HomeMy WebLinkAboutSDP201800020 Other 2017-11-01CALIBER COLLISION PROaECT
(AVON ST EXT) etsk-%,�
PARCEL ID: 07700-00-00-011FO
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone 434 296-6832 Fax 434 972-4126
PUBLIC WATER / SEWER CONNECTION EVALUATION
THIS SECTION IS TO BE COMPLETED BY THE ALBEMARLE COUNTY SERVICE
AUTHORITY ENGINEERING DIVISION
t
1. Distance to public water connection. as
2. Access across adjoining progeny will / will not be required: US,0 nok- Liocalc� i„ UST ROW_
3. Distance to public sewer connection: -+5
4. Access across adjoining property will / will not be required: ' I1 "•t &
n -
SIGNATURE:
/41cxAn&r"5.- (Y"Qry,t ra n,K
is?s[' 4 Ctcck reluifdi
A.C.S.A. y tat7c. of 6no,n>a6
b99i 1t C4WM
THIS SECTION IS TO BE COMPLETED BY THE PROPERTY OWNER,
1. Provide contractor's written estimates. SEE ATTACHED.
2. Estimated cost to install a well and associated electrical and plumbing equipment: NA
3. Estimated cost to install a water line for public connection (do not include ACSA fees): NA
4. Estimated cost to install a septic system: $1 1,800.00
" ryOla"td \ atst•-VittAV Ck
cc PWWue& afo ,
5. Estimated cost to install a sewer line for public connection: NOT FEASIBLE • NEAREST SEWER LIM LOCATED
-DOWN A 100+ FT PROTECTED SLOPE, AM ON THE
OTAMR SIDE OF MOORS$ cpj=.
THIS SECTION IS TO BE COMPLETED BY THE AGENT
Connection to public wa;,r'/ will not be
Connection to public sewer will /will not be
Signatum:
b119me
Public Sanitary Sewer Improvements Cost Estimate
Caliber Collision, Albemarle County, VA
Sanitary Sewer ,
Quant' _ _ Unit Cost
Unit l Totals
sPV"m35 460 ELF` �._-----------------------�.__--------_-___------
---------M-_ _--_--_--
--_-_��' $37 00 $17,020
Clean outs ,--------- �..-.-----=------h----�..------------------------
----------_—__—_____--_--- ' i0 $750.00 i $7,500
Each
Manhole P.C. with cover j----------------f________-_µ_, _—_--
-__ $28_000-_,._-_-__--
Sewer force main (4° ---� - -- --------------
min diameters � 70 ILF _" _-------------
$40.00 '
Conn--�_—__ .__►�_----------� -------------------
00
ect to ex+sting manhole ; -'-�------=-------_�_—__
-- 1 Each _----- $4 500.00 l $4,500
Creek Crossin-------- 1----- ------------------
1�------------- ---
s - ,Lump sum ; 1.5 000.00 l----___�--
Pump station --- -----------------+-----=---------f----------__ $ 15,000 M
--------------
1 :Lump Sum l $50,000,00 1 _--
Stone Bedding ----- __________ 50,000
#r-850 Tons— t_------------------------------
$35.00 $29,750
Total Onsite Sanitary Sewer ,
"Premium due to steep slope installation condition $154,570