Loading...
HomeMy WebLinkAboutWPO201800008 Bond Estimates 2018-06-11Project Name: OTV-Block 7 Erosion & Sediment Control Bond Estimate Plan # WPO201800008 Item No.Unit Unit Cost Cost (installed) Erosion stablization (PS, TS)2.0 acres $5,000.00 $10,000.00 silt fence (SF)1250.0 ft $8.00 $10,000.00 safety fence (SAF)0.0 ft $9.50 $0.00 diversion (DD, FD, RWD)500 ft $13.00 $6,500.00 temporary slope drain (TSD) pipe length 0 ft pipe diameter 0 in $0.00 $0.00 Earthwork (FILL volume) 1500.0 cy (CUT volume) 1000.0 cy length of spillway 0 ft (TOTAL CY estimate) 500 cy $9.00 $4,500.00 width of spillway 0 ft (spillway stone tons) 0 tons $50.00 $0.00 Structures riser height 0 ft riser diameter 0 in (riser unit price) $0.00 $0.00 barrel length 0 ft base plate or fdn 0 $200.00 $0 barrel diameter 0 in (barrel unit price) $0.00 $0.00 barrel collars 0 $200.00 $0 baffle length 0 ft $50.00 $0 Erosion Measures silt fence inlet protection (IP)0 $100.00 $0.00 stone inlet protection (IP)8 $200.00 $1,600.00 all outlet protection (OP) length 0 ft width 0 ft 1 $0.00 $0.00 channel (SCC, matted) length 250 ft width 4 ft 1 $1,300.00 check dam depth in channel 3 ft channel width 4 ft 2 $270.00 $540.00 wash rack 1 $2,000.00 $2,000.00 paved construction entrance 1 $3,500.00 $3,500.00 rip-rap, placed depth 2 ft length 10.0 ft width 10.0 (tons) 11.5 tons $60.00 $690.00 survey and layout (price per 0.1 macres 2.0 traps and basins 1 $1,500.00 mobilization $500.00 stream crossing (computed independently)$0.00 cost sum $42,630.00 $42,630.00 contingency $4,263.00 $4,263.00 Total $46,900 $46,900 THE FOLLOWING BOND ESTIMATE IS BASED ON APPROVED ESC PLAN DATED JAN 12, 2018 LAST REVISED MAY 17, 2018 PROVIDED BY ROUDABUSH GALE & ASSOCIATES, INC. REFER BELOW FOR ADDITIONAL COMMENTS (BLUE) ON THE PROCESS OF CALCULATIONS. EARTH VOLUME CALCULATIONS OBTAINED VIA CARLSON CIVIL SUITE 2018 TOTAL CUBIC YARDS OBTAINED FROM DIFFERENCE IN DIRT VOLUME (CUT/FILL) MOBILIZATION UNIT PRICE BASED ON A.G. DILLARD PERFORMING CONTINUOUS WORK IN OLD TRAIL VILLAGE SINCE 2012 Total ESC Bond Estimate $46,900 A\TMPROJ\8053-OLD TRAIL\BLOCK 7\Phase 2\Final Plan\Doc\Copy2 of RGA ESC_Bond_Est_OTV-Block 7.xls 6/10/2018