Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201700040 Bond Estimates 2018-05-29 (2)
Project Name: VSMP Plan for Kapp Driveway - Stream Crossing, WPO201700040WPO file number: WPO201700040Mitigation Plan Bond EstimateItem ItemNo.UnitUnit CostCostNumber(installed)1Mitigation Area -trees (canopy + understory) 77 Each $150.00 $11,550.002Small shrubs & grasses (VDOT bid tab- 2013, 4 species, $ x 2) Each $29.52 $0.00cost sum $11,550.00proj mgmt $1,732.50contingency $1,328.255/29/2018Total$14,620Mitigation-wpo201700040-Kapp Driveway-052918.xlsxNote: based upon 30,636 ft2 stream buffer impact -Ref. sheet C12 /VSMP Plan5/29/2018