HomeMy WebLinkAboutWPO201700079 Plan - Stormwater WPO VSMP 2017-12-05STORMWATER POLLUTION PREVENTION PLAN
Wilson Residence in Blandemar
SINGLE FAMILY RESIDENCE
COMMON PLAN of DEVELOPMENT or SALE
STORMWATER POLLUTION PREVENTION PLAN(SWPPP)
For Construction Activities At:
Wilson Residence
Lot 9 Blandemar Farms-Blandemar Drive
Charlottesville,VA,22903
Latitude:38.0011 N(decimal degrees)
Longitude:-78.3702 W(decimal degrees)
Construction Activity Operator:
Ben Wilson
19607 White Oak Road
Sutherland,VA 23885
804)732-6551
wilsonaruact rcn.corrt
24-hour Emergency Contact;Ben Wilson-(804)731-4924
SWPPP Preparation Date:
December 7,2017
CERTIFICATION
I certify under penalty of law that I have read and understand this document and that this document and all
attachments were prepared in accordance with a system designed to assure that qualified personnel properly
gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the
system,or those persons directly responsible for gathering the Information,the information submitted is,to the best of
my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting
false information,Including the possibility of fine gn imprisonment for knowing violations."
Operator Name: /
1&
4111 it//,f0 p,)
Title: d arvet
Signature:
Date: a - s--, 7
07/2014, Rev. 1 Single Family Residence, CPoD,SWPPP
STORMWATER POLLUTION PREVENTION PLAN
Wilson Residence in Blandemar
1.0 SWPPP Documents Located Onsite&Available for Review
SWPPP Document Type Located Onsite&Available for Review?
Registration Statement Yes NA
Notice of Coverage Letter Yes NA
Construction General Permit Yes NA
Site Plan Yes NA
Erosion&Sediment Control Plan(or agreement in lieu of)Yes NA
Stormwater Management Plan(or agreement in lieu of) Yes NA
2.0 Authorized Non-Stormwater Discharges
Type of Authorized Non-Stormwater Discharge Likely Present at Your Project Site?
External buildings wash down Yes No
Uncontaminated foundation or footing drains Yes No
Uncontaminated excavation dewatering El Yes No
Landscape irrigation Yes No
Others[describe] Yes No
3.0 Pollution Prevention Awareness
Employees will be given a "walk through" of the site identifying areas of possible pollution and will be shown Erosion
and Sediment Controls and Pollution Prevention Practices(identified in Sections 4.0 and 5.0 of this SWPPP)that are
applicable to their assigned job duties. A refresher meeting and "walk through" will be conducted on an as needed
basis.
4.0 Erosion&Sediment Controls
Select all Estimated Estimated
Responsible
that apply
Erosion&Sediment Control Installation Removal
PartyDateDate
Construction Entrance
Std. &Spec. 3.02)
04/01/2018 12/01/2018
Silt Fence
04/01/2018 12/01/2018Std. &Spec. 3.05)
Culvert Inlet Protection
Std. &Spec. 3.08)
05/01/2018 12/01/2018
Outlet Protection
05/01/2018 NAStd. &Spec. 3.18)
Rip Rap 05/01/2018 NA Construction ActivityStd. &Spec. 3.19) Operator(See Cover
Rock Check Dam
05/01/2018 12/01/2018
Page of this SWPPP)
Std. &Spec. 3.20)
Level Spreader
05/01/2018 NAStd. &Spec. 3.21)
Temporary Seeding As required
NAStd. &Spec. 3.31) by 3.31
Permanent Seeding 10/01/2018 NAStd. &Spec. 3.32)
07/2014, Rev. 1 Single Family Residence, CPoD, SWPPP
STORMWATER POLLUTION PREVENTION PLAN
Wilson Residence in Blandemar
Sodding 10/01/2018 NStd. &Spec. 3.33)
Mulching 10/01/2018 NAStd. &Spec. 3.35)
Soil Stabilization Blankets&Matting 05/01/2018 NAStd. &Spec. 3.36)
Dust Control
04/01/2018 NAStd. &Spec. 3.37)
07/2014, Rev. 1 Single Family Residence, CPoD, SWPPP
zaQE5a a.
aa) a
a)a
za o Q 5 cn
Om 0 >c a)cf.) 0
ov) .CO 0
Q.Z c
p14,
o `
o w 0toUWNmO
rea o a0) C
d "U) UOa
70
p f: a)
o fy
JCEO28 as
a 3 > . ( 0 v CD C CO o
v
ami
CZ a Q a c)
n
0
O sjeaiweq Ppm"iaulo x x x x x >
H
smog'soda°Vali x x x x x x x x x x
sasnmv epalpee x x
eseei0 V HiQ x x x X
sePPI4JaH'8 seppgsad x x
0 (seseq pue sppe)Hd x x x x x X
C
tlf °0 c Malan Atne9H x x x x x
z a
co
a siuN x x x x x X
c
0
luauupag x x x X x x
a)
d
O.
z z z z z z z z z z z
i
Cl)
0 a. lls
CO CO CO (/) CO Cl) CO (I) En COo1..• w a) a) w a) w a) a) a) a) a)
a as'2 >- >- >- >- >- >- >- >- >- >- >-
a a ® ® ® ® ® ® ® ® ® ®
c
0
3
O c
O di v a)
a) Qto 3 m C_
o X Cp .0 C -
p L
Ca d N
co C O C co y m
L 0 N
N f0
N .n. C p ? 'a) "
O ... 0) U 5CCl)
a as
a.
rnN a
3 m (g m CM
c
a a)rY
O m 3 a)
o T (pQ@ -
o
c p) a) C 7 0) a) _o N N 3 U
COc6C 'a m V ' N ` a) 0 W r-
NN > c E 5 3 m m v_ E 10 Cl)o
C co 0 a) '( a) Co ca o O 06 2 L N
Um a 0 o (na o 2 2a (I) Cl) J 0 ib0
STORMWATER POLLUTION PREVENTION PLAN
Wilson Residence in Blandemar
Pollution Prevention Practices:
1) Clearing, grading, excavating and un-stabilized areas — Utilize erosion and sediment controls to prevent
sediment laden or turbid runoff from leaving the construction site. Dispose of clearing debris at acceptable
disposal sites. Apply permanent or temporary stabilization, sodding and/or mulching to denuded areas in
accordance with the erosion and sediment control specifications and the general VPDES permit for
discharges of stormwater from construction activities.
2) Paving operations — Cover storm drain inlets during paving operations and utilize pollution prevention
materials such as drip pans and absorbent/oil dry for all paving machines to limit leaks and spills of paving
materials and fluids.
3) Concrete washout and cement waste—Direct concrete wash water into a leak-proof container or leak-proof
settling basin that is designed so that no overflows can occur due to inadequate sizing or precipitation.
Hardened concrete wastes shall be removed and disposed of in a manner consistent with the handling of
other construction wastes.
4) Structure construction,stucco, painting and cleaning — Enclose, cover or berm building material storage
areas if susceptible to contaminated stormwater runoff. Conduct painting operations consistent with local air
quality and OSHA regulations. Mix paint indoors, in a containment area or in a flat unpaved area. Prevent the
discharge of soaps, solvents, detergents and wash water from construction materials, including the clean-up
of stucco paint,form release oils and curing compounds.
5) Dewatering operations — Construction site dewatering from building footings or other sources may not be
discharged without treatment. Sediment laden or turbid water shall be filtered, settled or similarly treated prior
to discharge.
6) Material delivery and storage — Designate areas of the construction site for material delivery and storage.
Place near construction entrances, away from waterways, and avoid transport near drainage paths or
waterways.
7) Material use during building process — Use materials only where and when needed to complete the
construction activity. Follow manufacturer's instructions regarding uses, protective equipment, ventilation,
flammability and mixing of chemicals.
8) Solid waste disposal — Designate a waste collection area on the construction site that does not receive a
substantial amount of runoff from upland areas and does not drain directly to a waterway. Ensure that
containers have lids so they can be covered before periods of rain, and keep containers in a covered area
whenever possible. Schedule waste collection to prevent the containers from overfilling.
9) Sanitary waste — Prevent the discharge of sanitary waste by providing convenient and well-maintained
portable sanitary facilities. Locate sanitary facilities in a convenient location away from waterways.
10) Landscaping operations — Maintain as much existing vegetation as practicable. Apply permanent or
temporary stabilization, sodding and/or mulching to denuded areas in accordance with the erosion and
sediment control specifications and the general VPDES permit for discharges of stormwater from construction
activities. Apply nutrients in accordance with manufacturer's recommendations and not during rainfall events.
11) Others—If applicable,describe your Pollution Prevention Practice.
6.0 Stormwater Management Controls
Select all
Estima#:d
Responsible
that apply
Stormwater Management Control installation
PartyDate
Post-development Stormwater Management Controls Common Plan
provided by a NA Construction
Larger Common Plan of Development or Sale Activity Operator
Rooftop Disconnection NA
Sheetflow to Vegetated Filter(1 or 2)
10/01/2017
Via Level Spreaders
Construction
Grass Channel NA Activity Operator
See Cover Page of
this SWPPP)
Rainwater Harvesting NA
Permeable Pavement(1 or 2) NA
07/2014, Rev. 1 Single Family Residence, CPoD, SWPPP
STORMWATER POLLUTION PREVENTION PLAN
Wilson Residence in Blandemar
Estimated
that
aSelect
l
l
Stormwater Management Control Installation
Responsible
PP Y Date Party
Infiltration (1 or 2) NA
Construction
Bioretention(1 or 2) NA Activity Operator
See Cover Page of
this SWPPP)
Others[describe] Insert Date
7.0 Spill Prevention&Response
Most spills can be cleaned up following manufacturer specifications. Absorbent/oil dry, sealable containers, plastic
bags, and shovels/brooms are suggested minimum spill response items that should be available at this location.
1st
Priority:Protect all people
2nd
Priority: Protect equipment and property
3rd
Priority:Protect the environment
1. Check for hazards(flammable material, noxious fumes, cause of spill)—if flammable liquid, turn off engines
and nearby electrical equipment. If serious hazards are present leave the area and call 911. LARGE
SPILLS ARE LIKELY TO PRESENT A HAZARD.
2. Make Sure the spill area is safe to enter and that it does not pose an immediate threat to health or safety of
any person.
3. Stop the spill source.
4. Call co-workers and supervisor for assistance and to make them aware of the spill and potential dangers.
5. If possible, stop spill from entering drains(use absorbent or other material as necessary).
6. Stop spill from spreading(use absorbent or other material)
7. If spilled material has entered a storm sewer; contact locality's storm water department.
8. Clean up spilled material according to manufacturer specifications, for liquid spills use absorbent materials
and do not flush area with water.
9. Properly dispose of cleaning materials and used absorbent material according to manufacturer
specifications.
Emergency Contacts:
Normal Working Hours
DEQ Blue Ridge Regional Office(Roanoke) 540-562-6700
DEQ Blue Ridge Regional Office(Lynchburg) 434-582-5120
DEQ Northern Regional Office 703-583-3800
DEQ Piedmont Regional Office 804-527-5020
DEQ Southwest Regional Office 276-676-4800
DEQ Tidewater Regional Office 757-518-2000
DEQ Valley Regional Office 540-574-7800
Nights,Holidays&Weekends
VA Dept. of Emergency Management 804-674-2400
24 Hour Reporting Service
Local Contacts
Local Fire Department 434)296-5807
Local Police Department 434)971-1583
07/2014, Rev. 1 Single Family Residence, CPoD, SWPPP
STORMWATER POLLUTION PREVENTION PLAN
Wilson Residence in Blandemar
8.0 Inspections&Corrective Action Log(make additional copies as necessary)
Qualified Inspector
Company/Organization: TBD
Name: TBD
Telephone Number:TBD
Qualifications: TBD
Inspection Schedule
Discharges to surface waters:
Once every 5 business days;or
Once every 10 business days and no later than 48 hours following a measurable storm event.
Discharges to impaired waters,surface waters within a TMDL watershed,or exceptional waters:
O Once every 4 business days;or
Once every 5 business days and no later than 48 hours following a measurable storm event.
Inspection Date:
Measurable Storm Event
Best Management In Compliance Corrective Action Needed;Date Corrective
Practices(BMPs) with SWPPP? Responsible Party Action Taken
Erosion&Sediment
Controls 0 Yes 0 No
Section 4.0)
Pollution Prevention
Practices Yes 0 No
Section 5.0)
Stormwater 0 Yes 0 No
Management Controls
Section 6.0) El NA
Certification
I certify under penalty of law that I have read and understand this document and that this document and all
attachments were prepared in accordance with a system designed to assure that qualified personnel properly
gathered and evaluated the Information submitted. Based on my Inquiry of the person or persons who manage the
system,or those persons directly responsible for gathering the Information,the Information submitted is,to the best of
my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting
false Information,including theempossibi' of fine and imprisonment for knowing violations."
Operator Name:I"pof si r•- Inspector Name:
Signature: Signature:
Date: A •.s"`—/7 Date:
07/2014, Rev. 1 Single Family Residence,CPoD,SWPPP
STORMWATER POLLUTION PREVENTION PLAN
Wilson Residence in Blandemar
9.0 Grading&Stabilization Activities Log
Date
Description of the Date Date
Description of theGradingGradingActivityGradingStabilization
Stabilization MeasureActivityincludinglocation) Activity Measures
including location)Initiated Ceased Initiated
10.0 SWPPP Modification&Update Log
Modification Modification Prepared By
Date Description of the Modification/Update
name&title)
07/2014, Rev. 1 Single Family Residence, CPoD, SWPPP
INSTRUCTIONS for COMPLETING the
SINGE FAMILY RESIDENCE,COMMON PLAN of DEVELOPMENT or SALE
STORMWATER POLLUTION PREVENTION PLAN (SWPPP)
General
A Stormwater Pollution Prevention Plan (SWPPP) must be developed prior to obtaining locality (e.g., City, County, Town)
authorization to commence land disturbance.
Cover Page
For a construction activity, enter the project/site name and physical address (if available), including city (or town), state and zip
code. Enter the latitude and longitude in decimal degrees of the construction activity.
Enter the Construction Activity Operator's company/organization name,the Operator's name and mailing address, including city(or
town),state,and zip code,telephone number,email address(if available),and a 24-hour emergency contact.
Enter the SWPPP preparation date.
The Construction Activity Operator identified on the cover page of the SWPPP is responsible for certifying the information contained
therein. Please sign the certification in INK. Please note that state statues require the SWPPP to be signed as follows:
1)For a corporation:by a responsible corporate officer;
2)For a partnership or sole proprietorship:by a general partner or the proprietor,respectively;
3)For a municipality,state,federal,or other public agency:by either a principal executive officer or ranking elected official.
Section 1.0 SWPPP Documents Located Onsite&Available for Review
Utilize the provided checklist to ensure that the required SWPPP documents are located onsite and are available for review, if
applicable.
Section 2.0 Authorized Non-Stormwater Discharges
Identify the authorized non-stormwater discharges likely to be present at the project site. If an unlisted authorized non-stormwater
discharge is likely to be present at the project site,provide it here.
Section 3.0 Pollution Prevention Awareness
Provide employees with a"walk through"of the project site and identify areas of possible pollution,erosion and sediment controls,
and pollution prevention practices which are applicable to their assigned job duties. Conduct refresher meetings and perform
additional"walk throughs"on an as needed basis.
Section 4.0 Erosion&Sediment Controls
Identify the erosion and sediment controls to be implemented at the project site. For each erosion and sediment control,enter the
estimated installation date and estimated removal date. If an unlisted erosion and sediment control will be implemented at the
project site,provide the applicable information here.
Section 5.0 Potential Sources of Pollution&Pollution Prevention Practices
Identify the pollutant-generating activities likely to be present at the project site; implement and maintain the corresponding pollution
prevention practices. If an unlisted pollutant-generating activity is likely to be present at the project site, describe it, identify the
associated pollutant(s),and provide the corresponding pollution prevention practice(s)to be implemented and maintained.
Section 6.0 Stormwater Management Controls
Identify the stormwater management controls to be implemented at the project site,if applicable. For each stormwater management
control,enter the estimated installation date. If an unlisted stormwater management control will be implemented at the project site,
provide the applicable information here.
Section 7.0 Spill Prevention&Response
Most spills can be cleaned up following manufacturer specifications. The priority should be to protect all people, equipment,
property,and the environment. Enter the telephone number of your local fire and police departments.
Section 8.0 Inspections&Corrective Action Log
Enter the qualified inspector's company/organization name,the inspector's name,telephone number,and qualifications. Select the
applicable inspection schedule, enter the construction activity inspection date, and enter the date and rainfall amount of the last
measurable storm event(if applicable). Identify if the implemented best management practices are in compliance with the SWPPP.
Enter corrective actions needed;the party responsible for implementing the corrective actions,and the date corrective actions were
taken,if applicable. Make additional copies of the inspection and corrective action log as necessary.
Section 9.0 Grading&Stabilization Activities Log
Enter the date grading activities were initiated, a description of the grading activities including location, the date grading activities
ceased,the date stabilization measures were initiated,and a description of the stabilization measures including location.
Section 10.0 SWPPP Modification&Update Log
Enter the SWPPP modification date, description of the SWPPP modification/update, and the name and title of the SWPPP
modification preparer,if applicable.
07/2014;.Rev; I Single Family Residence, CPoD, SWPPP