HomeMy WebLinkAboutWPO201700081 Permit 2018-05-30 Registration Statement
General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10)
(Please Type or Print All Information)
1. Construction Activity Operator: (General permit coverage will be issued to this operator. The Certification in Item#12 must be
signed by the appropriate person associated with this operator.)
Name: Brookdale Partners, LP, a Virginia Limited Partnership
Contact: William N. Park
Mailing Address: 1821 Avon Street Suite 200
City: Charlottesville State: VA Zip: 22902 Phone: 434-979-2900
Email address(if available): wpark@pinnacleconstructionva.corn
Indicate if DEQ may transmit general permit correspondence electronically: Yes❑ No Q
2. Existing General Permit Registration Number(for renewals only): N/A
3. Name and Location of the Construction Activity:
Name: Brookdale
Address(if available):
City: State:
Zip:
County(if not located within a City): Albemarle County
Latitude(decimal degrees): N 38.006919 Longitude(decimal degrees): W 78.522851
Name and Location of all Off-site Support Activities to be covered under the general permit:
Name:
Address(if available):
City: State:
Zip:
County(if not located within a City): -
Latitude(decimal degrees): Longitude(decimal degrees):
4. Status of the Construction Activity(check only one): Federal❑ State❑ Public❑ Private Q
5. Nature of the Construction Activity(e.g.,commercial,industrial,residential,agricultural,oil and gas,etc.):
Multi-family residential
6. Name of the Receiving Water(s)and Hydrologic Unit Code(HUC):
Name: Moores Creek Name: •
HUC: JR15
HUC:
7. If the discharge is through a Municipal Separate Storm Sewer System(MS4),the name of the MS4 operator:
N/A
8. Estimated Project Start and Completion Date:
Start Date(mm/dd/yyyy): 6/1/18 Completion Date(mm/dd/yyyy): 6/1/20
9. Total Land Area of Development(to the nearest one-hundredth acre): 5.76
Estimated Area to be Disturbed(to the nearest one-hundredth acre): 5.55
10. Is the area to be disturbed part of a larger common plan of development or sale? Yes El No 0
11. A stormwater pollution prevention plan (SWPPP)must be prepared in accordance with the requirements of the General
VPDES Permit for Discharges of Stormwater from Construction Activities prior to submitting this Registration Statement.
By signing this Registration Statement the operator is certifying that the SWPPP has been prepared.
12. Certification:"I certify under penalty of law that I have read and understand this Registration Statement and that this document
and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and
evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons
directly responsible for gathering the inf.•••- "en, the information submitted is to the best of my knowledge and belief true,
accurate, and complete. I am aware at there - e significant penalties for submitting false information including the possibility of
fine and imprisonment for-•: .' .: 'olations."
Printed Name: Wi Title: Manager of Gen'1 Partner
Signature: Date: ////7/2-0/7
(Please sign in INK. This Certification must be signed by the appropriate person associated with the operator identified in
Item#1.)
07/2014
Page 1 of 1
iclir
e ,x
COMMONWEALTH of VIRGINIA
DEPARTMENT OF ENVIRONMENTAL QUALITY
Street address: 1111 E.Main Street,Suite 1400,Richmond,Virginia 23219
Matthew J.Strickler Mailing address:P.O.Box 1105,Richmond,Virginia 23218 David K.Paylor
Secretary of Natural Resources www.deq.virginia.gov Director
(804)698-4000
May 24, 2018 1-800-592-5482
Brookdale Partners LP
1821 Avon St Ste 200
Charlottesville, VA 22902
wpark@pinnacleconstructionva.com
RE: Coverage under the VPDES Construction General Permit(VAR10)
General Permit No.VAR1OL131
W PO2017-00081
Brookdale
Residential
Albemarle
Dear Permittee:
DEQ has reviewed your Registration Statement received on December 14, 2017 and determined that the
proposed land-disturbing activity is covered under the General VPDES Permit for Discharges of Stormwater from
Construction Activities (VAR10). The effective date of your coverage under this general permit is July 1, 2014 or
the date of this letter, whichever is later. A copy of the general permit can be obtained from DEQ's webpage at
the following location: http://www.deq.virginia.gov/Portals/0/DEQ/Water/Publications/CGP2014.pdf.
The general permit contains the applicable Stormwater Pollution Prevention Plan (SWPPP) requirements and
other conditions of coverage. Please print the general permit and read it carefully as you will be responsible for
compliance with all permit conditions. Additionally, coverage under this construction general permit does not
relieve the operator of complying with all other federal, state, or local laws and regulations.
DEQ staff has determined that the proposed land-disturbing activity will discharge to a surface water identified
as impaired or for which a TMDL wasteload allocation has been established and approved prior to the term of the
general permit for(i) sediment or a sediment-related parameter or(ii) nutrients. Therefore, the following general
permit(Part 1.8.4)and SWPPP requirements(Part II.A.5)must be implemented for the land-disturbing activity:
• Permanent or temporary soil stabilization shall be applied to denuded areas within seven (7) days after
final grade is reached on any portion of the site;
• Nutrients (e.g., fertilizers) shall be applied in accordance with manufacturer's recommendations or an
approved nutrient management plan and shall not be applied during rainfall events;
• Inspections shall be conducted at a frequency of (i) at least once every four (4) business days or (ii) at
least once every(5)business days and no later than 48 hours following a measurable storm event. In the
event that a measurable storm event occurs when there are more than 48 hours between business days,
the inspection shall be conducted on the next business day; and
• Representative inspections used by utility line installation, pipeline construction, or other similar linear
construction activities shall inspect all outfalls.
In accordance with the Virginia Stormwater Management Program State Permit Fee Regulation
(9 VAC 25-870-830), you may be required to pay an annual permit maintenance fee until coverage under this
general permit is terminated. If you are required to pay an annual permit maintenance fee, you will receive an
invoice from the VSMP Authority including the amount and due date.
The general permit will expire on June 30, 2019. The conditions of the general permit require that you submit
a new registration statement at least 90 days prior to that date if you wish to continue coverage under the general
permit, unless permission for a later date has been granted by the Board. Permission cannot be granted to submit
the registration statement after the expiration date of the general permit.
If you have any questions about this permit, please contact the DEQ Office of Stormwater Management at
ConstructionGP(a�deq.virginia.gov.
Sincerely,
Qfrinct, Pibb
Jaime B. Robb, Manager
Office of Stormwater Management
2
Appendix I -- Delegation of Authority Form
Delegation of Authority
I, William Park (name), hereby designate the person or specifically described
position below to be a duly authorized representative for the purpose of overseeing compliance
with environmental requirements, including the Construction General Permit, at the
Brookdale construction site. The designee is authorized to
sign any reports, stormwater pollution prevention plans and all other documents required by the
permit.
Shawn Corker, Project Superintendent (name of person or position)
Pinnacle Construction & Development Corp.(company)
1821 Avon St., Ste. 200 (address)
Charlottesville,VA 22902 (city, state,zip)
434-979-2900(Office)434-953-9122 (Cell) (phone)
By signing this authorization, I confirm that I meet the requirements to make such a designation
as set forth in General Permit No.VAR10L131 (Reference State Permit), and that the
designee above meets the definition of a"duly authorized representative"as set forth in
General Permit No. VAR10L131 (Reference State Permit).
I certify under penalty of law that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gathered and evaluated the information submitted. Based on my inquiry of the person
or persons who manage the system,or those persons directly responsible for gathering the
information,the information submitted is, to the best of my knowledge and belief, true, accurate,
and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fine and imprisonment for knowing violations.
Name• William N. Park
Company: Pinnacle Construction : %-velop ent Corp.
Title: dger
Signature:
Date: s/Se