Loading...
HomeMy WebLinkAboutSDP201600045 Correspondence Final Site Plan and Comps. 2017-06-13 some Christopher Perez To: Megan Brown Subject: SDP201600045 Briarwood Recreational Area -final site plan Megan, SDP201600045 Briarwood Recreational Area- fmal site plan The above ref plan has been approved/signed. I am providing you the two (2) zoning copies and the hard copy file. As you know the applicant would like to bond this site plan. Please begin your work formulating the bond amounts and work that out with Nena. thanks Christopher P.Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 1 Christopher Perez From: Christopher Perez Sent: Wednesday, June 07, 2017 10:11 AM To: Margaret Maliszewski; Matthew Wentland; 'Moore, Adam PE (VDOT)'; 'Alexander Morrison'; Robbie Gilmer; Keith Huckstep; Michael Dellinger; Frank Pohl Cc: Judy Martin - BC/ZS Subject: FINAL SITE PLAN READY FOR APPROVAL- SDP201600045 Briarwood Recreational Area -final site plan All, SDP201600045 Briarwood Recreational Area- final site plan I have received tentative approvals from each of you on the above ref plan. It is now ready for County approval. Please come in within the next 7 days and sign/date the plan. The plans are located in the signature cubbyhole adjacent to Conference Room B. Thanks Christopher P.Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 fvf 6) 1 1 a * Christopher Perez From: Christopher Perez Sent: Tuesday,June 06, 2017 10:27 AM To: 'Scott Collins' Cc: Adam Long;Jenni Pack Subject: RE: SDP2016-45 Briarwood Recreational Area - final site plan Attachments: template-sig panel.doc Scott, RE: SDP2016-45 Briarwood Recreational Area-Final Site Plan I am ready to approve the above ref plan; however,when I placed it downstairs for SRC review signatures I noticed we are missing a signature block for all SRC reviewers. Please add a signature block for all SRC reviewers to the cover sheet,print off 5 copies of that single sheet,have Scott sign his seal again and I'll slip sheet it on all the copies for you. I'm really sorry I didn't catch that when I had yall come back in to get Wendalls signature on the conservation checklist. Christopher P.Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From:Scott Collins [mailto:scott@collins-engineering.com] Sent: Monday,June 05, 2017 11:52 AM To:Christopher Perez<cperez@albemarle.org>; Nena Harrell<ulcwww@embarqmail.com> Cc:Adam Long<adam@collins-engineering.com>;Jenni Pack<jenni@collins-engineering.com> Subject: RE:SDP2016-45 Briarwood Recreational Area-final site plan Thanks Chris,we will pick them up shortly, have them signed, and then drop them back off this afternoon. From:Christopher Perez [mailto:cperez@albemarle.org] Sent: Monday,June 5, 2017 11:46 AM To:Scott Collins<scottPcollins-engineering.com>; Nena Harrell<ulcwww@embargmail.com> Cc:Adam Long<adam@collins-engineering.com> Subject: RE:SDP2016-45 Briarwood Recreational Area -final site plan Scott, RE: SDP2016-45 Briarwood Recreational Area-final site plan I received the above ref final site plan and confirm that all items discussed have been completed; however,I noticed that the Conservation Checklist on the last sheet(landscape sheet)is not signed and dated by the owners.This needs to be signed prior to approval of the site plan. I'll leave all 5 copies downstairs for you to have the owner sign and date. Once that is completed I will send out the notice to the reviewers for signature. thanks Christopher P.Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 1 41100 From:Scott Collins[mailto:scott@collins-engineering.com] Sent:Thursday,June 01, 2017 3:27 PM To:Christopher Perez<cperez@albemarle.org>; Nena Harrell<ulcwww@embargmail.com> Cc: Frank Pohl <fpohl@albemarle.org>; Ana Kilmer<akilmer@albemarle.org>; Adam Long<adam@collins- engineering.com>;Jenni Pack<jenni@collins-engineering.com> Subject: RE: SDP2016-45 Briarwood Recreational Area-final site plan Thank you Chris! Scott From:Christopher Perez [mailto:cperez@albemarle.org] Sent:Thursday,June 01,2017 3:12 PM To:Scott Collins; Nena Harrell Cc: Frank Pohl; Ana Kilmer;Adam Long;Jenni Pack Subject: RE:SDP2016-45 Briarwood Recreational Area-final site plan Scott, RE:SDP2016-45 Briarwood Recreational Area-final site plan Yes,that sounds good. Once I receive the five copies of the plans I'll do a quick check to assure it has all the correct info and then send out the request for all SRC reviewers to come in and sign the plans.As you know,they are allotted 10 days to come in and sign. Once it's approved I'll let you know.Thanks From:Scott Collins [mailto:scott@collins-engineering.com] Sent:Thursday,June 01,2017 3:08 PM To: Nena Harrell<ulcwww@embargmail.com>; Christopher Perez<cperez@albemarle.org> Cc: Frank Pohl<fpohl@albemarle.org>; Ana Kilmer<akilmer@albemarle.org>;Adam Long<adam@collins- engineering.com>;Jenni Pack<jenni@collins-engineering.com> Subject: RE:SDP2016-45 Briarwood Recreational Area -final site plan Chris- We have updated the final site plan by adding in the DB. PG information on the plan, as requested and we have fixed the property line/ r/w issue to align with the updated recorded plat. We will submit 5 copies of the final site plan tomorrow morning for final approval. Thanks Chris. Scott From: Nena Harrell [mailto:ulcwww@embarqmail.com] Sent:Thursday,June 01,2017 2:49 PM To: 'Christopher Perez';Scott Collins Cc: 'Frank Pohl'; 'Ana Kilmer' Subject: RE:SDP2016-45 Briarwood Recreational Area-final site plan Chris/Scott, Please see my comments in yellow below. 2 *ore Nisr, ' Nena Harrell United Land Corporation Vice President PO Box 5548 Charlottesville,VA 22905 434-975-3334 Fax 434-975-0267 From:Christopher Perez [mailto:cperez@albemarle.org] Sent:Thursday,June 1, 2017 11:14 AM To: Nena Harrell<ulcwww@embarqmail.com>; Scott Collins<scott@collins-engineering.com> Cc: Frank Pohl<fpohl@albemarle.org>;Ana Kilmer<akilmer@albemarle.org> Subject:SDP2016-45 Briarwood Recreational Area -final site plan Nena/Scott, SUB2016-185 -Briarwood Phase 4 (portion) and phase 6 (portion) - final plat, it is not ready for approval yet. Comments on that plat went out on Dec 16, 2016. The revised 1-4-2017 date you referenced has not been submitted nor reviewed. Whenever you are ready please resubmit the plat and a comment response letter and we will conduct a review on it. I HAVE NOTED ON CALENDAR THAT I SUBMITTED PLAT REVISED 1/4/17 TO COUNTY ON /12/17. COMMENTS FROM 12/16 WERE ADDRESSED. SINCE IT HAS NOT BEEN REVIEWED HRIS KEAN IS UPDATING WITH NEW OPEN SPACE INFO PER REC PLAT CHANGES. IT WL BE DELIVERED EARLY TOMORROW. HOW MANY COPIES DO YOU NEED? WHAT IS THE TIMEFRAME FOR REVIEW? One of the largest item remaining is the approval and the bonding of the final site plan for the primary rec area (SDP2016-45). Thus what we need to be focus on are the next steps in the process to approve the final site plan. I emailed you a time line back in Jan (email attached and excerpt provided below, red texts are recent status updates and guidance for what Scott Collins needs to do/update the site plan). See below: The primary recreational area can be bonded once the final site plan is signed/approved by the County. Not yet approved nor bonded. t HAVE WPO BOND AMOUNT AWAITING EQUIPMENT BOND AMOUNT FROM LISA GREEN WHO SAID WOULD ONLY TAKE HER COUPLE OF HOURS. Currently there are numerous large items still outstanding prior to final site plan approval. They are: (1) The easement plat into the site across Ray Beard's property is not yet approved/recorded yet this iJ needed prior to final site plan property. Completed/approved/recorded. Recordation information of this action needs to be put on the final site plan for the primary rec area. DB 4890 PGS 702-705 (2) The road plan for phase 4 which includes the portion of St/. Ives fronting the rec area is not approved/bonded yet - this road plan needs to be finished up I'be it is needed to provide access to the recreational area. This road plan needs to be bonded. Ana Kilmer will not return from vacation till tomorrow. Not sure where this project is at in her que to finalize/post the bonds. Please work with her on this item when she comes back. I HAVE BOND AMOUNT AND ANA HAS FORMATTED BONDS AND IS EXPECTING ME TOMORROW MORNING WHEN SHE RETURNS (3)Thesien plat for-the recreational area (-s. ..• _ . - - . - .. - - approved this matters be this plat also records required SWM easements required for the final site plan. This plat also dedicated the land to 3 410 parcel. Completed/approved/recorded 6-1-17. Recordation information of this action needs to be put on the final site plan for the primary rec area. Also, assure Scott updates the parcel boundary lines as the version of the final site plan I have incorrectly depicts the stub that Wendell wanted to subdivide into a lot, which was later determined to be previously dedicated R/W and not part of Briarwood. WILL PROVIDE RECORDATION INFO SHORTLY (4) WP02016-50 is not yet approved and requires the two plats mentioned above and bonding prior to it being approved. This WPO plan for the rec area needs to be bonded. Ana Kilmer will not return from vacation till tomorrow. Not sure where this project is at in her que to finalize/post the bonds. Please work with her when she comes back. ANA HAS FORMATTED BOND AND IS EXPECTING ME TOMORROW. Christopher P.Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 Original Message From: Nena H [mailto:ulcwww@embarqmail.com] Sent:Thursday,June 01, 2017 9:43 AM To:Christopher Perez<cperez@albemarle.org> Subject: Re: Rec play I believe the only subdivision plat you are reviewing is Briarwood phase 4?? Nena Harrell Sent from my iPhone >On Jun 1, 2017, at 8:55 AM, Christopher Perez<cperez@albemarle.org>wrote: >What subdivision plat are you referring to? > Original Message > From: Nena H [mailto:ulcwww@embargmail.com] >Sent:Thursday,June 01, 2017 8:51 AM >To: Christopher Perez<cperez@albemarle.org> >Subject: Re: Rec play >Ok thanks. I am planning to post bonds tomorrow. Do you need anything else to sign subdivision plat? > Nena Harrell >Sent from my iPhone >>On Jun 1, 2017,at 8:44 AM, Christopher Perez<cperez@albemarle.org>wrote: » It's ready,come by whenever and record both the plat and the legal doc. » Original Message 4 Soo N4.00 » From: Nena H [mailto:ulcwww@embargmail.com] >>Sent:Thursday,June 01,2017 8:34 AM >>To: Christopher Perez<cperez@albemarle.org> »Subject: Rec play »Chris, can you please advise when I can pick up deed & plat? »Thanks, >> Nena Harrell »Sent from my iPhone 5 two Christopher Perez From: Matthew Wentland Sent: Tuesday, June 13, 2017 9:02 AM To: Christopher Perez Subject: FW:WP02016-50 Briarwood Rec Area Attachments: WP0201600050 Briarwood Rec Area approval rev2 06-13-17.pdf From: Matthew Wentland Sent:Tuesday,June 13, 2017 8:51 AM To:Scott Collins<scott@collins-engineering.com> Cc: Nena Harrell <ulcwww@embargmail.com> Subject:WP02016-50 Briarwood Rec Area Scott, Now that the associated plats have been approved,the WPO plan for the Briarwood Rec Area has been approved. Thank you, Matt Wentland, P.E. Civil Engineer II 1 '`✓ Christopher Perez From: Christopher Perez Sent: Monday, June 05, 2017 9:54 AM To: Frank Pohl Subject: RE:WPO-2016-00050 Briarwood Recreation Area The DB info is: DB 4916 PG 37 From:Christopher Perez Sent: Monday,June 05, 2017 8:54 AM To:Ana Kilmer<akilmer@albemarle.org>; Nena Harrell<ulcwww@embarqmail.com> Cc: Frank Pohl<fpohl@albemarle.org>; Matthew Wentland <mwentland@albemarle.org>;Stephanie Mallory <smallory@albemarle.org>;Jonney Otto<jotto@albemarle.org>; Kenny Thacker<KTHACKER@albemarle.org> Subject: RE:WPO-2016-00050 Briarwood Recreation Area Ana, SUB2016-220 Briarwood Primary Recreation Area & Maintenance—Easement Plat was approved on 6-1- 17. I have the file in my office if you would like to see it. Attached is a scanned copy of the plat. From:Ana Kilmer Sent: Friday,June 02, 2017 4:45 PM To: Nena Harrell<ulcwww@embarqmail.com> Cc: Frank Pohl<fpohl@albemarle.org>; Matthew Wentl. •: <mwentland@albemarle.org>; Christopher Perez <cperez@albemarle.org>; Stephanie Mallory<small..i • albemarle.or:>;Jonney Otto<jotto@albemarle.org>; Kenny Thacker<KTHACKER@albemarle.org> Subject: FW: WPO-2016-00050 Briarwood Re eation Area k.. �I b,i The$131,170 water protection perfor :nce bond has been pos and approved (erosion$96,720;stormwater management and water quality$34,4 0). Stormwater agreement was recorded 5/24/2017. Frank needs to answer the following questions: Frank: Has the easement and plat{for stormwater been approved by the county and recorded? Do this project is part of the existing Briarwood DEQ Permit or does it need its own? Once Frank responds to my questions, I will send you the pre-construction meeting information. Thank you Ana D. Kilmer Management Analyst Community Development Department 401 McIntire Road Charlottesville,VA 22902 434-296-5832 akilmer@albemarle.org 'toe iwoo Christopher Perez • From: Scott Collins <scott@collins-engineering.com> Sent: Friday, September 30, 2016 9:33 AM To: Amelia McCulley; Christopher Perez Cc: Nena Harrell Subject: FW: Briarwood Access easement across Mr. Beard's property Amelia,Chris- Thank you again for your flexibility on this analysis. Below is VDOT's acceptance of the (2) Options. Therefore, based on your acceptance of Option 2, we will move forward with updating the plan for Option 2 design. Thank you. Scott Collins From: Moore,Adam PE (VDOT) [mailto:Adam.Moore@vdot.virginia.gov] Sent: Friday, September 30, 2016 9:17 AM To:Scott Collins Subject: RE: Briarwood Access easement across Mr. Beard's property Scott, I am ok with either option. Like you said,there is likely so little traffic at the end of this road I don't see much reason for concern. Adam J. Moore,P.E. I Assistant Resident Engineer/Area Land Use Engineer VDOT - Charlottesville Residency 701 V'DOI'Way I Charlottesville I V'.A main 434.422.9782 From: Scott Collins [mailto:scott@collins-engineering.com] Sent: Thursday, September 29, 2016 11:40 AM To: Moore, Adam PE (VDOT) Subject: FW: Briarwood Access easement across Mr. Beard's property Adam- Can I get you to take a look at something for us. Attached is a sketch of the entrance road into the Briarwood recreational area. This will be a private access with a VDOT entrance from St. Ives roadway. We need access across Mr. Beard's property, and he has agreed to allow access across the property under option 1 or option 2, but not as we currently have it designed which is aligned with the intersection. From the email below, the county will allow option#2, but not option#1. My question is whether VDOT might allow Option 1 for this private access onto St. Ives Road. Keep in mind the only traffic past this access point on St. Ives is the ACSA pump station and (2) proposed lots just to the west of the access to the recreational area. I mention that, because there will not be much (hardly any) traffic going straight along St. Ives if a car from Sunset is trying to make the offset turn into the recreational park. The majority, if not almost all, the traffic that a car making this turn might see will be turning right onto Sunset Avenue to go to the lots up in Briarwood. I am available to discuss this further by phone or in a meeting. Thank you Adam. Scott 1 From:Amelia McCulley[mailto:AM000LLE@albemarle.org] Sent:Tuesday,September 27,2016 11:32 AM To:Scott Collins; Christopher Perez Cc: Nena Harrell Subject: RE: Briarwood Access easement across Mr. Beard's property Scott and Nena, Chris and I just sat down and went over the proposal. He knows the history and helped fill me in on what,when and why. Anyway, Chris and I agree that option#2 is possible (subject to VDOT approval of the offset)without a rezoning amendment. Option#1 is too significant of a shift and change to meet the proffer language requiring "alignment with the proposed road." So if you can get something in writing from VDOT approving option#2 so we know it won't jeopardize the public road acceptance,you're good to go with option#2. I hope this helps. From:Scott Collins [mailto:scott@collins-engineering.com] Sent: Monday,September 26, 2016 11:47 AM To:Amelia McCulley<AMCCULLE@albemarle.org>; Christopher Perez<cperez@albemarle.org> Cc: Nena Harrell<ulcwww@embargmail.com> Subject: RE: Briarwood Access easement across Mr. Beard's property Amelia- Thanks. I would hope that this can be handled in an exploratory meeting, and that we are not looking at rezonings or rezoning amendments. Let's go with next Monday for an exploratory meeting. Thx. Scot From:Amelia McCulley [mailto:AMCCULLE@albemarle.org] Sent: Monday,September 26,2016 11:18 AM To:Scott Collins; Christopher Perez Cc: Nena Harrell Subject: RE: Briarwood Access easement across Mr. Beard's property Hi there Scott and all, This is probably best set as a preapplication conference. It's my understanding that this change requires at least one and perhaps two different project zoning amendments. Let us know when is a good date for a preapp. If you're proposing a mandatory preapp, please go through Francis. If an exploratory, either Chris or I can handle it. From:Scott Collins [mailto:scott@collins-engineering.com] Sent:Wednesday,September 21, 2016 11:51 AM To:Christopher Perez<cperez@albemarle.org>;Amelia McCulley<AMCCULLE@albemarle.org> Cc: Nena Harrell<ulcwww@embargmail.com> Subject: Briarwood Access easement across Mr. Beard's property Chris,Amelia- We met again with Mr. Beard yesterday in regards to obtaining the access easement across his property. Mr. Beard's main issue is that with aligning the access into the Briarwood recreational area with Sunset Drive, it creates an issue with his rezoning. His rezoning plan shows(2)sets of duplex houses with the access easement in the middle (Option 2 in the 2 r 7 attached exhibit reflects this situation). We do not have an issue with moving the access road to this location, but the 27'offset might be an issue with VDOT. Another option might be to move the access road to the east at the end of Mr. Beard's property(as shown as Option 1). This way, he can still build the (2)sets of duplex homes and grant the 50' access easement. In addition,the spacing would be far enough to meet VDOT requirements. Would you both be available for a meeting to discuss these (2)options and see if we can work out something that allows the access across Mr. Beard's property while still allowing him to construct the (2)duplex units. Thank you. Scott Collins 3