HomeMy WebLinkAboutWPO201700036 Inspection 2018-05-24COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 229024596
Phone (434) 296-5832 Fax (434) 972-4126
VSMPNESCP PERMIT SITE INSPECTION REPORT
COVERAGE & POSTING REQUIREMENTS IYesf No IN/A' Reviewed during re -inspection? ElYes [:]No
1 Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
(9VAC25-870-310)(Afb. Co. Code §17-300,17-302)
2 A copy of the notice of coverage letter is posted conspicuously near the
main entrance of the construction activity? (CGP Part II.C)
Notice of the location of the SWPPP is posted near the site's entrance, if
3 applicable, and information for public access is provided? (9VAC25-870-
54.G)(CGP Part If D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS IYesI No INIAL Reviewed during re -inspection? []Yes ❑No
4 The SWPPP is on-site or made available during the inspection? (CGP
Part II D.1 & 2)(9VAC25-870-54.G)
5 The SWPPP contains a signed copy of the registration statement?
(CGP Part Il A. 1.a)
6 The SWPPP includes, upon receipt, a copy of the notice of coverage
letter and the CGP? (CGP Part II A.1.b & c)
Page t of 7
The SWPPP includes a narrative description of the nature of the
7 construction activity, including the function of the project? (CGP Part li
A. 1.d)
The SWPPP includes a legible site plan identifying all appropriate
8 measures and that includes the locations of support activities and the
onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7))
9 The SWPPP contains the name, phone number and qualifications of
"Qualified Personnel" conducting inspections? (CGP Part II A.B)
10 The SWPPP contains an approved erosion and sediment control plan?
(9VAC25-870-54.B)(CGP Part II.A.2)
The SWPPP contains an approved stormwater management plan or an
» existing construction site has a stormwater management plan that
ensures compliance with the water quality and quantity requirements?
(9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria II.B ❑ II.0 ❑
12 The SWPPP contains an adequate pollution prevention plan? (9VAC25-
870-54.D)(CGP Part II.A.4)
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
13 concern, exceptional waters and the additional controls measures
applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a -b))
74 Delegation of Authority is provided and signed in accordance with Part III
K? (CGP Part II A.7)
95 The SWPPP is signed and dated in accordance with Part Ill K? (CGP Pa
it A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES Y No INIA I Reviewed during inspection? ❑Yes []No
Comments/Descriptlon
Is the SWPPP being amended whenever there is a change in the design,
16 nstruction, operation, or maintenance that has a significant effect on the
ischarge of pollutants to surface waters? (CGP Part II B(1))(9VAC25-870-
4.G)
as the SWPPP been amended if inspections or investigations by the
17 Aerator's qualified personnel, or by local, state or federal officials find that
xisting control measures are ineffective in minimizing pollutants in
ischarges? (CGP Part II B(2))(9VAC25-870-54.G)
18 Contractor(s) that will implement and maintain each control measure are
identified? (CGP Part Il B(3))(9VAC25-870-54.G)
Have there been updates to the SWPPP when any modifications to its
implementation have occurred, including a record of dates when major
99 rading activities occur, construction activities temporarily or permanently
ease on a portion of the site or stabilization measures are initiated? (CGP
Part II B.4(a))(9VAC25-870-54.G)
20 Is there documentation in the SWPPP of replaced or modified controls?
(CGP Part Ii B.4(b))(9VAC25-870-54.G)
21 Is the SWPPP updated to indicate areas that have reached final
tabilization? (CGP Part li B.4(c))(9VAC25-870-54.G)
Is the SWPPP updated to indicate properties that are no longer under the
22 legal control of the operator and the dates on which the operator no longer
ad legal control over each property? (CGP Part II BA(d))(9VAC25-870-
4.G)
Does the SWPPP identify the date of any prohibited discharges, the
23 volume released, actions taken to minimize the impact of the release and
+24
s taken to prevent the recurrence of any prohibited discharge?
rt II B.4(e-f)) (9VAC25-870-54.G)
ents, modifications, or updates to the SWPPP are signed in
nce with Part III K? (CGP Part II B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS Yes No N/A Reviewed during inspection? ❑Yes ❑No
CommentsMeswpuan
Page 2 of 7
Page 3 of 7
Inspections required by the SWPPP are conducted at the required
25 frequency, including a modified frequency for impaired water(s), approved
TMDL(s), and exceptional waters when applicable? (CGP Part II F (2))
(CGP Part II A.5.b.3)
26 Inspection reports are completed and signed in accordance with CGP
Part 11 F (3-4)? (CGP Part II F (3-4))
27 Corrective actions are taken consistent with the requirements of the
CGP? (CGP Part 11 G(1-2))
ESC AND SWM PLAN IMPLEMENTATION
Yes No N/A Reviewed during inspection? ❑Yes ❑No
CommentwDescripdon
28
Have stream buffers and steep slopes been protected as shown on the
plan?
Sequencing of the project is implemented in accordance with the
29
approved erosion and sediment control plan and stormwater managemen
plans? (9VAC25-870-54.B and C)
Have all denuded areas requiring temporary or permanent stabilization
been stabilized, and have stabilization requirements for impaired waters,
prep cess e
30
approved TMDL(s), pollutants of concern and exceptional waters, when
�, 1A
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25-
Z
880-60) (CGP Part I F.1 (a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8))
(CGP 11 E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
31
with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part 11
A.2(c)) (9VAC25-870-54.B)
A permanent vegetative cover has been established that is uniform,
32
mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
(CGP Part 11 A.2(c)) (CGP If E(1-2)) (9VAC25-870-54.B)
Have sediment trapping facilities been constructed as the first step in land
33
disturbance activities? (9VAC 25-840-40.4) (CGP Part 11 A.2(c)) (CGP Il
E(1-2)) (9VAC25-870-54.8)
Have earthen structures been stabilized immediately after installation?
34
(9VAC 25-840-40.5) (CGP Part 11 A.2(c)) (CGP it E(1-2)) (9VAC25-870-
54.13)
Are sediment traps and basins installed in accordance with MS -6 and the
35
approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II
IV
I
A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-54.13)
Are finished cut and fill slopes adequately stabilized to prevent or correct
36
excessive erosion? (9VAC 25-840-40.7) (CGP Part 11 A.2(c)) (CGP 11 E(1-
2)) (9VAC25-870-54.B)
Is concentrated runoff down cut or fill slopes contained in an adequate
37
permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II
A.2(c)) (CGP ff E(1-2)) (9VAC25-870-54.B)
Is adequate drainage or other protection provided for water seeps?
38
(9VAC 25-840-40.9) (CGP Part 11 A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-
54.B)
Do all operational storm sewer inlets have adequate inlet protection?
39
(9VAC 25-840-40.10) (CGP Part 11 A.2(c)) (CGP it E(1-2)) (9VAC25-870-
54.13)
Are stormwater conveyance channels adequately stabilized with channel
40
lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part 11 A.2(c))
(CGP 11 E(1-2)) (9VAC25-870-54.B)
Is in -stream construction conducted using measures to minimize channel
41
damage? (9VAC 25-840-40.12) (CGP Part 11 A.2(c)) (CGP 11 E(1-2))
(9VAC25-870-54. B)
Are temporary stream crossings of non -erodible material installed where
42
applicable? (9VAC 25-840-40.13) (CGP Part 11 A.2(c)) (CGP 11 E(1-2))
(9VAC25-870-54. B)
43
Is necessary restabilization of in -stream construction complete? (9VAC
25-840-40.15) (CGP 11 E(1-2)) (9VAC25-870-54.B)
Page 3 of 7
Are utility trench operations conducted and stabilized in accordance with
44 MS-16? (9VAC 25-840-40.16) (CGP Part 11 A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B)
Are soil and mud kept off paved or public roads to minimize the transport
45 of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP If E(1-2))
(9VAC25-870-54.B)
Have all temporary control structures that are no longer needed been
46 removed and disturbed soil resulting from their removal permanently
stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B)
Are properties and waterways downstream from development adequately
47 protected from erosion, sediment and damage in accordance with the
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840-
40.19(a-n))
48 Permanent control measures included in the SWPPP are in place?
(9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a))
POLLUTION PREVENTION PLAN IMPLEMENTATION I Yes No N/A I Reviewed during inspection? ❑Yes []No
Commentaxiescdp&on
Practices are in place to prevent and respond to leaks, spills, and other
releases including (i) procedures for expeditiously stopping, containing,
49 and cleaning up spills, leaks, and other releases, and (i!) procedures for
reporting leaks, spills, and other releases in accordance with Part III G?
(CGP Part 11 A.4.e(1))(9VAC25-870-56)
Practices aro in place to prevent the discharge of spilled and leaked fuels
50 and chemicals from vehicle fueling and maintenance activities? (CGP Part 11
A.4.e(2))(9VAC25-870-56)
Practices are in place to prevent the discharge of soaps, solvents,
5� detergents, and wash water from construction materials, including the
clean-up of stucco, paint, form release oils, and curing compounds? (CGP
Part 11 A.4.e(3))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from vehicle
52 and equipment washing, wheel wash water, and other types of washing?
(CGP Part II A.4.e(4))(9VAC25-870-56)
53 Concrete wash water is directed into a leak-proof container or leak-proof
settling basin? (CGP Part 11 A.4.e(5))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from
54 storage, handling, and disposal of construction products, materials, and
wastes? (CGP Part 11 A.4.e(6))(9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
55 petroleum products, hazardous or toxic wastes, and sanitary wastes?
(CGP Part 11 A.4.e(7)(9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
56 pollutant-generating activities not addressed above, when applicable?
(CGP Part II A.4.e(8))(9VAC25-870-56)
Inspector Signature:
Page 4 of 7
Date:
Recommended Corrective Action Deadline:
Targeted Re -inspection Date:
Comments: 51AI -DO
Recommended Corrective Action:
(IAcA
The recommended corrective action deadline date applies to all conditions noted on this report unless otherwise noted. If listed condition(s) currently
constitute non-compliance and/or corrective actions are not completed by the deadline, other enforcement actions may be issued to the entity responsible for
ensuring compliance on the above project.
Inspector Signature:
Page 6 of 7
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
{ n j t ��' Charlottesville, Virginia 22902-4596
( C. { S P Phone (434) 296-5832 Fax (434) 972-4126
rZV✓,5 A
m SohrIVahna,c��
V MP/VESCP PERMT SITE INSPECTION REPORT
Project Name:
New Ivy Solid Waste Transfer Station
VSMP
ProjectiWPO Number:
WP02017-00036
Project Address:
4576 Dick Woods Rd
DEQ Permit Number (if
applicable):
VARlOK204
Project Operator:
Lantz Construction Co
Operator Telephone #:
540-896-8911
Project Contact:
Tony Tomlin
Contact Telephone #:
757-466-3368
Contact E -Mail:
ttomlinAscsenaineers.com
Qualified Personnel (QP):
David Stavitski — RLD00200
Inspector:
John Yerby
Weather (Wet/Dry/Rain):
�. fiq
Disturbed Acreage:
3.79
Inspection Date & Time:
Jlf
Single -Family: ❑ Yes o
Stage of Construction: LJ Pre -Construction Meeting LJ Initial Clearing & Grading
Z`7' Building Construction E]Final Grading ❑ Construction of SWM Facilities
❑ Notice of Termination ❑ Other:
Rough Grading
❑ Final Stabilization
Re -Inspection:
❑ Yes tKNo
Page 1 of 7
COVERAGE & POSTING REQUIREMENTS
Yes
No
N/A
Reviewed during re -inspection? ❑Yes ❑No
Commen ts/Descriptlon
1
Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
(9VAC25-870-310)(Alb. Co. Code §17-300, 17-302)
2
A copy of the notice of coverage letter is posted conspicuously near the
11
main entrance of the construction activity? (CGP Part II.C)
Notice of the location of the SWPPP is posted near the site's entrance, if
3
applicable, and information for public access is provided? (9VAC25-870-
54.G)(CGP Part II D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS
Yes
No
N/A
Reviewed during re -inspection? ❑Yes []No
Comments/Descripffon
4
The SWPPP is on-site or made available during the inspection? (CGP
Part II D.1 & 2)(9VAC25-870-54.G)
5
The SWPPP contains a signed copy of the registration statement?
(CGP Part II A.1.a)
6
The SWPPP includes, upon receipt, a copy of the notice of coverage
letter and the CGP? (CGP Part II A. 1.b & c)
Page 1 of 7
�a vrwc.rvi v-.��.vJwvr ran n.n.01 ICGnnl Gill VflLUF14 11.0 LJ 11.{, LJ
12 The SWPPP contains an adequate pollution prevention plan? (9VAC25-
870-54.D)(CGP Part II.A.4)
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
13 concern, exceptional waters and the additional controls measures
applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a -b))
14 Delegation of Authority is provided and signed in accordance with Part III
K? (CGP Part II A.7)
15 The SWPPP is signed and dated in accordance with Part III K? (CGP Part
II A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES Yes No N/A Reviewed during inspection? ❑Yes []No
Comments/Descriptfon
Is the SWPPP being amended whenever there is a change in the design,
16 construction, operation, or maintenance that has a significant effect on the
PisC)
charge of pollutants to surface waters? (CGP Part II B(1))(9VAC25-870-
Has the SWPPP been amended if inspections or investigations by the
17 operator's qualified personnel, or by local, state or federal officials find that
existing control measures are ineffective in minimizing pollutants in
discharges? (CGP Part II B(2))(9VAC25-870-54.G)
18 ontractor(s) that will implement and maintain each control measure are
identified? (CGP Part II B(3))(9VAC25-870-54.G)
Have there been updates to the SWPPP when any modifications to its
implementation have occurred, including a record of dates when major
19 rading activities occur, construction activities temporarily or permanently
ease on a portion of the site or stabilization measures are initiated? (CGP
Part II B.4(a))(9VAC25-870-54.G)
20 Is there documentation in the SWPPP of replaced or modified controls?
(CGP Part II B.4(b))(9VAC25-870-54.G)
21 Is the SWPPP updated to indicate areas that have reached final
stabilization? (CGP Part II B.4(c))(9VAC25-870-54.G)
Is the SWPPP updated to indicate properties that are no longer under the
22 legal control of the operator and the dates on which the operator no longer
had legal control over each property? (CGP Part II B.4(d))(9VAC25-870-
54. G)
Does the SWPPP identify the date of any prohibited discharges, the
23 volume released, actions taken to minimize the impact of the release and
measures taken to prevent the recurrence of any prohibited discharge?
(CGP Part II B.4(e-0) (9VAC25-870-54.G)
24 Amendments, modifications, or updates to the SWPPP are signed in
accordance with Part III K? (CGP Part II B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS Yes No N/A Reviewed during inspection? ❑Yes ❑No
Comments/Descripdon
Page 2 of 7
The SWPPP includes a narrative description of the nature of the
7
construction activity, including the function of the project? (CGP Part II
AAA)
The SWPPP includes a legible site plan identifying all appropriate
8
measures and that includes the locations of support activities and the
onsite rain gauge, when applicable? (CGP Part ll A.1.e(1-7))
9
The SWPPP contains the name, phone number and qualifications of
"Qualified Personnel" conducting inspections? (CGP Part 11 A.6)
10 The SWPPP contains an approved erosion and sediment control plan?
(9VAC25-870-54.B)(CGP Part II.A.2)
The SWPPP contains an approved stormwater management plan or an
01
11 existing construction site has a stormwater management plan that
ensures compliance with the water quality and quantity requirements?
Ye'. r•nr ern — n
�a vrwc.rvi v-.��.vJwvr ran n.n.01 ICGnnl Gill VflLUF14 11.0 LJ 11.{, LJ
12 The SWPPP contains an adequate pollution prevention plan? (9VAC25-
870-54.D)(CGP Part II.A.4)
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
13 concern, exceptional waters and the additional controls measures
applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a -b))
14 Delegation of Authority is provided and signed in accordance with Part III
K? (CGP Part II A.7)
15 The SWPPP is signed and dated in accordance with Part III K? (CGP Part
II A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES Yes No N/A Reviewed during inspection? ❑Yes []No
Comments/Descriptfon
Is the SWPPP being amended whenever there is a change in the design,
16 construction, operation, or maintenance that has a significant effect on the
PisC)
charge of pollutants to surface waters? (CGP Part II B(1))(9VAC25-870-
Has the SWPPP been amended if inspections or investigations by the
17 operator's qualified personnel, or by local, state or federal officials find that
existing control measures are ineffective in minimizing pollutants in
discharges? (CGP Part II B(2))(9VAC25-870-54.G)
18 ontractor(s) that will implement and maintain each control measure are
identified? (CGP Part II B(3))(9VAC25-870-54.G)
Have there been updates to the SWPPP when any modifications to its
implementation have occurred, including a record of dates when major
19 rading activities occur, construction activities temporarily or permanently
ease on a portion of the site or stabilization measures are initiated? (CGP
Part II B.4(a))(9VAC25-870-54.G)
20 Is there documentation in the SWPPP of replaced or modified controls?
(CGP Part II B.4(b))(9VAC25-870-54.G)
21 Is the SWPPP updated to indicate areas that have reached final
stabilization? (CGP Part II B.4(c))(9VAC25-870-54.G)
Is the SWPPP updated to indicate properties that are no longer under the
22 legal control of the operator and the dates on which the operator no longer
had legal control over each property? (CGP Part II B.4(d))(9VAC25-870-
54. G)
Does the SWPPP identify the date of any prohibited discharges, the
23 volume released, actions taken to minimize the impact of the release and
measures taken to prevent the recurrence of any prohibited discharge?
(CGP Part II B.4(e-0) (9VAC25-870-54.G)
24 Amendments, modifications, or updates to the SWPPP are signed in
accordance with Part III K? (CGP Part II B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS Yes No N/A Reviewed during inspection? ❑Yes ❑No
Comments/Descripdon
Page 2 of 7
plans"! (9VAG25-870-54.8 and C)
Have all denuded areas requiring temporary or permanent stabilization Oil dei7��d a r0 mss -Ftit hq
been stabilized, and have stabilization requirements for impaired waters,
30 approved TMDL(s), pollutants of concern and exceptional waters, when
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25- Ckirj
880-60) (CGP Part I F.1 (a)) (CGP Part II A.5.b(1)) (CGP Part li A.2.c (8)) `� � i, ;1 p
(CGP II E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected MV fq 4 �� dw _5 fiv d
31 with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II
A.2(c)) (9VAC25-870-54.13) !
A permanent vegetative cover has been established that is uniform,
32 mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
(CGP Part II A.2(c)) (CGP It E(1-2)) (9VAC25-870-54.13)
Have sediment trapping facilities been constructed as the first step in land r �y�r j � � �` bc'cl
33 disturbance activities? (9VAC 25-840-40.4) (CGP Part it A.2(c)) (CGP II
E(1-2)) (9VAC25-870-54.B)
Have earthen structures been stabilized immediately after installation?
34 (9VAC 25-840-40.5) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.8)
Are sediment traps and basins installed in accordance with MS -6 and the
35 approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part 11
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.13)
Are finished cut and fill slopes adequately stabilized to prevent or correct
36 excessive erosion? (9VAC 25-840-40.7) (CGP Part 11 A.2(c)) (CGP II E(1- ,
2)) (9VAC25-870-54.B)
Is concentrated runoff down cut or fill slopes contained in an adequate
37 permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part Il
A.2(c)) (CGP If E(1-2)) (9VAC25-870-54.B)
Is adequate drainage or other protection provided for water seeps?
38 (9VAC 25-840-40.9) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Do all operational storm sewer inlets have adequate inlet protection?
39 (9VAC 25-840-40.10) (CGP Part II A.2(c)) (CGP If E(1-2)) (9VAC25-870-
54.13)
Are stormwater conveyance channels adequately stabilized with channel
40 lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part II A.2(c))
(CGP II E(1-2)) (9VAC25-870-54.B)
Is in -stream construction conducted using measures to minimize channel yi
41 damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP II E(1-2)) rHl
(9VAC25-870-54. B)
Are temporary stream crossings of non -erodible material installed where
42 applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B)
43 Is necessary restabilization of in -stream construction complete? (9VAC
25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.B) Irl
Page 3 of 7
Inspections required by the SWPPP are conducted at the required
25
frequency, including a modified frequency for impaired water(s), approved
TMDL(s), and exceptional waters when applicable? (CGP Part II F (2))
(CGP Part II A.5.b.3)
26
Inspection reports are completed and signed in accordance with CGP
Part II F (3-4)? (CGP Part II F (3-4))
27
Corrective actions are taken consistent with the requirements of the
CGP? (CGP Part II G(1-2))
ESC AND SWM PLAN IMPLEMENTATION
Yes
No
N/A
Reviewed during inspection? ❑Yes []No
Comments/Descil Lion
28
Have stream buffers and steep slopes been protected as shown on the
plan?
Sequencing of the project is implemented in accordance with the
29
approved erosion and sediment control plan and stormwater managemen
plans"! (9VAG25-870-54.8 and C)
Have all denuded areas requiring temporary or permanent stabilization Oil dei7��d a r0 mss -Ftit hq
been stabilized, and have stabilization requirements for impaired waters,
30 approved TMDL(s), pollutants of concern and exceptional waters, when
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25- Ckirj
880-60) (CGP Part I F.1 (a)) (CGP Part II A.5.b(1)) (CGP Part li A.2.c (8)) `� � i, ;1 p
(CGP II E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected MV fq 4 �� dw _5 fiv d
31 with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II
A.2(c)) (9VAC25-870-54.13) !
A permanent vegetative cover has been established that is uniform,
32 mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
(CGP Part II A.2(c)) (CGP It E(1-2)) (9VAC25-870-54.13)
Have sediment trapping facilities been constructed as the first step in land r �y�r j � � �` bc'cl
33 disturbance activities? (9VAC 25-840-40.4) (CGP Part it A.2(c)) (CGP II
E(1-2)) (9VAC25-870-54.B)
Have earthen structures been stabilized immediately after installation?
34 (9VAC 25-840-40.5) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.8)
Are sediment traps and basins installed in accordance with MS -6 and the
35 approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part 11
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.13)
Are finished cut and fill slopes adequately stabilized to prevent or correct
36 excessive erosion? (9VAC 25-840-40.7) (CGP Part 11 A.2(c)) (CGP II E(1- ,
2)) (9VAC25-870-54.B)
Is concentrated runoff down cut or fill slopes contained in an adequate
37 permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part Il
A.2(c)) (CGP If E(1-2)) (9VAC25-870-54.B)
Is adequate drainage or other protection provided for water seeps?
38 (9VAC 25-840-40.9) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Do all operational storm sewer inlets have adequate inlet protection?
39 (9VAC 25-840-40.10) (CGP Part II A.2(c)) (CGP If E(1-2)) (9VAC25-870-
54.13)
Are stormwater conveyance channels adequately stabilized with channel
40 lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part II A.2(c))
(CGP II E(1-2)) (9VAC25-870-54.B)
Is in -stream construction conducted using measures to minimize channel yi
41 damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP II E(1-2)) rHl
(9VAC25-870-54. B)
Are temporary stream crossings of non -erodible material installed where
42 applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B)
43 Is necessary restabilization of in -stream construction complete? (9VAC
25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.B) Irl
Page 3 of 7
Are utility trench operations conducted and stabilized in accordance with
44 MS -16? (9VAC 25-840-40.16) (CGP Part 11 A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B)
Are soil and mud kept off paved or public roads to minimize the transport
45 of sediment? (9VAC 25-840-40.17) (CGP Part 11 A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B)
Have all temporary control structures that are no longer needed been
46 removed and disturbed soil resulting from their removal permanently
stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP 11 E(1-2))
(9VAC25-870-54. B)
Are properties and waterways downstream from development adequately
47 protected from erosion, sediment and damage in accordance with the n
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25 -840-
40.19(a -n))
48 Permanent control measures included in the SWPPP are in place?
(9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a))
POLLUTION PREVENTION PLAN IMPLEMENTATION Yes No N/A Reviewed during inspection? ❑Yes []No
Comments/Description
Practices are in place to prevent and respond to leaks, spills, and other
releases including (i) procedures for expeditiously stopping, containing,
49 and cleaning up spills, leaks, and other releases; and (ii) procedures for
reporting leaks, spills, and other releases in accordance with Part II I G?
(CGP Part 11 A.4.e(1))(9VAC25-870-56)
Practices are in place to prevent the discharge of spilled and leaked fuels
50 and chemicals from vehicle fueling and maintenance activities? (CGP Part II
A.4. e(2))(9VAC25-870-56)
Practices are in place to prevent the discharge of soaps, solvents,
51 detergents, and wash water from construction materials, including the
clean-up of stucco, paint, form release oils, and curing compounds? (CGP
Part II A.4.e(3))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from vehicle
52 and equipment washing, wheel wash water, and other types of washing?
(CGP Part II A.4.e(4))(9VAC25-870-56)
53 Concrete wash water is directed into a leak -proof container or leak -proof
settling basin? (CGP Part 11 A.4.e(5))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from
54 storage, handling, and disposal of construction products, materials, and
wastes? (CGP Part II A.4.e(6))(9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
55 petroleum products, hazardous or toxic wastes, and sanitary wastes?
(CGP Part II A.4.e(7)(9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
56 pollutant -generating activities not addressed above, when applicable?
(CGP Part 11 A.4.e(8))(9VAC25-870-56)
Inspector Signature: l✓� Date:
Page 4 of 7
Notes:
CONSTRUCTION GENERAL PERMIT SITE INSPECTION REPORT
REQUEST FOR CORRECTIVE ACTION
Project Name: Permit Number (if applicable): Date:
` Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and
Sediment Control Regulations (9VAC25-640), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for
Discharges of Stormwater from Construction Activities (9VAC25-880).
Page 5 of 7
Regulatory
Checklist #
Citation/Legal
Occurrence
Observation/Recommended Corrective Action
requirement'
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
` Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and
Sediment Control Regulations (9VAC25-640), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for
Discharges of Stormwater from Construction Activities (9VAC25-880).
Page 5 of 7
Recommended Corrective Action Deadline:
Targeted Re -Inspection Date: fi 1i
Z e Cc" FAI PV c 4V
Recommended Corrective Action:
�5at / j�ml
Co VSi-
SSV 4U���ed 11
r CAI e'enacuedOxeco
M d_s C fk,4 dy y
Z� l�,' lash -gin evert
4 -h -a n cia
The recommended corrective action deadline date applies to all conditions noted on this report unless otherwise noted. If listed condition(s) currently
constitute non-compliance and/or corrective actions are not completed by the deadline, other enforcement actions may be issued to the entity responsible for
ensuring compliance on thabov proje "
Inspector Signature: `` s�''� �`' Date:
�A
Page 6 of 7
COUNTY OF ALBEMARLE
Department of Community Development
CONSTRUCTION GENERAL PERMIT SITE INSPECTION REPORT
COVERAGE & POSTING REQUIREMENTSYe No N/A Reviewed during reinspection? ❑Yes ❑No
CommentsMescjpfion
1 Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
(9VAC25-870-310)
2 A copy of the notice of coverage letter is posted conspicuously near the
main entrance of the construction activity? (CGP Part II.C)
Notice of the location of the SWPPP is posted near the site's entrance, if
3 applicable, and information for public access is provided? (9VAC25-870-
54.G)(CGP Part li D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS Yes No N/A Reviewed during re -inspection? ❑Yes ❑No
Commenfs/Descrfption
7The
PPP is on-site or made available during the inspection? (CGP
DA & 2)(9VAC25-870-54.G)
PPP contains a signed copy of the registration statement?
art II A.1.a)
6 The SWPPP includes, upon receipt, a copy of the notice of coverage
letter and the CGP? (CGP Part II A.1.b & c)
The SWPPP includes a narrative description of the nature of the
7 construction activity, including the function of the project? (CGP Part 11
A.1.d)
Page 1 of 7
11
The SWPPP includes a narrative description of the nature of the
(9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 111.13 ❑ ILC ❑
7
construction activity, including the function of the project? (CGP Part II
The SWPPP contains an adequate pollution prevention plan? (9VAC25-
870-54.D)(CGP Part II.A.4)
AAA)
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
13
The SWPPP includes a legible site plan identifying all appropriate
applicable? (9VAC 25-870-54.E)(CGP Part I(A.5 (a -b))
8
measures and that includes the locations of support activities and the
Delegation of Authority is provided and signed in accordance with Part III
K? (CGP Part II A.7)
onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7))
15
The SWPPP is signed and dated in accordance with Part III K? (CGP Part
9
The SWPPP contains the name, phone number and qualifications of
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES
"Qualified Personnel" conducting inspections? (CGP Part II A.6)
10
The SWPPP contains an approved erosion and sediment control plan?
Is the SWPPP being amended whenever there is a change in the design,
(9VAC25-870-54.B)(CGP Part II.A.2)
16
The SWPPP contains an approved stormwater management plan or an
11
- Oki
'y WI IAII VIdIUI I'I lC Il0b Q a UI If IWdll71 IIIdh dyUFI)eht pidh that
ensures compliance with the water quality and quantity requirements?
(9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 111.13 ❑ ILC ❑
12
The SWPPP contains an adequate pollution prevention plan? (9VAC25-
870-54.D)(CGP Part II.A.4)
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
13
concern, exceptional waters and the additional controls measures
applicable? (9VAC 25-870-54.E)(CGP Part I(A.5 (a -b))
14
Delegation of Authority is provided and signed in accordance with Part III
K? (CGP Part II A.7)
15
The SWPPP is signed and dated in accordance with Part III K? (CGP Part
II A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES
Yes No N/A Reviewed during inspection? ❑Yes ❑No
CommenWiDescription
Is the SWPPP being amended whenever there is a change in the design,
16
onstruction, operation, or maintenance that has a significant effect on the
discharge of pollutants to surface waters? (CGP Part II B(1))(9VAC25-870-
4.G)
Has the SWPPP been amended if inspections or investigations by the
17
operator's qualified personnel, or by local, state or federal officials find that
existing control measures are ineffective in minimizing pollutants in
discharges? (CGP Part II B(2))(9VAC25-870-54.G)
18
Contractor(s) that will implement and maintain each control measure are
identified? (CGP Part II B(3))(9VAC25-870-54.G)
Have there been updates to the SWPPP when any modifications to its
implementation have occurred, including a record of dates when major
19
grading activities occur, construction activities temporarily or permanently
ease on a portion of the site or stabilization measures are initiated? (CGP
Part it B.4(a))(9VAC25-870-54.G)
20
Is there documentation in the SWPPP of replaced or modified controls?
(CGP Part II B.4(b))(9VAC25-870-54.G)
0 �• C !�
Ia
21
Is the SWPPP updated to indicate areas that have reached final
tabilization? (CGP Part II B.4(c))(9VAC25-870-54.G)
X ei a4
!s the SWPPP updated to indicate properties that are no longer under the
22
legal control of the operator and the dates on which the operator no longer
had legal control over each property? (CGP Part II B.4(d))(9VAC25-870-
4. G)
Does the SWPPP identify the date of any prohibited discharges, the
23
volume released, actions taken to minimize the impact of the release and
taken to
measures prevent the recurrence of any prohibited discharge?
(CGP Part 11 B.4(e-0) (9VAC25-870-54.G)
24
Amendments, modifications, or updates to the SWPPP are signed in
accordance with Part III K? (CGP Part 11 B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS Yes No N/A Reviewed during inspection? []Yes ❑No
Comments/Description
Page 2 of 7
"
Inspections required by the SWPPP are conducted at the required
25
frequency, including a modified frequency for impaired water(s), approved
TMDL(s), and exceptional waters when applicable? (CGP Part 11 F (2))
(CGP Part II A.5.b.3)
26
Inspection reports are completed and signed in accordance with CGP
Part 11 F (3-4)? (CGP Part II F (3-4))
27
Corrective actions are taken consistent with the requirements of the
CGP? (CGP Part 11 G(1-2))
ESC AND SWM PLAN IMPLEMENTATION
Yes No N/A Reviewed during inspection? ❑Yes []No
CommentsMescrrption
28
Have stream buffers and steep slopes been protected as shown on the
plan?
Sequencing of the project is implemented in accordance with the
29
approved erosion and sediment control plan and stormwater management
plans? (9VAC25-870-54.B and C)
Have all denuded areas requiring temporary or permanent stabilization
been stabilized, and have stabilization requirements for impaired waters,
30
approved TMDL(s), pollutants of concern and exceptional waters, when
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25-
.
880-60) (CGP Part I F.1(a)) (CGP Part 11 A.5.b(1)) (CGP Part 11 A.2.c (8))
(CGP 11 E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
oftd �'�'y�
31
with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II
S �CS' _;
') E [45+
A.2(c)) (9VAC25-870-54.B)
A permanent vegetative cover has been established that is uniform,
32
mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
(CGP Part 11 A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-54.B)
Have sediment trapping facilities been constructed as the first step in land
33
disturbance activities? (9VAC 25-840-40.4) (CGP Part II A.2(c)) (CGP 11
E(1-2)) (9VAC25-870-54.B)
Have earthen structures been stabilized immediately after installation?
34
(9VAC 25-840-40.5) (CGP Part 11 A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-
54. B)
Are sediment traps and basins installed in accordance with MS -6 and the
35
approved plan? (9VAC 25-840-40.6) (CGP Part 11 A.2.c (9)) (CGP Part 11
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Are finished cut and fill slopes adequately stabilized to prevent or correct
36
excessive erosion? (9VAC 25-840-40.7) (CGP Part If A.2(c)) (CGP II E(1-
2)) (9VAC25-870-54.B)
Is concentrated runoff down cut or fill slopes contained in an adequate
37
permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II
A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-54.B)
Is adequate drainage or other protection provided for water seeps?
38
(9VAC 25-840-40.9) (CGP Part 11 A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-
54.13)
Do all operational storm sewer inlets have adequate inlet protection?
39
(9VAC 25-840-40.10) (CGP Part 11 A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-
54.6)
Are stormwater conveyance channels adequately stabilized with channel
40 lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part II A.2(c))
(CGP II E(1-2)) (9VAC25-870-54.B)
Is
in -stream construction conducted using measures to minimize channel
41 damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B)
Are temporary stream crossings of non-erodibie material installed where
42 applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B)
43 Is necessary restabilization of in -stream construction complete? (9VAC
�(
25-840-40.15) (CGP 11 E(1-2)) (9VAC25-870-54.6)
I`
Page 3 of 7
Are utility trench operations conducted and stabilized in accordance with
44 MS -16? (9VAC 25-840-40.16) (CGP Part 11 A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B)
Are soil and mud kept off paved or public roads to minimize the transport
45 of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP 11 E(1-2))
(9VAC25-870-54. B)
Have all temporary control structures that are no longer needed been
46 removed and disturbed soil resulting from their removal permanently
stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B)
Are properties and waterways downstream from development adequately
47 protected from erosion, sediment and damage in accordance with the
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25 -840-
40.19(a -n))
48 Permanent control measures included in the SWPPP are in place?
(9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a))
POLLUTION PREVENTION PLAN IMPLEMENTATION Yes No N/A Reviewed during inspection? ❑Yes [:]No
Comments/Descriptlon
Practices are in place to prevent and respond to leaks, spills, and other
releases including (i) procedures for expeditiously stopping, containing,
49 and cleaning up spills, leaks, and other releases; and (ii) procedures for
reporting leaks, spills, and other releases in accordance with Part III G?
(CGP Part II A.4.e(1))(9VAC25-870-56)
Practices are in place to prevent the discharge of spilled and leaked fuels
50 and chemicals from vehicle fueling and maintenance activities? (CGP Part I I
A.4. e(2)) (9VAC25-870-56)
Practices are in place to prevent the discharge of soaps, solvents,
51 detergents, and wash water from construction materials, including the
clean-up of stucco, paint, form release oils, and curing compounds? (CGP
Part 11 A.4.e(3))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from vehicle
52 and equipment washing, wheel wash water, and other types of washing?
(CGP Part II A.4.e(4))(9VAC25-870-56)
53 Concrete wash water is directed into a leak -proof container or leak -proof
settling basin? (CGP Part II A.4.e(5))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from
54 storage, handling, and disposal of construction products, materials, and
wastes? (CGP Part II A.4.e(6))(9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
55 petroleum products, hazardous or toxic wastes, and sanitary wastes?
(CGP Part 11 A.4.e(7)(9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
56 pollutant -generating activities not addressed above, when applicable?
(CGP Part II A.4.e(8))(9VAC25-870-56)
Inspector Signature:
Page 4 of 7
Date:
COUNTY OF ALBEMA,RLE
Department of Community Development
VSMP/VESCP PERMIT SITE INSPECTION REPORT
Project Name:
COVERAGE & POSTING REQUIREMENTS
-r r
No
ProjectNVPO Number:
a 171 6003
Project Address:
(5
k eV
01
DEQ Permit Number (if
VAR to �(�
1
Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
i C Vu
a Ilcable :
Project Operator:
[tet
j ,f .'O Cer,
Operator Telephone #:
o-:- p ):
Project Contact:
A copy of the notice of coverage letter is posted conspicuously near the
Contact Telephone #.
'7- 4 .
Contact E -Mail:
V�
��
;� _
G f)j
Qualified Personnel (QP):
'
Inspector.
rTs
•e r y
Weather (Wet/Dry/Rain):
Disturbed Acreage:
applicable, and information for public access is provided? (9VAC25-870-
Inspection Date & Time:
3-1-17
Single -Family: ❑ Yes
RNb
Stage of Construction: LJ
Pre -Construction Meeting
LJ Initial Clearing & Grading L&
Rough Grading
Building Construction
❑ Final Grading ❑
Construction of SWM Facilities
❑ Final Stabilization
❑ Notice of Termination
❑ Other:
Comments/Description
Re -Inspection:
The SWPPP is on-site or made available during the inspection? (CGP
[o Yes [—]No
Part II D.1 & 2)(9VAC25-870-54.G)
Page 1 of 7
en
COVERAGE & POSTING REQUIREMENTS
Yes
No
WA
Reviewed during re -inspection? []Yes ❑No
01
Comments/Descdption
1
Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
(9VAC25-870-310)(Alb. Co. Code §17-300, 17-302)
2
A copy of the notice of coverage letter is posted conspicuously near the
main entrance of the construction activity? (CGP Part II.C)
Notice of the location of the SWPPP is posted near the site's entrance, if
3
applicable, and information for public access is provided? (9VAC25-870-
54.GxCGP Part II D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS
Yes
No
WA
Reviewed during re -inspection? ❑Yes []No
Comments/Description
4
The SWPPP is on-site or made available during the inspection? (CGP
Part II D.1 & 2)(9VAC25-870-54.G)
5
The SWPPP contains a signed copy of the registration statement?
V
(CGP Part II A. 1.a)
6
The SWPPP includes, upon receipt, a copy of the notice of coverage
letter and the CGP? (CGP Part II A.i.b & c)
The SWPPP includes a narrative description of the nature of the
7
construction activity, including the function of the project? (CGP Part 11
AAA)
Page 1 of 7
en
The SWPPP includes a legible site plan identifying all appropriate
8 measures and that includes the locations of support activities and the
onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7))
The SWPPP contains the name, phone number and qualifications of
9
"Qualified Personnel" conducting inspections? (CGP Part II A.6)
The SWPPP contains an approved erosion and sediment control plan?
10 (9VAC25-870-54.B)(CGP Part II.A.2)
The SWPPP contains an approved stormwater management plan or an
I'
existing construction site has a stormwater management plan that
11
ensures compliance with the water quality and quantity requirements?
(9VAC25-870-54.C)(CGP Part ILA.3) Technical Criteria ILB ❑ ILC ❑
i
The SWPPP contains an adequate pollution prevention plan? (9VAC25-
i
12 870-54.D)(CGP Part II.A.4)
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
13 concern, exceptional waters and the additional controls measures
j
applicable? (9VAC 25-870-54.E)(CGP Part IIA.S (a -b))
Delegation of Authority is provided and signed in accordance with Part III
14 K? (CGP Part II A.7)
1
The SWPPP is signed and dated in accordance with Part III K? (CGP Part
15 II A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES Yes No
N/A Reviewed. during inspection? []Yes []No
Comments/Description
Is the SWPPP being amended whenever there is a change in the design,
construction, operation, or maintenance that has a significant effect on the
16 discharge of pollutants to surface waters? (CGP Part II B(1)x9VAC25-870-
I 4.G)
i Has the SWPPP been amended if inspections or Investigations by the
operator's qualified personnel, or by local, state or federal officials find that
`
17 existing control measures are ineffective in minimizing pollutants in
discharges? (CGP Part II B(2))(9VAC25-870-54.G)
�ontractor(s)
j 18 that will implement and maintain each control measure are
entified? (CGP Part II B(3))(9VAC25-870-54.G)
lHave there been updates to the SWPPP when any modifications to its
implementation have occurred, including a record of dates when major
19 rading activities occur, construction activities temporarily or permanently
cease on a portion of the site or stabilization measures are initiated? (CGP
Part It B.4(a))(9VAC25-870-54.G)
20 'Is there documentation in the SWPPP of replaced or modified controls?
(CGP Part II B.4(b))(9VAC25-870-54.G)
21 Its the SWPPP updated to indicate areas that have reached final j
stabilization? (CGP Part 11 B.4(c))(9VAC25-870-54.G) %U
Is the SWPPP updated to indicate properties that are no longer under the
I 22 legal control of the operator and the dates on which the operator no longer II i I
had legal control over each property? (CGP Part 11 B.4(d))(9VAC25-870- I
4.G)
Does the SWPPP identify the date of any prohibited discharges, the
23 volume released, actions taken to minimize the impact of the release and
easures taken to prevent the recurrence of any prohibited discharge? i i r
(CGP Part Il B.4(e-f)) (9VAC25-870-54.G) I
24 mendments, modifications, or updates to the SWPPP are signed in
]accordance with Part III K? (CGP Part 11 B(5))(9VAC25-870-54.G) I
INSPECTIONS AND CORRECTIVE ACTIONS
! Inspections required by the SWPPP are conducted at the required
25 frequency, including a modified frequency for impaired water(s), approved
TMDL(s), and exceptional waters when applicable? (CGP Part II F (2))
(CGP Part II A.5.b.3)
Page 2of7
No IN/AI Reviewed during inspection? ❑Yes ❑No
Inspector Signatur
Page 4 of 7
Date:
Have all temporary control structures that are no longer needed been
46
removed and disturbed soil resulting from their removal permanently
stabilized? (9VAC 25-840-40.18) (CGP Part Il A.2(c)) (CGP II E(1-2))
(9VAC25-870-54.B)
Are properties and waterways downstream from development adequately
47
protected from erosion, sediment and damage in accordance with the
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25 -840-
40.19(a -n))
48
Permanent control measures included in the SWPPP are in place?
1C
(9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a))
r�
POLLUTION PREVENTION PLAN IMPLEMENTATION
Yes
No
WA
Reviewed during inspection? ❑Yes []No
Comments/Descrlptlon
Practices are in place to prevent and respond to leaks, spills, and other
releases including (i) procedures for expeditiously stopping, containing,
49
and cleaning up spills, leaks, and other releases; and (ii) procedures for
reporting leaks, spills, and other releases in accordance with Part II I G?
(CGP Part II A.4.e(1))(9VAC25-870-56)
Practices are in place to prevent the discharge of spilled and leaked fuels
50
and chemicals from vehicle fueling and maintenance activities? (CGP Part II
A.4.e(2)x9VAC25-870-56)
Practices are in place to prevent the discharge of soaps, solvents,
51
detergents, and wash water from construction materials, including the
clean-up of stucco, paint, form release oils, and curing compounds? (CGP
Part II AA.e(3))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from vehicle
52
and equipment washing, wheel wash water, and other types of washing?
(CGP Part II A.4.e(4))(9VAC25-870-56)
53
Concrete wash water is directed into a leak -proof container or leak -proof
settling basin? (CGP Part II A.4.e(5)K9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from
54
storage, handling, and disposal of construction products, materials, and
wastes? (CGP Part 11 A.4.e(6)X9VAC25870-6)
Practices are in place to prevent the discharge of fuels, oils, and other
55
petroleum products, hazardous or toxic wastes, and sanitary wastes?
(CGP Part II A.4.e(7)(9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
56
pollutant -generating activities not addressed above, when applicable?
(CGP Part 11 A.4.e(8))(9VAC25-870-56)
Inspector Signatur
Page 4 of 7
Date:
6
Inspection reports are completed and signed in accordance with CGP
Part II F (3-4)? (CGP Part 11 F (3-4))
27
Corrective actions are taken consistent with the requirements of the
CGP? (CGP Part II G(1-2))
ESC AND SWM PLAN IMPLEMENTATION
Yes
No
N/A
Reviewed during inspection? ❑Yes ❑No
Comments/Description
28
Have stream buffers and steep slopes been protected as shown on the
i
plan?
Sequencing of the project is implemented in accordance with the
29
approved erosion and sediment control plan and stormwater managemen
plans? (9VAC25-870-54.B and C)
Have all denuded areas requiring temporary or permanent stabilization
been stabilized, and have stabilization requirements for impaired waters,
30
approved TMDL(s), pollutants of concern and exceptional waters, when
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25
880-60) (CGP Part I F.1 (a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8))
(CGP II E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
(Y1cj�' +cc6
31
with sediment trapping measures? (9VAC 25-84040.2) (CGP Part II
`
A.2(c))(9VAC25-870-54.B)
0 PC
32
A permanent vegetative cover has been established that is uniform,
mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
(CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Have sediment trapping facilities been constructed as the first step in land
33
disturbance activities? (9VAC 25-840-40.4) (CGP Part II A.2(c)) (CGP 11
E(1-2)) (9VAC25-870-54.B)
Have earthen structures been stabilized immediately after installation?
34
(9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP li E(1-2)) (9VAC25-870-
54.13)
Are sediment traps and basins installed in accordance with MS-6 and the
35
approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II
A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-54.B)
Are finished cut and fill slopes adequately stabilized to prevent or correct
36
excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP II E(1-,
2)) (9VAC25-870-54.B)
'
Is concentrated runoff down cut or fill slopes contained in an adequate
37
permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part I I
I
A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-54.8)
I Is adequate drainage or other protection provided for water seeps?
%
38
(9VAC 25-84040.9) (CGP Part II A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-
54.13)
Do all operational storm sewer inlets have adequate inlet protection?
39
(9VAC 25-84040.10) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-
,
54.13)
i
Are stormwater conveyance channels adequately stabilized with channel
40
lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part 11 A.2(c))
(CGP II E(1-2)) (9VAC25-870-54.B)
ii Is in-stream construction conducted using measures to minimize channel
II A.2(c)) II E(1-2))
41
i damage? (9VAC 25-84040.12) (CGP Part (CGP
(9VAC25-870-54.B)
Are temporary stream crossings of non-erodible material installed where
i
I
42
applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP 11 E(1-2))
(9VAC25-870-54. B)
43
Is necessary restabilization of in-stream construction complete? (9VAC
25-84040.15) (CGP 11 E(1-2)) (9VAC25-870-54.13)
Are utility trench operations conducted and stabilized in accordance with
44 MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54.B)
Are soil and mud kept off paved or public roads to minimize the transport
45 ! of sediment? (9VAC 25-840-40.17) (CGP Part 11 A.2(c)) (CGP II E(1-2))
i (9VAC25-870-54.8)
Page 3 of 7
Notes:
CONSTRUCTION GENERAL PERMIT SITE INSPECTION REPORT
REQUEST FOR CORRECTIVE ACTION
Project Name: Permit Number (if applicable): Date:
` Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and
Sediment Control Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for
Discharges of Stormwater from Construction Activities (9VAC25-880).
Page 5 of 7
Regulatory
Checklist #
Citation/Legal
Occurrence
Observation/Recommended Corrective Action
requirement'
Observation:
Recommended Corrective Action.
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Ren mmended Corrective Action:
Observation:
Recommended Corrective Action:
` Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and
Sediment Control Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for
Discharges of Stormwater from Construction Activities (9VAC25-880).
Page 5 of 7
Recommended Corrective Action Deadline:
Targeted Re -inspection Date:
Comments: , .S
'O'C''C jc�'V fe-
j��+ rain eJ49
,jwr rQFf)•er
14
ruches
The recommended corrective action deadline date applies to all conditions noted on this report unless otherwise noted. If listed condition{s} currently
constitute non-compliancea /or cor ctive actions are not comp) ted by the deadline, other enforcement actions may be issued to the entity responsible for
ensuring compliance on th a ove p ect
Inspector Signature: `" Date:
� r
Page 6 of 7
COUNTY OF ALBEMARLE
Department of Community Development
VSMPIVESCP PERMIT SITE INSPECTION REPORT
Project Name: MUS
V So aS
roject/WPO Number:
No
Project Address:
Reviewed during re -inspection? [_]Yes ❑No
DEQ Permit Number (if
applicable).
VAR ��i � G.
Project Operator:
Operator Telephone #:
Comments/Description
Project Contact: can
^� 1�
Contact Telephone #:
Contact E -Mail:
Qualified Personnel (QP):
L/t_ R
Inspector:
Weather (WetIDry[Raln):
Disturbed Acreage:
A copy of the notice of coverage letter is posted conspicuously near the
Inspection Date & Time:
21—
—Single
Single-Family:
-Family: ❑ Yes
No
main entrance of the construction activity. (CGP Part I LC)
Stage of Construction: LJ
E] Building Construction
❑ !Notice of Termination
Pre -Construction Meeting
❑ Final Grading ❑
❑ Other:
LJ Initial Clearing & Grading LJ
Construction of SWM Facilities
Rough Grading
❑ Final Stabilization
Re -Inspection:
❑ Yes ❑No
Notice of the location of the SWPPP is posted near the site's entrance, if
Page 1 of 7
COVERAGE & POSTING REQUIREMENTS
yes
No
N/A
Reviewed during re -inspection? [_]Yes ❑No
Comments/Description
9
Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
(9VAC25-870-310)(Alb. Co. Code §17-300,17-302)
2
A copy of the notice of coverage letter is posted conspicuously near the
main entrance of the construction activity. (CGP Part I LC)
Notice of the location of the SWPPP is posted near the site's entrance, if
3
applicable, and information for public access is provided? (9VAC25-870-
54.GxCGP Part 11 D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS Yes
No
WA
Reviewed during re -inspection? ❑Yes ❑No
Comments/Descripdon
4
The SWPPP is on-site or made available during the inspection? (CGP
Part II D.1 & 2)(9VAC25-870-54.G)
5
The SWPPP contains a signed copy of the registration statement?
(CGP Part II A.1.a)
6
The SWPPP includes, upon receipt, a copy of the notice of coverage
l
letter and the CGP? (CGP Part 11 A.1.b & c)
b
The SWPPP includes a narrative description of the nature of the
7
construction activity, including the function of the project? (CGP Part 11
A.1.d)
Page 1 of 7
Page 2 of 7
The SWPPP includes a legible site plan identifying all appropriate
that includes the locations of support activities and the
,
8
measures and
onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7))
The SWPPP contains the name, phone number and qualifications of
9
"Qualified Personnel" conducting inspections? (CGP Part II A.6)
The SWPPP contains an approved erosion and sediment control plan?
10
(9VAC25-870-54.B)(CGP Part II.A.2)
The SWPPP contains an approved stormwater management plan or an I
11
existing construction site has a stormwater management plan that
ensures compliance with the water quality and quantity requirements? I`
(9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria ILB ❑ ILC ❑
12
The SWPPP contains an adequate pollution prevention plan? (9VAC25-
870-54.D)(CGP Part II.A.4)
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
13
concern, exceptional waters and the additional controls measures
i
applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b))
Delegation of Authority is provided and signed in accordance with Part III
14
K? (CGP Part II A.7) IV].
The SWPPP is signed and dated in accordance with Part III K? (CGP Pa !�° ,
?5
If A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES Yes
No N/A Reviewed during inspection? ❑Yes []No
Comments/Descripffon
Is the SWPPP being amended whenever there is a change in the design, I,
r
16
construction, operation, or maintenance that has a significant effect on the ;
ldischarge of pollutants to surface waters? (CGP Part 11 B(1))(9VAC25-870-1
j
4.13)
Has the SWPPP been amended if inspections or investigations by the
j
17
operator's qualified personnel, or by local, state or federal officials find that
existing control measures are ineffective in minimizing pollutants in
discharges? (CGP Part II B(2))(9VAC25-870-54.G)
18
Contractors) that will implement and maintain each control measure are
identified? (CGP Part II B(3))(9VAC25-870-54.G)
i
Have there been updates to the SWPPP when any modifications to itsr
implementation have occurred, including a record of dates when major
19
rading activities occur, construction activities temporarily or permanently
rcease on a portion of the site or stabilization measures are initiated? (CGP
Part II B.4(a))(9VAC25-870-54.G)
i
;Is there documentation in the SWPPP of replaced or modified controls?
20
CGP Part 11 13.4(b))(9VAC25-870-54.13)
21
Is the SWPPP updated to indicate areas that have reached final
J .,
tabilization? (CGP Part it B.4(c))(9VAC25-870-54.G)
ils the SWPPP updated to indicate properties that are no longer under the
22
l control of the operator and the dates on which the operator no longer
i
P legal control over each property? (CGP Part 11 B.4(d))(9VA025-870-
4.G) I
Does the SWPPP identify the date of any prohibited discharges, the
23
olume released, actions taken to minimize the impact of the release and
easures taken to prevent the recurrence of any prohibited discharge?
CGP Part Ii B.4{e-f)) (9VAC25-870-54.G)
24
mendments, modifications, or updates to the SWPPP are signed in `J
i
accordance with Part III K? (CGP Part II B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS Yes
No N/A Reviewed during inspection? []Yes []No
Comments/Descripdon
Inspections required by the SWPPP are conducted at the required
frequency, including a modified frequency for impaired water(s), approved
25
TMDL(s), and exceptional waters when applicable? (CGP Part II F (2))
(CGP Part 11 A.5.b.3)
Page 2 of 7
' 26 ..n reports are completed and signed in accordance with CGP
Part II F (3-4)? (CGP Part II F (3-4))
27
Corrective actions are taken consistent with the requirements of the
CGP? (CGP Part II G(1-2))
ESC AND SWM PLAN IMPLEMENTATION
Yes
No
WA
Reviewed during inspection? ❑Yes []No
Comments/Desci 1ptlon
28
Have stream buffers and steep slopes been protected as shown on the
plan?
Sequencing of the project is implemented in accordance with the
29
approved erosion and sediment control plan and stormwater managemen
plans? (9VAC25-870-54.B and C)
Have all denuded areas requiring temporary or permanent stabilization
been stabilized, and have stabilization requirements for impaired waters,
30
approved TMDL(s), pollutants of concern and exceptional waters, when
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25
880-60) (CGP Part I F.1 (a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8))
(CGP II E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
31
with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part I I
A.2(c)) (9VAC25-870-54.B)
32
A permanent vegetative cover has been established that is uniform,
mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
(CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Have sediment trapping facilities been constructed as the first step in land
33
disturbance activities? (9VAC 25-840-40.4) (CGP Part II A.2(c)) (CGP II
E(1-2)) (9VAC25-870-54.B)
Have earthen structures been stabilized immediately after installation?
34
(9VAC 25-840-40.5) (CGP Part It A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Are sediment traps and basins installed in accordance with MS -6 and the
35
approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II
A.2(c)) (CGP II E(1-2)) (9VAC25-870-4.B)
Are finished cut and fill slopes adequately stabilized to prevent or correct
36
excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP II E(1-
2)) (9VAC25-870-54.B)
Is concentrated runoff down cut or fill slopes contained in an adequate
37
permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part I I
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Is adequate drainage or other protection provided for water seeps?
38
(9VAC 25-840-40.9) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Do all operational storm sewer inlets have adequate inlet protection?
39
(9VAC 25-840-40.10) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Are stormwater conveyance channels adequately stabilized with channel
40
lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part 11 A.2(c))
(CGP II E(1-2)) (9VAC25-870-54.B)
Is in -stream construction conducted using measures to minimize channel
41
damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Are temporary stream crossings of non -erodible material installed where
42
applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP 11 E(1-2))
�G
(9VAC25-870-54.B)
43
Is necessary restabilization of in -stream construction complete? (9VAC
25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.B)
Are utility trench operations conducted and stabilized in accordance with
44
MS -16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Are soil and mud kept off paved or public roads to minimize the transport
45
of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54.B)
Page 3of7
Inspector Signature: 61Z - Date:
Page 4 of 7
Have all temporary control structures that are no longer needed been
46
removed and disturbed soil resulting from their removal permanently
stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2))
x
(9VAC25-870-54.B)
Are properties and waterways downstream from development adequately
47
protected from erosion, sediment and damage in accordance with the
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25 -840-
40.19(a -n))
i
48
Permanent control measures included in the SWPPP are in place?
(9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1 (a))
POLLUTION PREVENTION PLAN IMPLEMENTATION
Yes
No
N/A
Reviewed during inspection? ❑Yes []No
Comments/Description
Practices are in place to prevent and respond to leaks, spills, and other
releases including (i) procedures for expeditiously stopping, containing,
49
and cleaning up spills, leaks, and other releases; and (ii) procedures for
1
reporting leaks, spills, and other releases in accordance with Part III G?
i
(CGP Part II A.4.e(1))(9VAC25-870-56)
Practices are in place to prevent the discharge of spilled and leaked fuels
50
I and chemicals from vehicle fueling and maintenance activities? (CGP Part I I
A.4. e(2))(9 VAC2 5-870-56 )
Practices are in place to prevent the discharge of soaps, solvents,
51
detergents, and wash water from construction materials, including the
clean-up of stucco, paint, form release oils, and curing compounds? (CGP
Part 11 A.4.e(3))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from vehicle
52
and equipment washing, wheel wash water, and other types of washing?
(CGP Part II A.4.e(4))(9VAC25-870-56)
I
53
Concrete wash water is directed into a leak -proof container or leak -proof
settling basin? (CGP Part II A.4.e(5)X9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from
I
54
i storage, handling, and disposal of construction products, materials, and
j
wastes? (CGP Part 11 A.4.e(6))(9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
I 55
petroleum products, hazardous or toxic wastes, and sanitary wastes?
I
I
?
I (CGP Part II A.4.e(7)(9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
56
pollutant -generating activities not addressed above, when applicable?
(CGP Part 11 A.4.e(8))(9VAC25-870-56)
Inspector Signature: 61Z - Date:
Page 4 of 7
Recommended Corrective Action Deadline:
Tarneted Re -inspection Date:
Comments: 5uU M u u4o I_;HT 60 e t"e tl i— 1 ` 0 r r
he's
The recommended corrective action deadline date applies to all Conditions noted on this report unless otherwise noted. If listed condition(s) currently
constitute non-compliance an r come iye actions are not mplete y the deadline, other enforcement actions maybe issued to the entity responsible for
ensuring compliance on the Pve prof ct',
f
Inspector Signature: V Date:
Page 6of7
Notes:
CONSTRUCTION GENERAL PERMIT SITE INSPECTION REPORT
REQUEST FOR CORRECTIVE ACTION
Project Name: Permit Number (if applicable): Date:
1 Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and
Sediment Control Regulations (9VAC25-840), the Virginia Stonnwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for
Discharges of Stormwater from Construction Activities (9VAC25-880).
Page 5 of 7
Regulatory
Occurrence
ObservatianlRecommen ded Corrective Action
Checklist #
Citation/Legal
requirement'
I
Observation:
Recommended Corrective Action: R
Observation:
I
i
I
I
�
Recommended Corrective Action: i
i
Observation:
i
I
Recommended Corrective Action:
Observation: `
Recommended Corrective Action:
Observation:
�(
Recommended Corrective Action:
1 Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and
Sediment Control Regulations (9VAC25-840), the Virginia Stonnwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for
Discharges of Stormwater from Construction Activities (9VAC25-880).
Page 5 of 7