Loading...
HomeMy WebLinkAboutSP198700051 Action Letter e e COUNTY OF ALBEMARLE Dept. of Planning & Community Development 401 McIntire Road Charlottesville, Virginia 22901-4596 (804) 296-5823 August 7, 1987 Woodbriar Associates c/o Wendell Wood P. O. Box 5548 Charlottesville,VA 22905 RE: SP-87-51 Woodbriar Associates Dear Mr. Wood: The Albemarle County Board of Supervisors, at its meeting on August 5, 1987, unanimously approved the above-noted request to allow installation of a six inch diameter sewer line under the North Fork of the Rivanna River. Property located on the west side of Rt. 29N, adjacent to bridge over north fork of the Rivanna River. Tax Map 32, Parcel 19. Rivanna Magisterial District. Please note that this approval is subject to the following conditions: 1. Construction together with all restoration and stabilization measures to be completed no later than august 31, 1987; provided that completion date may be extended not more than thirty (30) days by the County Engineer in light of the current status of the project and the weather; I 2. The Zoning Administrator shall issue a development permit for this project as required by Section 30.3.3.2 of the Zoning Ordinance. No such permit shall be issued until all conditions of this special use permit have been met and the County Engineer shall have certified that in his opinion, the project can be expected to be completed prior to termination dated noted in condition #1; - e 3. Approval of appropriate local, state, and federal agencies and presentation of evidence of such approvals to the Zoning Administrator; 4. County Engineer approval in accordance with the requirements of 30.3 Flood Hazard Overlay District with particular attention to approval of access and river crossing plans; 5. Only those areas necessary for the conduct of this project shall be disturbed. Activity shall be conducted in such a manner so that equipment shall not travel over, be parked on, or otherwise encroach on tree root systems outside of approved project limits; 6. All disturbed and denuded areas shall be stabilized as required by the County Engineer. County engineer approval of restorative and stabilization measures prior to issuance of development permit. Such approval shall among other things specify that all excess construction material and debris shall be removed from the floodplain and disposed of properly; 7. Compliance with the Soil Erosion and Sedimentation Control Ordinance; 8. Posting of warning signs upstream from the site to advise canoeists and other users of construction activity and temporary obstructions; 9. Cash bonding as a mechanism by which the Zoning Administrator may cause immediate compliance with this special use permit and all other County regulations. The County Engineer shall make periodic inspections of the site to insure compliance with conditions imposed herein. The County Engineer may require such corrective measures as deemed necessary to insure compliance with these conditions; 10. Presentation to Zoning Administrator of proof that all easements necessary for construction and maintenance of entire length of sewer line have been obtained. If you should have any questions or comments regarding the above noted action, please do not hesitate to contact me. Sincerely, ~~ Ronald S. Keeler Chief of Planning RSK/jcw cc: Charles Burgess, Zoning Administrator Mike Armm, County Engineer