Loading...
HomeMy WebLinkAboutSP201800004 Correspondence Special Use Permit 2018-05-07Phone (434) 296-5832 �pF nr.y� rtt r rRctt�~p COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Memorandum To: Tobias Dengel (tobiasdengel@gmail.com) From: Rachel Falkenstein - Senior Planner Date: May 7, 2018 Subject: Mandatory Pre -Application Meeting (4/9/2018) TMP 76M1-15 The Peabody School Fax (434) 972-4126 The following are County staff comments regarding the above noted pre -application meeting. This meeting satisfies the requirement for a pre -application meeting prior to submittal of your Special Use Permit (SP) application. The purposes for a pre -application meeting provided below in italics, followed by staff's comments. (i) provide the applicant and the county a common understanding of the proposed project: • Applicant proposes to increase enrollment to 240 students and replace the existing 4,700 SF classroom wing with a new 7,195 SF classroom wing. • The property is zoned PUD Planned Unit Development and an amendment to the previous special use permit (SP) is needed for the proposed changes (SP201200030). (ii) consistency with the Comprehensive Plan: • The Southern and Western Neighborhoods Master Plan designates the property as Industrial; while schools are not typically encouraged in industrial areas, this is an existing school that has been through previous approvals on the property. Staff will be reviewing your application for consistency with the applicable principles of the Neighborhood Model. With the proposed changes to the design of the site, we would encourage you to create a design that is in keeping with the principles for pedestrian access, interconnectivity, and buildings and spaces of human scale. (iii) broadly identify the planning, zoning, and other issues raised by the application that need to be addressed by the applicant: • The applicant discussed the possibility of an additional access on Southern Parkway. If a new access is proposed here, consider the following: o The applicant should demonstrate a need for the connection with a traffic study o Since the previous ZMA shows a buffer along Southern Parkway, the applicant will need to apply for a Special Exception (variation) from the buffer requirement. o A limited access may be more appropriate here (exit -only, and/or right -turn only) o Signage should be provided as necessary The additional students requested in this special use permit amendment will require a new parking study to demonstrate sufficient parking. • The special use permit amendment will require a strong component of access management, addressing: o Site -wide circulation (traffic flow diagram, traffic management plan, etc) o No on -street parking on queuing for student drop-off or pick-up o Communication plans to disseminate new traffic pattern expectations to families of students (iv) applicable procedures: • Coordinate and conduct a Community Meeting with the 5th & Avon CAC (see attached community meeting guidelines). (v) identify the information the applicant must submit with the application, including the supplemental information: • An SP application, fee, and attached checklist. • The appropriate signature of the owner, the owner's agent, or a contract purchaser (see separate handout regarding authorized signatories). • Provide additional items (as listed in the SP checklist), including: o A concept plan showing the location of the existing and proposed features on site o A written description of the use o Traffic analysis, circulation plan, traffic management plan, as applicable o Parking study If you have any further questions, please contact me using the information provided below. Thank you, 0 WWD Rachel Falkenstein, AICP Senior Planner (434)-296-5832 x 3272 rfalkenstein@albemarle.org Attached: o Special Use Permit checklist o Community meeting guidelines