Loading...
HomeMy WebLinkAboutWPO201700019 Permit WPO VSMP 2018-03-30 General Permit for Discharges of Stormwater from Construction Activities(VARIO) Registration Statement (Please Type or Print Ali Information) 1. Construction Activity Operator(The permit will be issued to this operator, and the Certification in Item#13 must be signed by the appropriate person associated with this operator[see the instructions)): Name:Albemarle County School Board Contact: Joe P. Letteri Mailing Address: 401 McIntire Road City:Charlottesville State: VA zip: 22902 Phone: (434) 975-9340 Email address(if available): jletteri@k12albemarle.org Indicate if DEQ may transmit the permit electronically: Yes X No 2. (Must be included for renewals of coverage only)Existing Permit Coverage#: 3. Location of Construction Activity: Name: Scottsville Elementary School Address:7868 Scottsville Road City: Scottsville state:VA Zip: 24590 County: Albemarle DMS to the nearest 15 seconds: Latitude 37.8187 Longitude -78.5106 Location of all Offsite Support Activities to be Covered Under the Permit: Name: Address: City: State: Zip: County: if street address unavailable: Latitude Longitude 4. Status of Activity:Federal❑ State® Public❑ Private❑ (Check one only) 5. The Nature of the Construction Activity(e.g.,commercial,industrial,residential,agricultural,oil and gas,etc.): Public 6. Name of the Receiving Water(s): Totier Creek- James River Hydrologic Unit Code(HUC): 020802031103 (Receiving waters identified as impaired on the 2008 305(b)/303(d)Water Quality Assessment Integrated Report or for which a TMDL WLA has been established for stormwater discharges from a construction site shall be noted in an attached list) 7. If the discharge is through a Municipal Separate Storm Sewer System(MS4),the name of the municipal operator of the storm sewer: Albemarle County 8. Estimated Project Start Date(mm/dd/yyyy): 05/2018 Estimated Project Completion Date(mmtdd/yyyy): 08/2018 9. Total Land Area of Development(to the nearest one-tenth acre): 14.7 Estimated Area to be Disturbed(to the nearest one-tenth acre): 0.61 10. Is the area to be disturbed by the construction activity part of a larger common plan of development or sale?Yes❑ No® 11. Are nutrient offsets intended to be acquired for this activity?Yes❑ No® Under consideration❑ 12. A stormwater pollution prevention plan (SWPPP)must be prepared in accordance with the requirements of the General Permit for Discharges of Stormwater from Construction Activities prior to submitting this Registration Statement. By signing this Registration Statement the operator is certifying that the SWPPP has been prepared. 13. Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." Print Name: Mr Joseph P i Title:1),-r4,,>, p,,..t�-, .,„L4,.. Signature: \t. ..A\ P Date: 3-30 1 P..,n (Please sign `` I .The person signing this form must be associated with the operator identified in Item#1 above.) Mail to: Deoartine t of Environmental Quality.Office of Stormwater Management. 10th Floor, P.O. Box 1105, Richmond,VA 23218 (DEQ 199-146)(08/13) INSTRUCTIONS for FORM DEQ 199-146 General Permit Registration Statement - Construction Activity Stormwater Discharges General Hydrologic Unit Code(HUC)is a watershed unit established in the most recent A Registration Statement must be submitted to the Department of Environmental version of Virginia's 64,order national watershed boundary dataset Quaky to register for coverage under the General Permit for Stormwater Section 7 Name of MS4 Operator Discharges from Construction Activities. if the stomiwater is discharged through a menial separate storm sewer Section 1 Construction Activity Operator information system(MS4),enter the name of the operator of the MS4.The name of the "Operator means the owner or operator of any facility or activity subject to the MS4 operator is usually the Town, City, County, Institute or Federal facility Stormstormwater the ac vity islocated. associated with a large or small construction activity, operator means any Section 8 Estimated Project Start Date person associated with a construction project that meets either of the following Enter the date(Month/Day/Year)the projected is expected to start two criteria:(i)the person has direct operational control over constnxxion plans Estimated Project Completion Date and specifications, including the ability to make modifications to those plans Enter the date(Month/Day/Year)the project is expected to be complete. and specifications or(ii)the person has day-to-day operational control of those activities at a project that are necessary to ensure compliance with a Section 9 Total Land Area of the Development stormwater pollution prevention plan for the site or other state permit conditions Enter total area(to the nearest one tenth acre)of the development(meaning (i.e., they are authorized to direct workers at a site to carry out activities the total acreage of the larger common plan of development or sale).Include required by the stormwater pollution prevention plan or comply with other the total acreage of any offsite support activities to be covered under the general permit conditions). permit The entities IMio are considered operators will commonly consist of the owner or Estimated Area to be Disturbed developer of a project(the party with control of project specifications)and the Enter an estimate of the total number of acres(to the nearest one tenth acre)to general contractor(the party with day to day operational ward of the activities at be disturbed. Include in the Estimated Area to be Disturbed the area of the project site which are necessary to ensure compliance with the state disturbance that will was at off-site support activities to be covered under the permit). Contractors and subcontractors who are under the general permit supervision of the general contractor are not considered operators and would Section 10 Larger Common Plan of Development or Sale not need to submit a registration statement. Give the legal name of the Incicate if the area to be disturbed by the construction activity is part of a lager operator,do not use a colloquial name.Enter the complete address and phone common plan of development or sale.Larger common plan of development or number of the operator.The permit will be issued to this operator. sale defines a contiguous are where separate and distinct construction may be Section 2 Existing General Permit Coverage Number haling place at different times on different schedules.Plan is broadly defined as For reappicatiors only,indicate the existing general permit coverage number for any announcement or documentation,inducting a sign,pubic notice or hearing, the project.This section does not need to be completed for new projects applying poles pitch,advertisement,such drawing,permits,lot soon,zoning request,etc.,ri g r for state permit coverage. physical demarcation as boundary signs,lot stake,and surveyor markings indicating that construction activities may coax. Section 3 Location of Construction Activity Information Section 11 Nutrient Offsets Enter the activitys official name and complete street address.including city(or town),county(if not located within a City),state and ZIP code. Indicate if rxinert offsets are intended to be acquired in accordance with§62.1- If the site lades a street address,enter the city(or fawn},county(if not located 44.15:35 of the Code ofllrgiria.If the acquisition of offsets is being considered but within a City) and the latitude and longitude in degrees, minutes, seconds s not certain,select"order consideration." (DMS)to the nearest 15 seconds of the approximate center of the site(example Section 12 A stormwater pollution prevention plan(SWPPP)must be prepared 37°30'15"N 77°20'15"W). in accordance with the requirements of the General Permit for Discharges of Location of Offsite Support Activities Stormwater from Construction Activitiesprior to submitting this Registration This general permit also authorizes stormwater discharges from support activities Statement By signing this Registration Statement the operator is certifying that the SWPPP has been prepared. (e.g.,concrete or asphalt batch plants,equipment staging yards,material storage areas,excavated material disposal areas,borrow areas)located on-site or off-site Section 13 Certification provided that (a)The support activity is directly related to the construction site The operator identified in Section 1 of this Registration Statement is that is required to have general permit coverage for discharges of stormwater responsible for certifying and submitting this Registration associated with construction activity(b)The support activity is not a corrvmercial Statement Please sign the form in INK. State statutes provide for operation serving multiple unrelated construction projects by different operators, severe penalties for submitting false information.State regulations require and does not operate beyond the completion of the construction ion activity at the this Registration Statement to be signed as follows: last construction project it supports; and (c)Appropriate control measures are For a corporation:by a responsible corporate officer.For the purpose of this identified in a stormwater pollution prevention plan and implemented to address part,a responsible corporate ry, the discharges iron the support activity areas. treasurer,or vi the corporation means: in a chprarge of, principal vice-president of the charge of a principal business Provide the information required for each off-site support activity seeking function,or any other person who performs similar policy-making or decision- coverage.If an off-site support activity is going to be covered by this permit the making functions for the corporation;or(ii)the manager of one ix more total laid area of the off-site support activity and area to be distubed by the off, manufacturing,production,or operating facilities,provided the manager is site support activity need to be included in the Estimated Area to be Disturbed authorized to make management decisions that govern the operation of the (Section 8). regulated facility including having the explicit or implicit duty of making major Section 4 Status of Activity capital investment recommendations,and initiating and directing other environmental the appropriateusof status(Federal,State, Public, or Private) of the comprehensive measures to assure long-term compliance with envirorental laws and regulations;the manager can ensure that the necessary systems are activity. established or actions taken tor Bathe complete and accurate information for Section 5 Nature of the Construction Project permit application requirements;and where authority to sign documents has Indicate the nature of the construction project (commercial, residential. been assigned or delegated to the manager in accordance with corporate agricultural,oil and gas,etc).This list is not all indusive. procedures. Section 6 Name of Receiving Water(s) For a partnership or sole proprietorship:by a general partner or the Enter the name of the receiving water(s) for ail stormwater discharge(s), proprietor,respectively. including any stormwater discharges from off-site support activities to be For a municipality,state,federal,or other public agency:by either a principal covered under the permit. Receiving waters identified as impaired on the executive officer or ranking elected official.For purposes of this part,a 2008 305(b)/303(d)Water Quality Assessment Integrated Report or for which principal executive officer of a public agency includes:(i)the chief executive a Total Maximum Daily Load(TMDL)Waste Load Allocation(WLA)has been officer of the agency or(i)a senior executive officer having responsibility for established for stormwater discharges from construction activities shall be the overall operations of a principal geographic unit of the agency. noted. The Department of Environmental Quality reserves the richt to request additional information not directly addressed by the Registration Statement if in its discretion.a facility or operation poses a potential impact on water quality. (DEQ 199-146)(08/13) COUNTY OF ALBEMARLE Community Development 401 McIntire Road Charlottesville, Vriginia 22902-4596 (434)296-5832 EROSION CONTROL PERMIT Date of Application: 02/21/2017 Permit Effective Date: 10/17/2017 Number: LANDOWNER: COUNTY OF ALBEMARLE SCHOOL BOARD ATTN: Phone: SUPERINTENDENT OF SCHOOLS 401 MCINTIRE ROAD CHARLOTTESVILLE VA22901 CONTRACTOR: CS CUSTOM STRUCTURES - DANIEL CYRUS Phone: 1934 GRAVES MILL RD LYNCHBURG, VA24502 REPONSIBLE LAND JASON WRIGHT - WRIGHT CONTRACTING Phone: DISTURBER: 1036 LEIGH MOUNTAIN ROAD GREEN BAY, VA23942 Ccrtification/License #: RLD05964 Type: Plans Prepared By.- Plans y: Plans Dated: Plans Entitled: Tax Map: Timmons Group 04/03/2017 WPO -2017-00019 (434) 610-3719 (434) 315-1770 Responsible Land Disturber Last Revised: 09/06/2017 SCOTTSVILLE ELEMENTARY SCHOOL SECURITY Location: ADDITION AND IMPROVEMENTS 13000-00-00-025PO Dist. 0.58 Acreage: Hydrological JM44 Unit: Additional Information: Annual Maintenance Fees [Sections 17-Zo7 & 208 of the Albemarle County Code] — Annual maintenance fees will be assessed in March of every year this permit is active. Fees cannot be prorated after the first year of permit issuance. Issued BQZ:4�e�l17- Title: Erosion Control Officer iT Signature Date General Permit for Discharges of Stormwater from Construction Activities(VAR10) Registration Statement (Please Type or Print All Information) 1. Construction Activity Operator(The permit will be issued to this operator,and the Certification in Item#13 must be signed by the appropriate person associated with this operator(see the instruction&): Name:Albemarle County School Board Contact: Joe P. Letteri Mailing Address: 401 McIntire Road City:Charlottesville State: VA zip: 22902 Phone: (434) 975-9340 Email address(if available): jletteri@k12albemarle.org Indicate if DEQ may transmit the permit electronically: Yes X No 2. (Must be included for renewals of coverage only)Existing Permit Coverage#: 3. Location of Construction Activity: Name: Scottsville Elementary School Address: 7868 Scottsville Road City: Scottsville state:VA Zip:• 24590 County: Albemarle DMS to the nearest 15 seconds: Latitude 37.8187 Longitude -78.5106 Location of all Offsite Support Activities to be Covered Under the Permit: Name: Address: City: State: Zip: County: If street address unavailable: Latitude Longitude 4. Status of Activity:Federal❑ Stats® Public❑ Private 0 (Check one only) 5. The Nature of the Construction Activity(e.g.,commercial,industrial,residential,agricultural,oil and gate,etc.): Public a. Name of the Receiving Water(s): Totier Creek-James River Hydrologic Unit Cods(HUC): 020802031103 (Receiving waters identified as impaired on the 2008 305(b)1303(d)Water Quality Assessment integrated Report or for which a TMDL WLA has been established for stormwater discharges from a construction site shall be noted In an attached list) 7. If the discharge is through a Municipal Separate Storm Sewer System(MS4),the name of the municipal operator of the storm sewer: Albemarle County 8. Estimated Project Start Date(mmiddlyyyy): 05/2018 Estimated Project Completion Date(mmiddlyyyy): 08/2018 9. Total Land Area of Development(to the nearest one-tenth acre): 14.7 Estimated Area to be Disturbed(to the nearest one-tenth acre): 0.58 10. Is the area to be disturbed by the construction activity part of a larger common plan of development or sale?Yes❑ No® 11. Are nutrient offsets Intended to be acquired for this activity?Yes❑ No® Under consideration❑ 12. A stormwater pollution prevention plan (SWPPP)must be prepared in accordance with the requirements of the General Permit for Discharges of Stormwater from Construction Activities prior to submitting this Registration Statement. By signing this Registration Statement the operator is certifying that the SWPPP has been prepared. 13. Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there aresignificant penalties for submitting false information including the possibility of fine and imprisonment for knowing viola ions." ..L _ Print Name: MrJoseph P. Title: Director Signature: Date: e ' 2 ' 11 (Please sign iIN .The person signing this form must be associated with the operator identified in Item#1 above.) Mail to: Deoartm t of Environmental Quality. Office of Stormwater Management, 10th Floor,P.O. Box 1105, Richmond,VA 23218 (DEQ 199.146)(08113) E E • INSTRUCTIONS for FORM DEQ 199-146 General Permit Registration Statement-Construction Activity Stormwater Discharges General Hydrologic Unit Code(HUC)is a watershed unt established in the most recent A Registration Statement must be submit ed to the Departnert of Endenrrental version of Virginia's 6"order national watershed boundary dataset. Quality to register for coverage under tie General Penult for Stornuaata Section 7 Name of MS4 Operator Discharges from Construction Aq . If the starnwater is discharged through a municipal separate stone sewer Section 1 Construction Activity Operator Information system(MS4),enter the name of the operator of the MS4.The name of the "Operator"means the owner or operator of any fac sty or activity subject to the MS4 operator is usually the Town, City, County, institute or Federal facility Stormwater Management Act and regulations. In the context of stormwaier where the conitru ion activity is located. associated with a large or small construction activity, operator means any Section 8 Estimated Project Start Date person associated with a construction project that meets either of the following Enter the date(Month/Day/Year)the projected is expected to start. two asteria:(I)the person has died operational control over construction plans Estimated Project Completion Date and specifications, including the abfiity to make,modifications to those plans Eraer the date(Month/Day/Year)the project is expected to be campke. and specifications or(b)the person has day-today operational control ofthose Suction 9 Total Land Area of the Development activities at a tprojecton that n are neon theersi to ensure compliance ppiartce wlth a Enter the total area(to the nearest one tenth acre)of the development(meaning stamwey pollution authorized toon plan wfaters site or etrer state carry outf tadMtles the total acreage of the carrion ion p�of development or sale).Include(i.e., they are authod direct workers ti a siteaorto cony activities r the acreageof any offate support activities to be covered under the general required by the stormwater pollution prevention plan comply with �' permit conditions). permit. Estimated Ares to be Disturbed The entities who are considered o °ra will canna* �of the uvea,a Enter an estimate of the total number of acres(to the nearest one tenth acre)to general contractor d a project(are party ayl d yd d project sped 0tme )and the be daubed. Inckrde in the Estimmatad Area to be Disturthed the area of general ctsiteh c party necessaryeday to day operational Control d the eddies hi ctehrrbaoe that v ooar at off-site support activities to be covered under the the project site which are to ensue compliance with the stats permit). Contractors and subcor>tmdors who we under the general Per supervision of the general contractor are not considered operators and would ',action 10 Larger Common Plan of Development or Sale not need to submit a registration statement. Give the legd name of the in icate if the area to be disturbed by the construction activity is part of a larger operator,do not use a colloquial name.Enter the co nplete address and phone cannon plan of development a sale.lager common plan of development or number of the operator.The permit oil be issued to this operator. sale deines a canfguaus are where separate and distinct constnidbn may be Section 2 Existing General Permit Coverage Number ung pace at(Hferent times on dilfeet schedules.Plan is broadly defined as any anounoernent or daarrrentatlon,including a sign,public notice a hearing, For reappicoions only,iodate the exising general pelt°overage reader for sales etch,adverise ant,drawing,pent appicadon,zoning request,etc.,or the project.This seduce does not need to be completed for new projects applying physical demarcatlon such as boundary signs,lot stake,and surveyor markings far state permit coverage. Indicating that corstnx ion activities may occur. Section 3 Location of Construction Activity Information Section 11 Nutrient Offsets Enter the actvitys otidal name and complete street address,including city(a Mate if rmudbient offsets are intended to be acquired In accordance with§621- town),county Of not located MI*a City),state and ZIP code 44.15:35 d the Code ofVtgimia.ff the emulation d ctbdi is being considered but If the site lades a street address,enter the city(or bon),county(II not located is not Date%,midst"under corrdderdion" within a City) and the latitude and imp*in degrees, minutes, seconds knoula A pow prevention ,p)must be prepared37'50 to the newest7°°2020'155" conds of the approximate tarifa,dire site(example(exampleinn accordance with the requ irenents of the General Permit for Discharges d 37°30 15"N 7 "W). geometer from Canstrumon Adlviies prkX to submlting this Registration Location of Offsite Support Activities Statement By signing this Registration Statement the operator is certifying that This general permit also authorizes slamweter discharges from euPPoit activities the SVVPPP has been prepared. (e.g.,concrete or asphalt batch plants,equipment staging yards,nmaiafel storage Section 13 Certification areas,excavated material disposal areas,borrow areas)located anode or off-site See operator Identified In Section 1 of this Registration Statement is thprovided that(a)The support l pee Is coveractlyge related r to atgesthe og tam stir responsible for certifying and submitting this Registration associated ied required construction have general permit heesupp for cii vi is ni d sbomcaraedetal Statement Please sign the form In INK. State statutes provide for operoperdiond with mutatead ted(b)The support eaciwb+b not a different aper tors, severe penalties for adremiting false i formation.State regulations require °^s r �� et norl Pry ctioncthis Registration Statement to be signed as follows: and does not operate beyond the completion d the construction activity at bre last construction project it supports;art(c)Appropriate control measures we Fora corporation:by a respond*corporateofficer.For the purpose of this identified in a sto rnwater pluton ton prevention pen and irplemeried to address part a responsible corporate officer means:(1)a president,secretary, the discharges from the support activity areas. treasurer,or vice-president d the corporation in charge of a principal business Provide the Information required for each cu-site support activity seeking on,or other person who performs simian policy-mating or decision coverage.If an off-site support activity is going to be covered by this permit the making functions for the corporation;or®the manager of one or more total laid area of the of-site support activity and area to be disturbed by the off- maxfaaurk►g,production,or operating facilities,provided the manager is site support activity need to be included in the Estimated Area to be Disturbed authorized to make rrherhsgerrhent decisions that govern tie operation of the (Section 8) regulated facility including having the explicit or implidt duty of ma drg major capital In restmernt reoommerh lations,and initiating and directing other Section 4 Status of Activity comprehensive measures to assure long-term compliance with environmental Indicate the appropriate status(Federal,State,Public,or Private)of the laws and regulations;the manager can ensure that the necessary systems are activity. established a actions taken to gather complete and accurate information for Section 5 Nature of the Construction Projecttonts;and where authority t°sigthe manager in accordance" documents has Indicate the nature d the construction project (camrnactal, residential. assigned with corporate agriculiral,of and gas,etc).This list is not all inclusive. procedures. Section 6 Name of Receiving Water(s) For a partnership or sole proprietorship:by a general partner or the Enter the name of the receiving water(s) for all stonnwater discharge(s), proprietor,respectively. inducting any stonrnrater discharges from off-site support activities to be For a municipality,state,federal,or other pubic agency.by either a principal covered under the permit Receiving waters identified as impaired on the executive officer or ranking elected oificial.For purposes of this part,a 2008 305(b)1303(d)Water Quality Assessment Integrated Report or for which principal executive officer of a public agency includes:(I)the chief executive a Total Maximum Daily Load(TMDL)Waste Load Allocation(1yVLA)has been officer of the agency or 1))a senior executive officer having responsibility for established for stormwater discharges iron construction acliviies shall be the overall operations of a principal geographic tea of the agency. noted. The Department of Environmental Quality reserves the d aht to request additional information not directly addressed by the Registration Statement if.in its discretion,a facility or operation poses a potential impact on water quality. (DEQ 199-146)(08/13)