HomeMy WebLinkAboutSDP201800008 Approval - County Initial Site Plan 2018-05-24 1
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
April 26, 2018 (UPDATE: May 24, 2018)
Ms. Riki Van-Niekerk, Project Engineer, Roudabush, Gale & Associates, Inc.
172 S. Pantops Drive, Charlottesville, VA 22911
(434)-979-8121 x. 145 / RVan-Niekerk@Roudabush.com
Mr. Trey Steigman, Management Services Corporation
102 S. First Street, Suite 30, Charlottesville, VA 22902
(434)-977-4181 x. 105 / tsteigman@msc-rents.com
RE: SRC Action Letter – Conditional Approval of SDP-2018-00008
(Vistas at South Pantops – Initial Site Plan)
Dear Ms. Van-Niekerk and Mr. Steigman:
The Agent for the Board of Supervisors hereby grants administrative approval, with conditions, to the
above-referenced Initial Site Plan (dated 3/5/2018).
This approval shall be valid for a period of five (5) years from the date of this letter, provided that the
developer submits a Final Site Plan for all or a portion of the site within one (1) year after the date of this
letter as provided in section 32.4.3.1 of Chapter 18 of the Code of the County of Albemarle, and
thereafter diligently pursues approval of the Final Site Plan.
In accordance with Chapter 18 of the Code of the County of Albemarle, Section 32.4.2.8, Early or Mass
Grading may be permitted after the following approvals are received:
1. Engineering approval of a VSMP plan meeting the requirements of Chapter 17 of the Code of the
County of Albemarle.
2. Approval of all easements for facilities for stormwater management and drainage control.
3. Submittal of a tree conservation checklist with areas for tree preservation identified.
Please be advised that the Final Site Plan will not be considered to have been officially submitted until
the following items are received:
1. A Final Site Plan that satisfies all of the requirements of Section 32.6 of Chapter 18 of the Code.
2. A fee of $1,613.00 per Section 35.1.d(3) of Chapter 18 of the Code.
Please also be advised that, per the meeting conducted on Thursday, April 19 after the SRC meeting, and
per Mr. John Anderson’s updated review comments (see comment #21, dated 4/25/2018), the site plan
will not approvable using the proposed layout plan and proposed grading plan unless a refined
topographic survey demonstrates, to the satisfaction of the County Engineer, that the development will
2
not include the disturbance or development of Preserved Steep Slopes (and will not otherwise include the
disturbance or development of areas with a slope of 25% or greater). Engineering Division staff have
encouraged and strongly recommended that additional coordination on these matters occur prior to
submittal of a Final Site Plan. (UPDATE 5/24): Mr. John Anderson has indicated that the requested
refined topographic survey has been submitted, reviewed, and accepted by the County Engineer.
Additionally, please be advised that modifications to the layout plan might potentially require a re-review
of this proposal as an Initial Site Plan, depending on the extent and nature of any layout plan
modifications (or other modifications), as determined by the Planning Director or his designee.
Please submit a minimum of eight (8) copies of the Final Site Plan to the Community Development
Department (CDD). The assigned Review Coordinator will then distribute the plans to all reviewing
agencies. (Note: for ACSA, please coordinate directly with Mr. Alex Morrison or Mr. Richard Nelson to
determine how many copies ACSA requires in conjunction with their ongoing Water and Sewer
Construction Plan review.) CDD staff will then provide you with the first comment letter containing each
agency’s review comments for the Final Site Plan; after receiving that letter, please work directly with
each plan reviewer to address and resolve their respective agency’s requirements.
CDD shall not accept submittal of the Final Site Plan for final approval signatures until each of the
following agencies/reviewers indicate in writing that the Final Site Plans satisfy the attached conditions*
and all other applicable requirements, and have been given (tentative) approval:
SRC Members:
Albemarle County Planning Services (Planner) – 2 copies
[Tim Padalino: tpadalino@albemarle.org]
Albemarle County Engineering Services (Engineer) – 1 copy
[John Anderson: janderson2@albemarle.org]
Albemarle County Inspections Services (Inspections) – 1 copy
[Michael Dellinger: mdellinger@albemarle.org]
Albemarle County Department of Fire Rescue – 1 copy
[Shawn Maddox; smaddox@albemarle.org]
Albemarle County Service Authority (ACSA) – 1 copy (minimum); Note: please coordinate directly
with ACSA to determine exact number of copies being requested by ACSA.
[Richard Nelson; rnelson@serviceauthority.org]
Virginia Department of Transportation (VDOT) – 2 copies
[Adam Moore; Adam.Moore@vdot.virginia.gov]
If you have any questions about this administrative approval with conditions, or the Final Site Plan
submittal requirements, or any other aspect of your application(s), please feel free to contact me using the
information provided below.
Thank you; sincerely,
Tim Padalino, AICP
Senior Planner / tpadalino@albemarle.org / (434)-296-5832 x 3088
*Attached conditions of approval: SRC comment letter (dated 4/16/2018, updated 4/19, 4/26, and 5/24)
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
April 17, 2018 – (update: April 19, 2018) – (final update: April 26, 2018) – (UPDATE: May 24, 2018)
Ms. Riki Van-Niekerk, Project Engineer, Roudabush, Gale & Associates, Inc.
172 S. Pantops Drive, Charlottesville, VA 22911
(434)-979-8121 x. 145 / RVan-Niekerk@Roudabush.com
Mr. Trey Steigman, Management Services Corporation
102 S. First Street, Suite 30, Charlottesville, VA 22902
(434)-977-4181 x. 105 / tsteigman@msc-rents.com
RE: Site Review Committee Comment Letter for SDP-2018-00008 (Vistas at South Pantops – Initial Site Plan)
(Updated May 24, 2018)
Dear Ms. Van-Niekerk and Mr. Steigman:
The Planner for the Planning Division of the Albemarle County Community Development Department (CDD) and
other members of the Site Review Committee (SRC) have reviewed the development proposal referenced above.
Initial review comments from the following SRC members are attached:
Albemarle County Planning Services (Planner) – (updated 5/24 – attached; see comments 16 and 18)
Albemarle County Engineering Services (Engineer) – PENDING (updated 4/19, 4/26, and 5/24 – attached)
Albemarle County Information Services (E911) – (attached)
Albemarle County Building Inspections – (attached)
Albemarle County Department of Fire Rescue – (attached)
Albemarle County Service Authority (ACSA) – PENDING (updated 4/18 – attached)
Virginia Department of Transportation (VDOT) – PENDING (updated 4/18 and 4/26 – attached)
Each comment is preceded by the applicable reference to Chapter 18 of the Albemarle County Code (Zoning
Ordinance), unless otherwise specified. (The following comments are those that have been identified at this time;
additional comments may be added or eliminated based on further review.)
The Planner will either approve with conditions or deny the Initial Site Plan within 15 days of the SRC meeting.
UPDATE 5/24: Please reference the attached SRC Action Letter – Conditional Approval dated April 26, 2018 and
updated May 24, 2018.
Please contact me at your convenience if you have questions or require additional information or assistance.
Sincerely,
Tim Padalino, AICP
Senior Planner / tpadalino@albemarle.org / (434)-296-5832 x 3088
Albemarle County Planning Services (Planner) – Tim Padalino, tpadalino@albemarle.org – Requested Changes:
1. [Z.O. Section 32.5.2(a)]: On Sheet ISP2, the Site Tabulations chart is partially illegible (not visible). Please
ensure the chart is properly displayed and fits entirely on the sheet, without any content being omitted.
2. [Z.O. Section 32.5.2(r)]: On Sheet ISP2, the right half of the Legend does not contain any labels for the various
symbols. Please revise to ensure all symbols in the Legend are properly labeled.
3. [Z.O. Section 32.5.2(a)]: On Sheet ISP2, please revise the Zoning Information on the Site Tabulations chart as
follows: add the word “Steep” so that it states “Managed and Preserved Steep Slopes Overlay District” and add
“Flood Hazard Overlay District.”
4. [Z.O. Section 32.5.2(a)]: On Sheet ISP3, the north arrow appears to be shown incorrectly. Please check and
revise as necessary. The north arrow appears to be shown correctly on the other sheets.
5. [Z.O. Section 32.5.2(b)]: On Sheet ISP2, the Site Tabulations chart identifies the Tax Map/Parcel as being
13.31 acres, but the Land Cover Schedule states that the total area is 13.76 acres. Please address and resolve this
discrepancy, and please recalculate affected calculations (as may be necessary).
6. [Z.O. Section 32.5.2(d)]: The Grading Plan on Sheet ISP5 shows a “proposed construction easement +/- 3,200
sf” on the adjoining property to the south (Overlook Condominiums). Please provide additional explanation,
documentation, or other information about these proposed off-site construction activities, such as an easement
or a letter of intent to grant the proposed easement.
7. [Z.O. Section 32.5.2(n)]: Please show the proposed location(s) of outdoor trash containers.
8. [Z.O. Section 32.5.2(n)]: Please show the proposed location(s) of outdoor lighting.
9. [Z.O. Section 32.5.2(n)]: Please provide the proposed paving materials or other surface materials for all walks,
parking lots, and driveways.
10. [Z.O. Section 32.5.2(n)]: On Sheet ISP2, the Parking Requirements information on the Site Tabulations chart
states that there are 12 ADA spaces (9 van accessible), but Sheets ISP4 and ISP5 appear to show only 10 ADA
spaces (with only 8 van accessible). Please revise the Site Tabulations chart as necessary.
11. [Z.O. Section 32.5.2(n)]: Please add graphic depictions and/or notes to Sheet ISP4 that clearly identify the
location and size of the proposed clubhouse and proposed pool deck/swimming pool.
12. [Z.O. Section 32.5.2(b)]: On Sheet ISP2, the Recreation Regulation information on the Site Tabulations chart
identifies the Provided Area as including “473,497 SQFT of onsite nature trails and wooded areas.” Please
identify the location/extent of the area that was used to calculate this approximately 11-acre proposed recreation
amenity.
13. [Z.O. Section 32.5.2(i)]: Please revise Sheets ISP2, ISP4, and ISP6 (as may be necessary) to provide
information about any access easements which may potentially be granted in conjunction with the proposed “5’
nature trails” that are proposed as publicly-accessible recreational connections from South Pantops Drive
through the subject property to the Old Mills Trail in the Albemarle County Greenway Corridor along the
Rivanna River.
14. [Z.O. Sections 32.5.2(n) and 4.16]: The proposed substitution of “provided recreation facilities” (“trails in
wooded area and connection to county trails system-greenway”) for minimum required facilities is partially
acceptable, and partially unacceptable. Please revise as follows:
A. It is acceptable to utilize the proposed “trails in wooded area and connection to county trails system-
greenway” as a substitution for some of the minimum facilities required by 4.16.2; however, it is not
acceptable to completely substitute those minimum facilities. Specifically, one (1) tot lot that
complies with 4.16.2.1 and 4.16.1 must be provided.
B. Please modify the trail locations and alignments in collaboration with Mr. Dan Mahon in the
Albemarle County Parks and Recreation Department (ACPR).
C. Please consider opportunities to partially relocate/realign the southern trail into areas which will
already be subject to land disturbance, so as to minimize disturbance within steep slopes, where
possible.
D. Add a note to the Initial Site Plan that states the following: “Per County Code 18-4.16.3.2,
recreational equipment and facilities shall be maintained in a safe condition and replaced as
necessary. Maintenance shall be the responsibility of the property owner if rental units or a
homeowners' association if sale units.”
E. Add a note to the Initial Site Plan that states the following: “Per County Code 18-4.16.3.3,
recreational facilities shall be completed when fifty (50) percent of the units have received
certificates of occupancy.”
15. [Z.O. Section 32.5.2(o)]: The “proposed right-of-way dedication area” along South Pantops Drive must include
the statement “dedicated to public use.” Please revise accordingly and please clarify the purpose or intent of the
proposed dedication. Please note that this proposed dedication of land requires the preparation and submission
of a separate subdivision plat satisfying the requirements of chapter 14, and will likely need to be accompanied
by a deed of dedication in a form and having the substance approved by the county attorney.
16. [Z.O. Section 32.5.2(q)]: The traffic generation figures provided in the ADT section of the Site Tabulations
chart on ISP2 specify a Total ADT based on 144 units. This proposal contains 148 units. Please revise these
calculations accordingly.
UPDATE (5/24): Comment not applicable.
17. [Z.O. Section 32.5.2(s)]: As noted above, this proposed development (as shown on the Initial Site Plan) will
require the preparation and submission of an off-site construction easement plat, as well as a subdivision plat
with corresponding deed of dedication. The proposed “5’ nature trails” which are intended to provide a public
recreational connection to the Old Mills Trail in the Albemarle County Greenway Corridor along the Rivanna
River, may also require an easement plat (TBD, based on additional coordination with ACPR).
18. (UPDATE 5/24): [Z.O. Sections 32.5.2(b), 32.5.2(n), 18.8, and 4.19]: All structures are subject to
stepback requirements contained in Z.O. 4.19, as follows:
“For each story that begins above 40 feet in height or for each story above the third story,
whichever is less, the minimum stepback shall be 15 feet. The minimum 15 foot stepback applies
to all buildings on the property and may be reduced by special exception.”
Sheets ISP1, ISP4, and ISP5 appear to show structures four stories above grade (not including
underground parking); as such, the stepbacks should apply to these structures. Although the “Stepback”
note in the “Site Tabulations” table on Sheet ISP2 of Initial Site Plan SDP201800008 correctly lists the
stepback requirements, the conceptual architectural rendering on Sheet ISP1 appears to show a four-story
structure with no stepbacks.
Please ensure the final site plan addresses and resolves this apparent discrepancy, and please ensure all
applicable stepback requirements are applied to all structures.
Albemarle County Engineering Services (Engineer)
John Anderson, janderson2@albemarle.org – PENDING; review comments will be forwarded upon receipt.
Update 4/19: Requested Changes (4/18, 4/19); see attached comments
Update 4/26: Requested Changes (4/25); see attached comments (#21)
Update 5/24: Mr. John Anderson has indicated that the requested refined
topographic survey has been submitted, reviewed, and accepted by the
County Engineer.
Albemarle County Information Services (E911)
Elise Kiewra, ekiewra@albemarle.org – Requested Changes (3/23/18); see attached comments.
Albemarle County Building Inspections
Michael Dellinger, mdellinger@albemarle.org – See Recommendations (3/20/18); see attached comments.
Albemarle County Department of Fire Rescue
Shawn Maddox, smaddox@albemarle.org – Requested Changes (3/29/18); see attached comments.
Albemarle County Service Authority
Richard Nelson, rnelson@serviceauthority.org – PENDING; review comments will be forwarded upon receipt.
Update 4/18: See Recommendations (4/18/18); see attached comments.
Virginia Department of Transportation
Adam Moore, Adam.Moore@vdot.virginia.gov – PENDING; review comments will be forwarded upon receipt.
Update 4/18: Requested Changes (4/18/18); see attached comments.
Update 4/26: Requested Changes (4/26); see attached comments.
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
Project: Vistas at South Pantops –Initial Site Plan
Plan preparer: Trey Steigman, Dominion Engineering, 172 S. Pantops Drive, Suite A
Charlottesville, VA 22911 [tsteigman@msc-rents.com ;
operations@dominioneng.com ]
Jim Taggart –Roudabush, Gale & Assoc, Inc [jtaggart@roudabush.com ]
914 Monticello Road, Charlottesville, VA 22902
Owner or rep.: South Pantops II Land Trust, Charles W Hurt and Shirley L. Fisher, Trustees
P. O. Box 8147, Charlottesville, VA 22906
Plan received date: 7 Mar 2018
Date of comments: 18 Apr 2018
Reviewer: John Anderson
Project Coordinator: Tim Padalino
SDP2018-0008
1. Coordination may be required with state agency concerning Federal Dam Break Inundation Zone.
2. Preserved Slopes remain ineligible for development unless more accurate or more technical data
demonstrate to the satisfaction of the County Engineer that the slopes are less than twenty-five (25) percent.
Avoid favorable averaging across contours that indicates slopes less than 25%, when, for example, using
horizontal distance between adjacent 2-ft interval contours in Area C, ISP10, slopes as steep as 33% appear
to exist in area ISP proposes for development. Recommend Engineering plan review meeting to discuss.
3. Consider practicality of constructing 26-ft high wall within 1 ft. of preserved steep slopes (ISP4).
ISP4:
4. Confirm all parking lot parking space and island curb radii ≥ 3’.
5. Provide fire-truck design vehicle to show graphically that internal site design allows adequate turnaround.
Fire response vehicle/s that enter the site must be able to exit without backing into South Pantops Drive.
ISP5:
6. Revise 16’ retaining wall design per Albemarle County Code, 18-30.7.5 (since built upon steep slopes).
7. Provide complete drainage computations; plan and profile of proposed storm system elements (inlets
/pipes). Use VDOT storm conveyance tabular reporting format.
8. Ensure exit velocity at storm system structure 1 (outfall for entire development) is a non-erosive velocity.
9. Ensure adequate riprap apron outfall protection at storm system structure 1.
10. Provide riprap apron design for outfall protection at storm system structure 1.
11. Include off-site pass-through storm runoff volumes that transit the site in all routings. (ISP7)
12. Provide velocity and volume storm runoff computations. Provide routings to support stormwater narrative,
especially to support statements concerning pass-through peak flows, and site-generated peak flows (ISP7).
13. Provide storm routings that pass through Ex. 54” pipe beneath South Pantops Drive.
14. 2:1 slopes are generally an exception. Provide 3:1 or flatter slopes wherever possible.
15. ISP6: Proposed sanitary MH Str. 2A height appears to require safety slab. Show safety slab.
16. ACSA must approve sanitary sewer design (slope, length, pipe material, MHs, etc).
Engineering Review Comments
Page 2 of 2
17. ISP7: Preliminary review of preliminary SWM computations and narrative indicates concept depends upon
9.44 Ac. land cover in forest/open space, once site is developed. Reliance upon forest/open space in
VaRRM .xls requires open space permanent easement recordation prior to VSMP plan approval.
18. Final Site Plan requires VSMP Application review and approval.
19. ISP9: VDOT approval of turn lane warrant analysis is required.
20. Please be advised that Final Site Plan approval of design that includes retaining walls of varying height,
including walls integral to parking and a 4-story residential apartment building, will require (retaining wall)
structural plans sealed by a licensed professional engineer with structural or geotechnical expertise.
Please call if any questions: 434.296-5832 –x3069
Thank you
SDP201800008_Vistas_S_Pantops_ISP_041818.doc
April 12, 2018
Tim Padalino, Senior Planner
Albemarle County Community Development
401 McIntire Road
Charlottesville, VA 22902
RE: The Vistas at South Pantops
Initial Site Development Plan
SDP2018-08
Mr. Padalino:
As requested by your department, I have reviewed the subject plan, dated 3/5/18, for The
Vistas at South Pantops, for compliance with VDH regulations. It appears that all
proposed construction is to connect to public water and sewer systems and therefore I
have no comments or concerns.
Recommendation: Approval
Conditions: None
If there are any questions or you wish to discuss, please give me a call, 434-972-4306.
Sincerely,
Alan Mazurowski
Environmental Health Supervisor
Thomas Jefferson Health District
alan.mazurowski@vdh.virginia.gov
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
April 26, 2018
Ms. Riki Van-Niekerk, Project Engineer, Roudabush, Gale & Associates, Inc.
172 S. Pantops Drive, Charlottesville, VA 22911
(434)-979-8121 x. 145 / RVan-Niekerk@Roudabush.com
Mr. Trey Steigman, Management Services Corporation
102 S. First Street, Suite 30, Charlottesville, VA 22902
(434)-977-4181 x. 105 / tsteigmangmsc-rents.com
RE: SRC Action Letter — Conditional Approval of SDP-2018-00008
(Vistas at South Pantops — Initial Site Plan)
Dear Ms. Van-Niekerk and Mr. Steigman:
The Agent for the Board of Supervisors hereby grants administrative approval, with conditions, to the
above -referenced Initial Site Plan (dated 3/5/2018).
This approval shall be valid for a period of five (5) years from the date of this letter, provided that the
developer submits a Final Site Plan for all or a portion of the site within one (1) year after the date of this
letter as provided in section 32.4.3.1 of Chapter 18 of the Code of the County of Albemarle, and
thereafter diligently pursues approval of the Final Site Plan.
In accordance with Chapter 18 of the Code of the County of Albemarle, Section 32.4.2.8, Early or Mass
Grading may be permitted after the following approvals are received:
1. Engineering approval of a VSMP plan meeting the requirements of Chapter 17 of the Code of the
County of Albemarle.
2. Approval of all easements for facilities for stormwater management and drainage control.
3. Submittal of a tree conservation checklist with areas for tree preservation identified.
Please be advised that the Final Site Plan will not be considered to have been officially submitted until
the following items are received:
1. A Final Site Plan that satisfies all of the requirements of Section 32.6 of Chapter 18 of the Code.
2. A fee of$1,613.00 per Section 35.1.d(3) of Chapter 18 of the Code.
Please also be advised that, per the meeting conducted on Thursday, April 19 after the SRC meeting, and
per Mr. John Anderson's updated review comments (see comment #21, dated 4/25/2018), the site plan
will not approvable using the proposed layout plan and proposed grading plan unless a refined
topographic survey demonstrates, to the satisfaction of the County Engineer, that the development will
not include the disturbance or development of Preserved Steep Slopes (and will not otherwise include the
disturbance or development of areas with a slope of 25% or greater). Engineering Division staff have
encouraged and strongly recommended that additional coordination on these matters occur prior to
submittal of a Final Site Plan.
Additionally, please be advised that modifications to the layout plan might potentially require a re -review
of this proposal as an Initial Site Plan, depending on the extent and nature of any layout plan
modifications (or other modifications), as determined by the Planning Director or his designee.
Please submit a minimum of eight (8) copies of the Final Site Plan to the Community Development
Department (CDD). The assigned Review Coordinator will then distribute the plans to all reviewing
agencies. (Note: for ACSA, please coordinate directly with Mr. Alex Morrison or Mr. Richard Nelson to
determine how many copies ACSA requires in conjunction with their ongoing Water and Sewer
Construction Plan review.) CDD staff will then provide you with the first comment letter containing each
agency's review comments for the Final Site Plan; after receiving that letter, please work directly with
each plan reviewer to address and resolve their respective agency's requirements.
The Community Development Department shall not accept submittal of the Final Site Plan for final
approval signatures until each of the following agencies/reviewers indicate in writing that the Final Site
Plans satisfy the attached conditions* and all other applicable requirements, and have been given
(tentative) approval:
SRC Members:
■ Albemarle County Planning Services (Planner) — 2 copies
[Tim Padalino: tpadalinogalbemarle.org]
■ Albemarle County Engineering Services (Engineer) — 1 copy
[John Anderson: janderson2galbemarle.or2]
■ Albemarle County Inspections Services (Inspections) — 1 copy
[Michael Dellinger: mdellinger@albemarle.org]
■ Albemarle County Department of Fire Rescue — 1 copy
[Shawn Maddox; smaddox@albemarle.org]
■ Albemarle County Service Authority (ACSA) — 1 copy (minimum); Note: please coordinate directly
with ACSA to determine exact number of copies being requested by ACSA.
[Richard Nelson; rnelson@serviceauthority.org]
■ Virginia Department of Transportation (VDOT) — 2 copies
[Adam Moore; Adam. Moore@vdot.virginia.gov]
If you have any questions about this administrative approval with conditions, or the Final Site Plan
submittal requirements, or any other aspect of your application(s), please feel free to contact me using the
information provided below.
Thank you; sincerely, pa,.�
Tim Padali , AICP
Senior Planner / tpadalino o albemarle.org / (434)-296-5832 x 3088
*Attached conditions of approval: SRC comment letter (dated 4/16/2018, updated 4/19 and 4/26)
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (4341972-4126
April 17, 2018 — (update: April 19, 2018) — (final update: April 26, 2018)
Ms. Riki Van-Niekerk, Project Engineer, Roudabush, Gale & Associates, Inc.
172 S. Pantops Drive, Charlottesville, VA 22911
(434)-979-8121 x. 145 / RVan-Niekerk@Roudabush.com
Mr. Trey Steigman, Management Services Corporation
102 S. First Street, Suite 30, Charlottesville, VA 22902
(434)-977-4181 x. 105 / tsteigman@msc-rents.com
RE: Site Review Committee Comment Letter for SDP-2018-00008 (Vistas at South Pantops — Initial Site Plan)
(Updated April 26, 2018)
Dear Ms. Van-Niekerk and Mr. Steigman:
The Planner for the Planning Division of the Albemarle County Community Development Department (CDD) and
other members of the Site Review Committee (SRC) have reviewed the development proposal referenced above.
Initial review comments from the following SRC members are attached:
Albemarle County Planning Services (Planner)
Albemarle County Engineering Services (Engineer) — PENDING (updates 4/19 and 4/26 — attached)
Albemarle County Information Services (E911) — (attached)
Albemarle County Building Inspections — (attached)
Albemarle County Department of Fire Rescue — (attached)
Albemarle County Service Authority (ACSA) — PENDING (update 4/18 — attached)
Virginia Department of Transportation (VDOT) — PENDING (updates 4/18 and 4/26 — attached)
Each comment is preceded by the applicable reference to Chapter 18 of the Albemarle County Code (Zoning
Ordinance), unless otherwise specified. (The following comments are those that have been identified at this time;
additional comments may be added or eliminated based on further review.)
The Planner will either approve with conditions or deny the Initial Site Plan within 15 days of the SRC meeting.
Please contact me at your convenience if you have questions or require additional information or assistance.
Sincerely,
Tim Pad no, AICP
Senior Planner / ttadalino@albemarle.org / (434)-296-5832 x 3088
Albemarle County Planning Services (Planner) —Tim Padalino, tadalino e,albemarle.org —Requested Changes:
1. [Z.O. Section 32.5.2(a)]: On Sheet ISP2, the Site Tabulations chart is partially illegible (not visible). Please
ensure the chart is properly displayed and fits entirely on the sheet, without any content being omitted.
2. [Z.O. Section 32.5.2(r)]: On Sheet ISP2, the right half of the Legend does not contain any labels for the various
symbols. Please revise to ensure all symbols in the Legend are properly labeled.
3. [Z.O. Section 32.5.2(a)]: On Sheet ISP2, please revise the Zoning Information on the Site Tabulations chart as
follows: add the word "Steep" so that it states "Managed and Preserved Steep Slopes Overlay District" and add
"Flood Hazard Overlay District."
4. [Z.O. Section 32.5.2(a)]: On Sheet ISP3, the north arrow appears to be shown incorrectly. Please check and
revise as necessary. The north arrow appears to be shown correctly on the other sheets.
5. [Z.O. Section 32.5.2(b)]: On Sheet ISP2, the Site Tabulations chart identifies the Tax Map/Parcel as being
13.31 acres, but the Land Cover Schedule states that the total area is 13.76 acres. Please address and resolve this
discrepancy, and please recalculate affected calculations (as may be necessary).
6. [Z.O. Section 32.5.2(d)]: The Grading Plan on Sheet ISP5 shows a "proposed construction easement +/- 3,200
sf'on the adjoining property to the south (Overlook Condominiums). Please provide additional explanation,
documentation, or other information about these proposed off -site construction activities, such as an easement
or a letter of intent to grant the proposed easement.
7. [Z.O. Section 32.5.2(n)]: Please show the proposed location(s) of outdoor trash containers.
8. [Z.O. Section 32.5.2(n)]: Please show the proposed location(s) of outdoor lighting.
9. [Z.O. Section 32.5.2(n)]: Please provide the proposed paving materials or other surface materials for all walks,
parking lots, and driveways.
10. [Z.O. Section 32.5.2(n)]: On Sheet ISP2, the Parking Requirements information on the Site Tabulations chart
states that there are 12 ADA spaces (9 van accessible), but Sheets ISP4 and ISP5 appear to show only 10 ADA
spaces (with only 8 van accessible). Please revise the Site Tabulations chart as necessary.
11. [Z.O. Section 32.5.2(n)]: Please add graphic depictions and/or notes to Sheet ISP4 that clearly identify the
location and size of the proposed clubhouse and proposed pool deck/swimming pool.
12. [Z.O. Section 32.5.2(b)]: On Sheet ISP2, the Recreation Regulation information on the Site Tabulations chart
identifies the Provided Area as including "473,497 SQFT of onsite nature trails and wooded areas." Please
identify the location/extent of the area that was used to calculate this approximately 11-acre proposed recreation
amenity.
13. [Z.O. Section 32.5.2(i)]: Please revise Sheets ISP2, ISP4, and ISP6 (as may be necessary) to provide
information about any access easements which may potentially be granted in conjunction with the proposed "5'
nature trails" that are proposed as publicly -accessible recreational connections from South Pantops Drive
through the subject property to the Old Mills Trail in the Albemarle County Greenway Corridor along the
Rivanna River.
14. [Z.O. Sections 32.5.2(n) and 4.161: The proposed substitution of "provided recreation facilities" ("trails in
wooded area and connection to county trails system-greenway") for minimum required facilities is partially
acceptable, and partially unacceptable. Please revise as follows:
A. It is acceptable to utilize the proposed "trails in wooded area and connection to county trails system-
greenway" as a substitution for some of the minimum facilities required by 4.16.2; however, it is not
acceptable to completely substitute those minimum facilities. Specifically, one (1) tot lot that
complies with 4.16.2.1 and 4.16.1 must be provided.
B. Please modify the trail locations and alignments in collaboration with Mr. Dan Mahon in the
Albemarle County Parks and Recreation Department (ACPR).
C. Please consider opportunities to partially relocate/realign the southern trail into areas which will
already be subject to land disturbance, so as to minimize disturbance within steep slopes, where
possible.
D. Add a note to the Initial Site Plan that states the following: "Per County Code 18-4.16.3.2,
recreational equipment and facilities shall be maintained in a safe condition and replaced as
necessary. Maintenance shall be the responsibility of the property owner if rental units or a
homeowners' association if sale units."
E. Add a note to the Initial Site Plan that states the following: "Per County Code 18-4.16.3.3,
recreational facilities shall be completed when fifty (50) percent of the units have received
certificates of occupancy."
15. [Z.O. Section 32.5.2(o)]: The "proposed right-of-way dedication area" along South Pantops Drive must include
the statement "dedicated to public use." Please revise accordingly and please clarify the purpose or intent of the
proposed dedication. Please note that this proposed dedication of land requires the preparation and submission
of a separate subdivision plat satisfying the requirements of chapter 14, and will likely need to be accompanied
by a deed of dedication in a form and having the substance approved by the county attorney.
16. [Z.O. Section 32.5.2(q)]: The traffic generation figures provided in the ADT section of the Site Tabulations
chart on ISP2 specify a Total ADT based on 144 units. This proposal contains 148 units. Please revise these
calculations accordingly.
17. [Z.O. Section 32.5.2(s)]: As noted above, this proposed development (as shown on the Initial Site Plan) will
require the preparation and submission of an off -site construction easement plat, as well as a subdivision plat
with corresponding deed of dedication. The proposed "5' nature trails" which are intended to provide a public
recreational connection to the Old Mills Trail in the Albemarle County Greenway Corridor along the Rivanna
River, may also require an easement plat (TBD, based on additional coordination with ACPR).
Albemarle County Engineering Services (Engineer)
John Anderson, janderson2@albemarle.org — PENDING; review comments will be forwarded upon receipt.
Update 4/19: Requested Changes (4/18, 4/19); see attached comments
Update 4/26: Requested Changes (4/25); see attached comments (#21)
Albemarle County Information Services (E911)
Elise Kiewra, ekiewragalbemarle.org — Requested Changes (3/23/18); see attached comments.
Albemarle County Building Inspections
Michael Dellinger, mdellinger@albemarle.org — See Recommendations (3/20/18); see attached comments.
Albemarle County Department of Fire Rescue
Shawn Maddox, smaddox@albemarle.org — Requested Changes (3/29/18); see attached comments.
Albemarle County Service Authority
Richard Nelson, rnelson@serviceauthordy.org — PENDING; review comments will be forwarded upon receipt.
Update 4/18: See Recommendations (4/18/18); see attached comments.
Virginia Department of Transportation
Adam Moore, Adam. Moorekvdot.vir i_ �ng ia.gov — PENDING; review comments will be forwarded upon receipt.
Update 4/18: Requested Changes (4/18/18); see attached comments.
Update 4/26: Requested Changes (4/26); see attached comments.
Review Comments for SDP201800008 11nitial Site Plan
Project Name: Vistas at South Pantops - Initial
Date Completed: Wednesday, April 18, 2018 Department1DivisionfAgency: Review Sys:
rJohn Anderson CDD� En ineerin Requested Changes El
Reviewer: _ g 9
1- Coordination may be required with state agency concerning Federal Dam Break Inundation Zone -
Preserved Slopes remain ineligible for development unless more accurate or more technical data demonstrate to the
satisfaction of the County Engineer that the slopes are less than twenty -free (25) percent- Avoid favorable averaging across
contours that indicates slopes less than 26%, when, for example, using horizontal distance between adjacent 2-ft interval
contours in Area C, I P 10, slopes as steep as 33% appear to exist in area I P proposes for development- Recommend
Engineering plan review meeting to discuss-
3- Consider practicality of constructing 26-ft high wall within 1 ft- of preserved steep slopes (I P4)-
IP4:
4- Confirm all parking lot parking space and island curb radii = 3'-
5- Provide fire -truck design vehicle to show graphically that internal site design allows adequate turnaround- Fire
response vehiclels that enter the site must be able to exit without backing into South Pantops Drive-
IP5:
6- Revise 16' retaining wall design per Albemarle County Code, 18-30-7-5 (since built upon steep slopes)-
7- Provide complete drainage computations-, plan and profile of proposed storm system elements (inlets /pipes)- Use
VDOT storm conveyance tabular reporting format-
8- Ensure exit velocity at storm system structure 1 (outfall for entire development) is a non -erosive velocity-
9- Ensure adequate riprap apron outfall protection at storm system structure 1-
10- Provide riprap apron design for outfall protection at storm system structure 1-
11- Include off -site pass -through storm runoff volumes that transit the site in all routings- (IP7)
12- Provide velocity and volume storm runoff computations- Provide routings to support stormwater narrative especially to
support statements concerning pass -through peak flows, and site -generated peak flows (IP7)-
13- Provide storm routings that pass through Ex- 54" pipe beneath South Pantops Drive-
14- 2:1 slopes are generally an exception- Provide 3:1 or flatter slopes wherever possible-
15- IP6: Proposed sanitary MH Str_ 2A height appears to require safety slab- Show safety slab-
16- ACSA must approve sanitary sewer design (slope, length, pipe material, MHs, etc)-
17- I PT Preliminary review of preliminary SWIVI computations and narrative indicates concept depends upon 9-44 Ac-
land cover in forest/open space, once site is developed- Reliance upon forest/open space in VaRRM -xls requires open space
permanent easement recordation prior to VMP plan approval-
18- Final Site Plan requires VMP Application review and approval-
19- IP9: VDOT approval of turn lane warrant analysis is required-
20- Please be advised that Final Site Plan approval of design that includes retaining walls of varying height inclriding 'Malls
integral to parking and a 4-story residential apartment building, will require (retaining wall) structural plans sealed by a licensed
professional engineer with structural or geotechnical expertise -
Page: County of Albemarle Printed On: 10411912018
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
Project:
Plan preparer:
Owner or rep.
Plan received date:
Date of comments:
Reviewer:
Project Coordinator:
SDP2018-0008
Vistas at South Pantops —Initial Site Plan
Trey Steigman, Dominion Engineering, 172 S. Pantops Drive, Suite A
Charlottesville, VA 22911 [tsteigmangmsc-rents.com ;
operationsndominioneng com ]
Jim Taggart —Roudabush, Gale & Assoc, Inc [itaaizart@roudabush.com ]
914 Monticello Road, Charlottesville, VA 22902
South Pantops II Land Trust, Charles W Hurt and Shirley L. Fisher, Trustees
P. O. Box 8147, Charlottesville, VA 22906
7 Mar 2018
18 Apr 2018
John Anderson
Tim Padalino
Coordination may be required with state agency concerning Federal Dam Break Inundation Zone.
2. Preserved Slopes remain ineligible for development unless more accurate or more technical data
demonstrate to the satisfaction of the County Engineer that the slopes are less than twenty-five (25) percent.
Avoid favorable averaging across contours that indicates slopes less than 25%, when, for example, using
horizontal distance between adjacent 2-ft interval contours in Area C, ISP10, slopes as steep as 33% appear
to exist in area ISP proposes for development. Recommend Engineering plan review meeting to discuss.
3. Consider practicality of constructing 26-ft high wall within 1 ft. of preserved steep slopes (ISP4).
ISP4:
4. Confirm all parking lot parking space and island curb radii > 3'.
5. Provide fire -truck design vehicle to show graphically that internal site design allows adequate turnaround.
Fire response vehicle/s that enter the site must be able to exit without backing into South Pantops Drive.
ISP5:
6. Revise 16' retaining wall design per Albemarle County Code, 18-30.7.5 (since built upon steep slopes).
7. Provide complete drainage computations; plan and profile of proposed storm system elements (inlets
/pipes). Use VDOT storm conveyance tabular reporting format.
8. Ensure exit velocity at storm system structure 1 (outfall for entire development) is a non -erosive velocity.
9. Ensure adequate riprap apron outfall protection at storm system structure 1.
10. Provide riprap apron design for outfall protection at storm system structure 1.
11. Include off -site pass -through storm runoff volumes that transit the site in all routings. (ISP7)
12. Provide velocity and volume storm runoff computations. Provide routings to support stormwater narrative,
especially to support statements concerning pass -through peak flows, and site -generated peak flows (ISP7).
13. Provide storm routings that pass through Ex. 54" pipe beneath South Pantops Drive.
14. 2:1 slopes are generally an exception. Provide 3:1 or flatter slopes wherever possible.
15. ISP6: Proposed sanitary MH Str. 2A height appears to require safety slab. Show safety slab.
16. ACSA must approve sanitary sewer design (slope, length, pipe material, MHs, etc).
Engineering Review Comments
Page 2 of 2
17. ISP7: Preliminary review of preliminary SWM computations and narrative indicates concept depends upon
9.44 Ac. land cover in forest/open space, once site is developed. Reliance upon forest/open space in
VaRRM .xls requires open space permanent easement recordation prior to VSMP plan approval.
18. Final Site Plan requires VSMP Application review and approval.
19. ISP9: VDOT approval of turn lane warrant analysis is required.
20. Please be advised that Final Site Plan approval of design that includes retaining walls of varying height,
including walls integral to parking and a 4-story residential apartment building, will require (retaining wall)
structural plans sealed by a licensed professional engineer with structural or geotechnical expertise.
Please call if any questions: 434.296-5832 —x3069
Thank you
SDP201800008_V istas_S_Pantops_ISP_041818. doc
Review Comments for SDP201800008 11nitial Site Plan
Project Name: Vistas at South Pantops - Initial
Date Completed: Wednesday, April 25, 2018 Department1DivisianfAgency: Review sus:
Reviewer: rJohn Anderson CDD� Engineering _ Requested Changes
Review comment # 1: As follow-up to Engineering Plan Review meeting with Applicant on 4119118 (4.15 PM), please provide
refined field survey data on maximum 20' spacing between survey elevation data points for areas on Initial Site Plan that are
located within Albemarle County GIS steep slopes overlay district that the Applicant proposes to develop- Applicant proposes
more accurate topographic survey data will position Engineering to accept specific areas as eligible for development, if slopes
are shown to be less than 25%- Coordination with Engineering Division prior to Final Site Plan submittal is encouraged 1
strongly recommended- Should Applicant submit a Final Site Plan prior to submitting refined field survey data, and prior to
receiving clarification from Engineering of the development potential of areas proposed to be graded or developed with the Initial
Site Plan, the Applicant runs risk of Final Site Plan disapproval- It is Engineering Division understanding that Planning Division
will condition Initial Site Plan approval upon Applicant submitting information discussed during the 4/19/18 SRC follow-up
meeting with Applicant as vital to evaluation of development potential of areas within GIS steep slopes overlay district- Please
see related comments at Items 2, 3, 6, Engineering Division review comments dated 18 Apr 2018-
Page: County of Albemarle Printed On: 10412612018
APPLICATION#
TMP:
County of Albemarle
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902
PLAN REVIEW COMMENTS - E911
SDP201800008
07800-00-00-02000
DATE: 3/23/2018
FROM: Elise Kiewra
ekiewra@albemarle.org
Geographic Data Services (GDS)
www.albemarle.org/ads
(434) 296-5832 ext. 3030
The following roads will need a name:
Please propose one road name for the main access.
This site will require a one (1) new private road name. Per Sec. 7-200-B of the County's Road
Naming and Property Numbering Ordinance (Page 2 of PDF).
"It is intended by this article that all roads within the county which serve or are designed
to serve three (3) or more dwelling units or business structures shall be named."
Please review the procedures in the Road Naming and Property Numbering Manual to decide upon
a road name.
We recommend providing three (3) candidate names for each road to our office for
review, in case your first choices are not acceptable.
A PDF version of the Ordinance and Manual can be found here:
httns://www.albemarle.ora/unload/imaaes/Forms Center/Departments/Geographic Data Service
s/Forms/Road Namina and Property Numberina Ordinance and Manual.pdf
Please consult the County's Road Name Index to check your road names prior to submittal. The
Index can be found here: http://www.albemarle.org/albemarle/upload/images/webapps/roads/
Parcel and mapping information can be found here: http://gisweb.albemarle.org/
If you should have any questions, please do not hesitate to contact our office
Review Comments for SDP201800008 11nitial Site Plan
Project Name: Vistas at South Pantops - Initial
Date Completed: Tuesday, March 20, 2019 Department1DivisionfAgency: Review Status:
Reviewer: Dellinger
rMichael Dellin Inspections See Recommendations
❑ DDD
No building plans submitted so we hav no idea how many proposed units meet the Type A and B_ In addition to the chart used }
to determine accessible parking please verify compliance with the following:
110 6 -2 Groups R-2 and R-3-
At least 2 percent, but not less than one, of each type of parking space provided for occupancies in GroLips R-2 and R-3 }r5,hich
are required to have Accessible, Type A or Type B dwelling or sleeping units, shall be accessible_ Where parking is provided
within or beneath a building, accessible parking spaces shall also be provided }within or beneath the building
Retaining walls exceeding 3 feet in height require separate building permits_ walls exceeding 4' in height require engineering
also_
Page: County of Albemarle Printed On: 10410512018
Review Comments for SDP201800008 11nitial Site Plan
Project Name: Vistas at South Pantops - Initial
Date Completed: Thursday, March 29, 2018 Department1DivisionfAgency: Review sus:
Reviewer: FShawn Maddox F-7 Fire Rescue Requested Changes
1 _ A hydrant is net shown near the two FDC's at the entrance_ Placement of a hydrant should consider hew it impacts traffic
flow once hose is deployed_ One hydrant to serve both (buildings would restrict emergency vehicle traffic during an incident_
Contact our office with any
questions-
_ Due to no access to the rear of these structures and interior garage spaces Fire Rescue requests stand pipes located in the
garage and on each floor to assist with fire suppression and to reduce the hose pull which could exceed 150' in the garages-
3- A knox box will be required. please add a note indicating the placement must be approved by the fire code official-
4- Afire flow test will be required prior to final acceptance.
Thank YOU for address the travel way width before sribmission_
Page: County of Albemarle Printed On: 10410512018
Review Comments for SDP201800008 11nitial Site Plan
Project Name: Vistas at South Pantops - Initial
Date Completed: Wednesday, April 18, 2018 Department1DivisionfAgency: Review sus:
Reviewer:
rRichard Nelson LJ ACA See Recommendations
Page: County of Albemarle Printed On: 10411812018
Review Comments for SDP201800008 11nitial Site Plan
Project Name: Vistas at South Pantops - Initial
Date Completed: Wednesday, April 18, 2018 Department1DivisionfAgency: Review sus:
Reviewer: Fdam Moore F-1 VDOT Requested Changes
1 _ The intention of the sites along South Pantops Drive is to have frontage improvements (widening to match existing
sections) constructed when the sites are developed_ It is the County's authority to require
this-
_ Show route number, street name, ADT, ROW width, and design/posted speeds-
3- Please adjust line weight so that the plan is more legible-
4- The existing culvert being tied in to must be in good condition, otherwise it will need to be replaced before connecting_
Contact Andrew Scott at the Charlottesville Residency to schedule an inspection-
5- Where are the proposed retaining walls' failure zones in relation to the road and right-of-way? If within the right-of-way, the
structures must be approved by the Culpeper District Structure & Bridge Section-
6- Note that the final site plan must show conformance with the VDOT Road Design Manual Appendices B(1) and F, as well
as any other applicable standards regulations or other requirements_
Page: County of Albemarle Printed On: 10411812018
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
1601 Orange Road
Culpeper. Virginia 22701
Stephen C. Brfch, P.E.
Commissioner
April 18, 2018
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Attn: Tim Padalino
Re: Vistas at South Pantops — Initial Site Plan
SDP-2018-00008
Review #1
Dear Mr. Padalino:
The Department of Transportation, Charlottesville Residency Transportation and Land Use
Section, has reviewed the above referenced plan as submitted by Dominion Engineering, dated 5
March 2018, and offers the following comments:
1. The intention of the sites along South Pantops Drive is to have frontage improvements
(widening to match existing sections) constructed when the sites are developed. It is the
County's authority to require this.
2. Show route number, street name, ADT, ROW width, and design/posted speeds.
3. Please adjust line weight so that the plan is more legible.
4. The existing culvert being tied in to must be in good condition, otherwise it will need to
be replaced before connecting. Contact Andrew Scott at the Charlottesville Residency to
schedule an inspection.
5. Where are the proposed retaining walls' failure zones in relation to the road and right-of-
way? If within the right-of-way, the structures must be approved by the Culpeper District
Structure & Bridge Section.
6. Note that the final site plan must show conformance with the VDOT Road Design
Manual Appendices B(1) and F, as well as any other applicable standards, regulations or
other requirements.
Please provide two copies of the revised plan along with a comment response letter. If further
information is desired, please contact Justin Deel at 434-422-9894.
VirginiaDOT.org
WE KEEP VIRGINIA MOVING
April 18, 2018
Tim Padalino
Page 2
A VDOT Land Use Permit will be required prior to any work within the right-of-way. The
owner/developer must contact the Charlottesville Residency Transportation and Land Use
Section at (434) 422-9399 for information pertaining to this process.
Sincerely,
Adam J. Moore, P.E.
Area Land Use Engineer
Charlottesville Residency
VirginiaDOT.org
WE KEEP VIRGINIA MOVING
Review Comments for SDP201800008 11nitial Site Plan
Project Name: Vistas at South Pantops - Initial
Date Completed: Thursday, April 26, 2019 Department1DivisionfAgency: Review sus:
Reviewer: Adam Moore a VDOT Requested Changes
Page: County of Albemarle Printed On: 10412612018
COMMONWEALTH of VIRGINIA
In Cooperation with the Thomas Jefferson Health District ALBEMARLE CHARLOTTESVILLE
State Department of Health FLUVANNA COUNTY(PALMYRA)GREENE
1138 Rose Hill Drive COUNTY (STANARDSVILLE)LOUISA COUNTY(LOUISA)
Phone (434) 972-6219 P O. Box 7546 NELSON COUNTY (LOVINGSTON)
Fax (434) 972-4310
Charlottesville, Virginia 22906
April 12, 2018
Tim Padalino, Senior Planner
Albemarle County Community Development
401 McIntire Road
Charlottesville, VA 22902
RE: The Vistas at South Pantops
Initial Site Development Plan
SDP2018-08
Mr. Padalino:
As requested by your department, I have reviewed the subject plan, dated 3/5/18, for The
Vistas at South Pantops, for compliance with VDH regulations. It appears that all
proposed construction is to connect to public water and sewer systems and therefore I
have no comments or concerns.
Recommendation: Approval
Conditions: None
If there are any questions or you wish to discuss, please give me a call, 434-972-4306.
Sincerely,
Alan Mazurowski
Environmental Health Supervisor
Thomas Jefferson Health District