Loading...
HomeMy WebLinkAboutSDP201800014 Review Comments Initial Site Plan 2018-05-24 28 Blackwell Park Lane, Suite 201 Warrenton, VA 20186 PHONE 540.349.4500 CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS WWW.BOHLERENGINEERING.COM May 24, 2018 Via Federal Express County of Albemarle Department of Community Development 401 McIntire Road, North Wing Charlottesville, VA 22902-4596 (434) 296-5832 Attn: Cameron Langille Re: SDP2018000014 Initial Site Plan (Sec 1 Block 4B) 1st Review Response Brookhill Development Route 29 (Seminole Trail Road) and State Route 643 (Polo Grounds Road) Charlottesville, VA 22902 Albemarle County BE # V152000 Dear Mr. Langille: Bohler Engineering is pleased to submit on behalf of Riverbend Development, the 2nd Submission Initial Site Plan for the Brookhill Development project in Charlottesville, Virginia. The following is our comment response letter addressing comments received from your department dated May 8, 2018. Each comment is addressed and responded to as follows: Comment 1: [32.4.2.1 (f)] The mailing notification fee of $215 has not been paid. The fee must be paid prior to Friday, May 25th in order for the initial site plan to be approved. Response 1: The notification fee will be paid with this submission. Comment 2: [32.7.9] Please see ARB comment #1 regarding additional plantings required within the landscape buffer along Route 29. As stated on the ZMA201500007 Application Plan, the area outside of the existing tree limits within the 100’ Route 29 buffer shall be replanted in accordance with the Places29 master Plan Forested Buffer Requirements. ARB comments include a hyperlink to the Places29 Master Plan document, please refer to page 7-15 and Figure 7.16 for additional information on the Forested Buffer Frontage design standards. The ARB comment must be addressed prior to initial site plan approval. Response 2: The area within the 100’ Route 20 buffer has been revised as requested. See Sheets C-701 – C-702. Comment 3: [32.5.2 (a)] The “phasing plan” provided on Sheet C-105 has a label stating it is the approved application plan from the Brookhill rezoning, but it is not the correct application plan that was approved. Please replace with the stamped and approved application plan (November 9, 2016) and re-name Sheet C-105 to “Approved Application Plan ZMA2015-07.” Response 3: The Application Plan has been replaced and revised as requested. See Sheet C-105. Cameron Langille Brookhill Development Section 1, Block 4B – Initial Site Plan 1st Review Response May 24, 2018 Page 2 of 2 CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS WWW.BOHLERENGINEERING.COM Should you have any questions regarding this project or require additional information, please do not hesitate to contact me at (540) 349-4500. Sincerely, Bohler Engineering VA, LLC Ryan Yauger, P.E. RY/jb/bb H:\15\V152000\Administrative\Letters\Initial Site Plan (Sec 1 Block 4B) Letters\180524 Initial Site Plan (Sec 1 Block 4B) 1st Review CRL.doc