From: John Anderson
Sent: Saturday, September 19, 2015 9:10 AM
To: Bill Ledbetter; Dave Brockman
Cc: Johnathan Newberry; Glenn Brooks
Subject: WPO2015-00066, Old Trail Village, block 15 Amendment-VSMP
Bill,Dave,
(Johnathan,please see bold,below)
Earlier this year,when I felt we were making progress on the Master Plan in June only to be surprised in July with novel
approach to applicable technical criteria(resolved in August), I was struck by Old Trail's time/resource commitment to
seeking a particular outcome.
I ask for that now in relation to stormwater management design that must be thoughtful, compliant,and safe well into the
future for residents,the public,public/private streets,environment, streams/buffers,HOA-maintained SWM facilities, and
the community broadly.
This past year,experience of working on Old Trail projects has left a mixed impression: near-constant rush to approve,yet
months-long delay relating to Master Plan. I value working relationships with designers at RGA, Stantec,and OTV,yet
my purpose is to identify requirements,compare design with standards,identify discrepancies,remedy my own mistakes,
and approve design that meets standards. I hope to preserve relationships. If unable to convince that my role is necessary
and not excessive, I hope at least to preserve relationships. I say this because it appears to me that a possible reaction to
this note(or review comments when available)may be: "What are we supposed to do?"
I do not have a ready answer. We have not reached agreement on a Master Plan,and cannot fall back on a Master Plan if
SWM design for blocks 11, 14, 12 and 15 must rely on control in another area of Old Trail Village.
The sediment basin now serving block 12,phase 1 has been in place for years. Sediment basins are not designed to be
permanent structures. This basin's original design we now understand is insufficient to meet design criteria for geometry,
volume,or construction of a permanent SWM facility. The riser and barrel are proposed to be replaced, a circumstance
VSMH warns against(Spec. 3.06). Replacing barrel/riser requires opening embankment to depth of floor of basin,risking
embankment integrity and at once removing runoff control during conversion to permanent SWM facility.
Questions:
What will happen to block 11, 14, 12, 15 post-developed runoff during conversion to permanent SWM facility?
Will equipment have adequate access? Has an Earthen Embankment to retain permanent pool been properly considered?
Is it possible to construct embankment(or modify existing sediment basin)to meet requirements of DEQ BMP
Clearinghouse Appendix A, Earthen Embankments?
What are the obstacles to conversion,or runoff control during conversion,or runoff control options during conversion?
Design proposes 9VAC25-870-96,Table 1, Retention basin III(4 x WQV with aquatic bench)to control storm runoff
from blocks 11, 14, 12, 15. Permanent pool depth>9 ft is proposed. Qio(short-duration) depth will approach 15 ft.
The facility is in very close proximity to residential development. During special exception(to zoning)request to allow
SWM facility replacement,a board member expressed concern with design, reflecting understanding that OTV
homeowners are skeptical if not opposed to permanent pool facilities. This permanent pool facility is proposed to replace
an approved bioretention design without permanent pool. Proposal includes grading to the very edge of Rowcross, close
to Lot 23 (in fact,Final Plat New SWM Easement is shown crossing this Lot). Design proposes an emergency spillway
that sweeps toward Old Trail Drive,the development's primary means of access. Riser/barrel structure are slated to be
replaced.
41100
Final Plat, Road Plan, Site Plan, and VSMP plans are and were submitted with timing sequence that now proves
problematic(see private/public street, below).
The retention basin earthen embankment will be reviewed in detail. All applicable requirements in DEQ BMP
Clearinghouse Appendix A, Earthen Embankment, should be considered,including: subsoil analysis/permeability tests;
max. slopes;pool depth; materials; density/compaction(tests during construction required); cut-off trench; other. Please
reference DEQ Appendix A Earthen Embankment, as review will reference it often. VDOT must review VSMP. County
is sensitive to VDOT comments. VDOT reviews VSMP Applications to assess potential impact to VDOT facilities,or
public RW. This design has potential to impact Rowcross Street(private RW), and Old Trail Drive(public). Although
Rowcross private right-of-way was reviewed without objection by Engineering, SDP2015-00007,Old Trail Village Block 12
Phase 2—Final Site Plan is not approved. If grades shown with this WPO require revision to road plan, and they appear to,
or if there is contention concerning general welfare or safety,then this may affect Final Site Plan Approval. Grading
shown with WPO2015-00066 appears inconsistent with approved road plan grades. This is consequence of road plan
coming in prior to and without a VSMP/WPO.
Please accept and consider any VDOT/Engineering WPO comments relating to SWM facility design relating to safety or
general welfare. This note suggests we avoid dispute centering on Rowcross St.private right-of-way.
It may or may not be too late for Albemarle County to revisit designation of Rowcross Street as a private street(Private
Street Authorization request submitted?),or to require Rowcross be public to intersection with Alley A.
I would not write if I were not hopeful. County ordinance and state law insist on design that is safe, compliant, and
effective. If retention basin III design cannot meet VSMH Spec. 3.06 design criteria—if, for example, size must be
reduced—then pollutant loading reduction required may be met via on-site(this BMP; or overall demonstration of
development-wide compliance via Master Plan [not yet complete])and off-site(Lickinghole Basin)credit. Terms of off-
site credit are outlined in 21-Nov 2014 email guidance. 21-Nov 2014 guidance may require clarification,or discussion.
From an Engineering perspective,there is no higher priority than safety and general welfare, including long-term, low-
maintenance operation of a basin with pool>9 ft. The basin must be designed and built consistent with VSMH, 1999,
Spec. 3.06. The earthen embankment must be designed and built consistent with DEQ BMP Clearinghouse Appendix A,
Earthen Embankment. Please reference details in Spec. 3.06 and Appendix A, as comments are certain to reference these
design documents.
These statements are not review comments,but are intended to be helpful. I understand pressure to develop quickly,have
in the past and will likely continue to adjust review schedule to support development needs. Engineering review,
however,principally serves compliance, and this design is problematic. It represents revision to approved bioretention
basin design (no permanent pool); it proposes depths deeper than recommended (see Spec. 3.06,2'-6'). Proposed design
is the predicable consequence of limiting space to perimeter-only permanent SWM facilities. Lots are maximized with
this design. Permanent pool depth is excessive. Design intrudes on stream buffers. The burden of the question "what are
we to do?" lies with developer and designer,not Albemarle County.
Design elements are critical. I am frustrated. It has come to this,and this is problematic. Approval depends on design,
routing summaries,narrative, and sequence that ensure compliance.
RGA and Old Trail Village are welcome to request meetings,though we ask to avoid expectation for immediate
meetings. I explained Thu morning when I visited RGA office to discuss block 12,phase 2 Final Plat that I felt it may be
two weeks before I comment on this WPO—a fair estimate. I spent time yesterday noting items of concern or
importance. It would be misleading to promise quick approval of a proposal to replace the currently approved bio-
retention basin with a 9VAC25-870-96 Table 1 retention basin III(4 x WQV with aquatic bench).
Also,revised WPO plans cannot in this instance be reviewed as .PDFs,given level of detail and likely extent of revisions.
I will speed review as much as possible,and truly,hope this note is helpful.
Thank you
John E.Anderson,PE I Civil Engineer II
Department of Community Development I County of Albemarle,Virginia
2
401 McIntire Road I Charlottesville,VA 22 02 '04001
434.296.5832 ext.3069
3
441111110.' %%IS
Johnathan Newberry
From: Johnathan Newberry
Sent: Tuesday, September 08, 2015 10:55 AM
To: Rebecca Ragsdale
Cc: Megan Yaniglos
Subject: FW: block 12, 15, Old Trail
Thought you'd want to be in this loop too.
From:John Anderson
Sent:Tuesday,September 08, 2015 10:33 AM
To: David Brockman<dave@oldtrailvillage.com>; Bill Ledbetter<BLedbetter@roudabush.com>
Cc: Mark Hopkins<mhopkins@albemarle.org>; Geoff Elsie<gelsie@albemarle.org>; Glenn Brooks
<GBROOK5@albemarle.org>;Johnathan Newberry<jnewberry@albemarle.org>
Subject: block 12, 15, Old Trail
Dave,Bill,
I visited Old Trail Saturday, and spoke with Mark Hopkins and Geoff Elsie earlier this morning about grading activity in
blocks 12 and 15. Pads have been prepared and are being developed(built upon)in block 12,phase 2. I will try to
coordinate WPO/VSMP status with other staff in the future,but for the moment, development and construction of
dwellings in block 12,phase 2 (Craig Builders)precedes SWM plan approval for this section. We are making progress on
design,review, and approval of post-developed SWM control for block 12,phase 2, and block 15,phase 2. For the
moment, however,there is no approved SWM plan for these block phases. I am writing to clarify that limits of
disturbance and limits of development cannot exceed areas permitted under approved SWM plans. This means:
Albemarle County expects no Applications for building permits for any lots in block 12,phase 2, or block 15,phase 2,
prior to SWM plan approval and Final Plat approval of lots in these block phases. Also, we anticipate no grading beyond
mass-grade contours shown on approved WPO201400071.
Please let me know if you have any questions. Thank you.
John E.Anderson, PE I Civil Engineer II
Department of Community Development I County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3069
1
'`d"
Johnathan Newberry
From: Alex Morrison [amorrison@serviceauthority.org]
Sent: Wednesday, April 22, 2015 9:56 AM
To: Johnathan Newberry
Subject: SUB201400161: Old Trail Village Block 15-Final
JT,
I have reviewed the plat and have no comments. I hereby recommend approval of SUB201400161.
Alexander J. Morrison,EIT
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville,Virginia 22911
(0)434-977-4511 Ext. 116
(F)434-979-0698
Like the ACSA on Facebook at www.facebook.com/acsaconnect
1
COUNTY OF ALBEMARLE
of fAirr Department Community Development
E Planning Services Division
xa+ ,, ,; 401 McIntire Road North Wing• Charlottesville,Virginia 22902-4596
Phone:(434)296-5823 •Fax: (434)972-4035
Transmittal
From: JT Newberry Date: 04/08/15
To: Andrew Slack- E911 0
OJeremy Lynn-ACSA 0
°John Anderson- Engineering 0
°Shelley Plaster-VDOT 0
ORobbie Gilmer-Fire and Rescue 0
JOB#/FILE NAME:SUB-2014-00161 Old Trail Village Block 15-Final
We are sending you the following items: /1 Attached or ❑ Under separate cover
❑ Copy of Letter ❑ Prints ❑ Plans
❑ Plats ❑ Specifications ❑ Other
#of Copies Date Description
1 4/2/15 Old Trail Village Block 15 -Final
These are transmitted as checked below:
® For review and comments ®For approval ❑ Other
Remarks: Bill Ledbetter prepared the original fmal plat(dated 9/25/2014) and David Jordan has
prepared this latest revision. Some reviewers have already provided "no objection" on earlier versions,
but I wanted to confirm your approval with this latest revision. Thanks.
Comments are due in City View or email by: 4/24/15 Signature: JT Newberry
PHONE(434)977-0205
FAX(434)296-5220
"'r" INFO@ROUDABUSH.COM
ROUDABUSH, GALE & ASSOC., INC.
LAND SURVEYING A PROFESSIONAL CORPORATION
914 MONTICELLO ROAD
ENGNEERING
LAND PLANNING CHARLOTTESVILLE,VIRGINIA 22902
J.THOMAS GALE.L.S.
MARILYNN R.GALE,LS.
WILLIAM J.LEDBETTER.LS
EDWARD D.CAMPBELL III.L.S. C4.14.�Q_ y\ ' (/ 2 lo C) 15
Attn: Megan Yaniglos c;
Senior Planner ` I �`
Albemarle County yok LWC •,1 strfZS '—'4
Department of Community Development
401 McIntire Road d kicks �� �t/ r�� 44-4Charlottesville, Virginia 22902 �� &/D ( L4.(Dl
Regarding: Old Trail Village Block 15 lj ZSI�.( W� Just aeI,+
Request for Private Street Authorization 'Ptak C i,, o.n `ILS,
Request for Waiver of Street Standards
IA* re N.A..w
Dear Ms. Yaniglos:
In accordance with Section 14-233 of the Albemarle County Code of Ordinances, we are requesting the
authorization of a private street in Block 15 of Old Trail Village, using the Neighborhood model development
[Section 14-233(A)(1)(iii)] as justification. The proposed private street, "Court Mont Way", would provide a
streetscape that is more consistent with the neighborhood model because it will mirror the overall road design of
the blocks surrounding it, specifically Blocks 11 and 14. The overall design of Block 15 will better achieve the
density goals of the comprehensive plan with a private street than with a public street. Because we are
eliminating the larger Right-of-Way, planting strip, and sidewalk requirements, more space will be available for
housing and lots, which in turn, will allow for a development with a higher density. Through the use of a private
street, rear vehicular access to the houses would be provided so that the buildings may face a common amenity
(i.e. public street frontage for every lot). A significant environmental resource would not be protected with either
a public or private street. Additionally, a private street would provide more space for additional parking for each
lot in the subdivision. Houses will be able to have a total of 4 parking spaces (two for the house tenants in the
garage and two guest spaces in the driveway).
In accordance with Section 14-422(E)(1) and 14-422(F)(1), we are requesting a waiver for the requirement of
sidewalks and planting strips along "Court Mont Way" in Block 15 of Old Trail Village. We feel that sidewalks and
planting strips are not necessary along this private street due to the fact that "Court Mont Way" serves as a rear
access to all of the lots in Block 15. Additionally, sidewalks and street trees are provided on the fronts of the
units and along the public streets "Claremont Lane" and "Fielding Run Drive".
Thank you for your consideration regarding this request, and as always, if I can be of any assistance, please do
not hesitate to ask.
Best regards,
Christopher, C. Mulligan
Johnathan Newberry
From: Jeremy Lynn [jlynn@serviceauthority.org]
Sent: Friday, December 19, 2014 10:39 AM
To: Johnathan Newberry
Cc: Bill Ledbetter; Alex Morrison
Subject: Old Trail Village
J.T.,
The ACSA has approved the plans for Old Trail Village Block 12, Phase 1 and Old Trail Village Block 15. Let me know if
you have any questions or need anything else from our office.
Jeremy M. Lynn, P.E.
Senior Civil Engineer
Albemarle County Service Authority
168 Spotnap Road, Charlottesville, VA 22911
(434) 977-4511 ext. 114
1
Nome
Johnathan Newberry
From: Ana Kilmer
Sent: Thursday, December 18, 2014 2:36 PM
To: Jeffrey S. Hall; Dave Brockman; 'Bill Ledbetter'
Cc: Kenny Thacker; Mark Hopkins; John Anderson; Todd Shifflett; Esther Grace; Johnathan
Newberry
Subject: old trail village block 12 phase 1 and block 15 phase 1 performance bonds
The following bonds have been posted and approved:
Old Trail Village Block 12 Phase 1 Erosion Control and Stormwater Management Plan—WPO-2014-00071
Erosion and Sediment Control - $40,540
The Lickinghole fee and the permit and first year inspection fee have been paid
Subdivision Plat, Old Trail Village Block 12 Lot A and Lot B
Subdivision/Road Performance Bond - $87,780
Subdivision Plat, Old Trail Village Block 12 Lot A and Lot B
Subdivision/Road Performance Bond -Water and Sewer- $58,200
Old Trail Village Block 15 Phase 1 Road and Utility Plan
Subdivision/Road Performance Bond - $102,530
Old Trail Village Block 15 Phase 1 Road and Utility Plan —Water& Sewer
Subdivision/Road Performance Bond - $101,000
Thanks
Ana D. Kilmer
Management Analyst
County of Albemarle
Community Development Department
401 McIntire Road
Charlottesville,VA 22902
434-296-5832
akilmer@albemarle.org
Note: I will be out of the office 12/29/2014-1/2/2015. I will return 1/5/2015
1
COUNTY OF ALBEMARLE
of A Department Community Development
� arii1
�'�?0_.�, Planning Services Division
�� .'�;�,; 401 McIntire Road North Wing• Charlottesville,Virginia 22902-4596
Phone: (434)296-5823 •Fax: (434)972-4035
Transmittal
From: JT Newberry Date: 11/13/14
To: John Anderson-Engineering 0
OAndrew Slack- E911 0
OTroy Austin-VDOT 0
OJeremy Lynn- ACSA 0
ORobbie Gilmer-Fire and Rescue 0
JOB#/FILE NAME:SUB-2014-00161 Old Trail Block 15 -Final
We are sending you the following items: ® Attached or El Under separate cover
El Copy of Letter El Prints ❑ Plans
El Plats El Specifications ❑ Other
# of Copies Date Description
1 9/25/14 Final Plat
These are transmitted as checked below:
® For review and comments ® For approval El Other
Remarks: I overlooked this file in my office and neglected to transmit it out in a timely manner.
Anything you can do to expedite your review is much appreciated!
Comments are due in City View or email by: 12/4/14 Signature: JT Newberry