLY BY d o/ 7 Initial controls 0 Clearing 0 Rough Grading 0 Construction❑ Finish Grading 0 Stabilization swm conversion❑ Compliance Comments/Notes Yes No Silt, safety, / OJS9c1)4ck 04-e-0,5 o � Pe-r;ny`el n.r SP (p4- (tACA-'•4'6"Z-,ed/,.sS fr%) tree fence Diversions, Berms, (U „- ditches -� Inlet, culvert (T P u5t r,5 'A-2- o;t1 mud.cA Sk,".c. tAkk- elact t protection DI- it- 202.,/I 2A 0,-ot 2-Z8 ri.iA5l4,skecAt.kiGv% c".t' Co-natrni clic nose Stream work, l`J crossings Traps, ST t� r• Mono()ccil cv.o& 51-a‘0,‘ l;rez Basins N Stabilization OU Qf S e e.c t ill 0 0\,\c,t. 50 ( a m ea.et rki e1,1> ed t o GleaS \okS 4- a 4-L. - Entrances Limits Near llrer v I Ws Receired: / Fes . 7 gO Received e ^, Wake: Fwd Aseyst : % BOND INSPECTION REQUEST APPROVED PLAN# \AITO 2AlS -3S PROJECT NAME: '1j & c — W!() �i (As listed on the approved plan) This is to request that an inspection be performed by the County. Where fees are assessed,a fee is required for each inspection.tiPlease check the inspections requested. Gi VSMP/VESCP Erosion Control,Stormwater Management and/or Mitigation per Water Protection Ordinance section 17-207&208 $250 ❑ Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435 and 14-438; S269 ❑ Water&Sewer per Subdivision Ordinance section 14-435 $269 ❑ Site Development Performance bond(Incomplete Site Work&Landscape Maintenance) $301 TOTAL FEES 4 Zg3 Inspections for the purposes of bond reduction or release will require a separate fee for each bond. Submit requests to: Department of Community Development,401 Mclntire Road,North Wing,Charlottesville, VA 22902,Attention:Management Analyst-Phone 434-296-5832;Fax 434-972-4126. All roads and stormwater facilities will require construction record drawings,inspection reports,and completion processes through VDOT or DEQ. Bonds will not be reduced or released without record drawings and inspection documentation per the state requirements and county's published procedures.A minimum 20%of the original posting is held until acceptance of all bonded improvements. For Site Development Performance bonds,if landscape installation is part of the bonded incomplete site work,a request for reduction should only be made once all site work is complete. The revised estimate should be sent to; EMAIL: LZe,Mak 3C e.vme S.Co OR REGULAR MAIL ADDRESS: 300 2 S't Vt. Cw\kt iA Z24o2, )414;(3 stare of Owner/Developer 4/C/17 Print Name D IAC194'19;\ &VIV49—0 b1/0/4 ;/' a 5, O 1 � ,S 0)- , ` ° Revised 7/15/2014,7/20/2015,11/3/2015 DU NLORA V,LLD 41.1S union rinsillaucer BANK 1141 300 2ND ST NE C14ARLOTTESVILLE,VA 22902 6/13/2017 PAY ORDER op City of Albernade-Community Dev. $ **250.00 Two Hundred f=ifty and 00/100**".**'"***"""�.***'"""`"'***". *'*"""'**"""""'*...*.*'".`*"... *****'"..«*........«...* DOLLARS County of Albemarle-Community Dev. 401 McIntire Road Charlottesville,VA 22902 MEMO ` V 80 mow/FEATURES INCLUDED.DETAILS ON SACK 8. le001 •:05 L403 L64': 850249674W • County of Albemarle 11,0027 Department of Community Development PH:(434)296-5832Date ' /y( / J RECEIVED FROM: 0 t14//a v' V/ AMOUNT: 7'(,(/i � ✓� �' 1'l�//�.✓� �� (O ty $ �- a 307 308 � 510 check j 1 Y ( For: p� / UP V a0 I C`— oo O ? credi By