HomeMy WebLinkAboutWPO201500102 Inspection WPO VSMP 2018-01-31COUNTY OF ALBEMARLE
Department of Community Development
VSMPNESCP PERMIT SITE INSPECTION REPORT
Project Name:
COVERAGE & POSTING REQUIREMENTS
1 (,\j ProjectANPO Number: 2U f 0/0
PrVARProjectAddress:
DEQ Permit Number (If
applicable):
2
Project Operator:
CommentsMescrfption
Operator Telephone #:
Project Contact: Contact Telephone M
gVAC25-870-310)(Alb. Co. Code §17-300,17-302)
Contact E -Mail: Qualified Personnel (QP):
Inspector: Weather (WetlDry/Rain): Dry
Disturbed Acreage:
main entrance of the construction activity? (CGP Part I I.C)
Inspection Date & Time: x/ 41-
411
Single -Family: Yes o
Notice of the location of the SWPPP is posted near the site's entrance, if
Stage of Construction: LJ
Building Construction
Notice of Termination
Pre -Construction Meeting Initial Clearing & Grading LJ
E] Final Grading Construction of SWM Facilities
Other:
Ro h Grading
Final Stabilization
Re -Inspection:
Yes No
3 applicable, and information for public access is provided? (gVAC25-870-
Page 1 of 7
COVERAGE & POSTING REQUIREMENTS yel No N/A Reviewed during re -inspection? []Yes []No
CommentsMescrfption
Constriction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
1 gVAC25-870-310)(Alb. Co. Code §17-300,17-302)
A copy of the notice of coverage letter is posted conspicuously near the l
2 main entrance of the construction activity? (CGP Part I I.C)
Notice of the location of the SWPPP is posted near the site's entrance, if
3 applicable, and information for public access is provided? (gVAC25-870-
54.GxCGP Part II D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS yes No N/A Reviewed during re -inspection? Yes []No
Comments/Oescrlptlon
The SWPPP is on-site or made available during the inspection? (CGP f
4
Part II D.1 & 2)(gVAC25-870-54.G) l
The SWPPP contains a signed copy of the registration statement?
5
CGP Part II A.1.a)
The SWPPP includes, upon receipt, a copy of the notice of coverage f
6 letter and the CGP? (CGP Part II A.1.b 8 c) f!
The SWPPP includes a narrative description of the nature of the
7 construction activity, including the function of the project? (CGP Part fl
A.1.d)
Page 1 of 7
Page 2 of 7
The SWPPP includes a legible site plan identifying all appropriate
8 measures and that includes the locations of support activities and the
onsite rain gauge, When applicable? (CGP Part II A.1.e(1-7))
9
The SWPPP contains the name, phone number and qualifications of
Qualified Personnel" conducting inspections? (CGP Part II A.6)
10
The SWPPP contains an approved erosion and sediment control plan?
9VAC25-870-54.B)(CGP Part II.A.2)
The SWPPP contains an approved stormwater management plan or an
11 existing construction site has a stormwater management plan that
ensures compliance with the water quality and quantity requirements?
9VAC25-870-54.C)(CGP Part I I.A.3) Technical Criteria 1111.113 ILC
12
The SWPPP contains an adequate pollution prevention plan? (9VAC25-
870-54.D)(CGP Part II.A.4)
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
13 concern, exceptional waters and the additional controls measures
applicable? (9VAC 25-870-54.EXCGP Part IIA.5 (a -b))
14 Delegation of Authority is provided and signed in accordance with Part III
K? (CGP Part 11 A.7)
15
The SWPPP is signed and dated in accordance with Part III K? (CGP Part
11 A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES Yes No N/A Reviewed during inspection? Yes []No
Commenfs/Descripdan
Is the SWPPP being amended whenever there is a change in the design,
16 construction, operation, or maintenance that has a significant effect on the
discharge of pollutants to surface waters? (CGP Part II B(1)x9VAC25-870-
G)
Has the SWPPP been amended if inspections or investigations by the
17 perator's qualified personnel, or by local, state or federal officials find that
xisting control measures are ineffective in minimizing pollutants in
ischarges? (CGP Part II B(2))(9VAC25-870-54.G)
18
ontractor(s) that will implement and maintain each control measure are
identified? (CGP Part II B(3))(9VAC25-870-54.G)
Have there been updates to the SWPPP when any modifications to its
implementation have occurred, including a record of dates when major
19 grading activities occur, construction activities temporarily or permanently
ease on a portion of the site or stabilization measures are initiated? (CGP
Part II B.4(a)X9VAC25-870-54.G)
20
Is there documentation in the SWPPP of replaced or modified controls?
CGP Part II B.4(b))(9VAC25-870-54.G)
21
Is the SWPPP updated to indicate areas that have reached final ell
stabilization? (CGP Part 11 B.4(c))(9VAC25-870-54.G)
Is the SWPPP updated to indicate properties that are no longer under the
22 legal control of the operator and the dates on which the operator no longer
had legal control over each property? (CGP Part II B.4(d)x9VAC25-870-
4.G)
Does the SWPPP identify the date of any prohibited discharges, the
23
olume released, actions taken to minimize the impact of the release and
measures taken to prevent the recurrence of any prohibited discharge?
CGP Part II BA(e-f)) (9VAC25-870-54.G)
24 ccordance
mendments, modifications, or updates to the SWPPP are signed in
with Part III K? (CGP Part Il B(5)K9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS Yes No N/A Reviewed during inspection? []Yes []No
Comments/Description
Inspections required by the SWPPP are conducted at the required
25 frequency, including a modified frequency for impaired water(s), approved
TMDL(s), and exceptional waters when applicable? (CGP Part II F (2))
CGP Part 11 A.5.b.3)
Page 2 of 7
rage ,s m
Inspection reports are completed and signed in accordance with CGP
6 Part 11 F (3-4)? (CGP Part II F (3-4))
Corrective actions are taken consistent with the requirements of the
27 CGP? (CGP Part II G(1-2))
ESC AND SWM PLAN IMPLEMENTATIONY No WA Reviewed during inspection? Yes []NoP28CommenCs/Des Apdan
Have stream buffers and steep slopes been protected as shown on the
Man?
Sequencing of the project is implemented In accordance with the
29 approved erosion and sediment control plan and stormwater managemen
plans? (9VAC25-870-54.B and C)
Have all denuded areas requiring temporary or permanent stabilization
been stabilized, and have stabilization requirements for impaired waters,
approved TMDL(s), pollutants of concern and exceptional waters, when
30 applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25
880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8))
CGP II E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
31 with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II r'r,(
A.2(c)) (9VAC25-870-54.B)
A permanent vegetative cover has been established that is uniform,
32 mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Have sediment trapping facilities been constructed as the first step in land cc rb ((5
33 disturbance activities? (9VAC 25-840-40.4) (CGP Part 11 A.2(c)) (CGP 11v
E(1-2)) (9VAC25-870-54.B)
Have earthen structures been stabilized immediately after installation?
34 9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.6)
Are sediment traps and basins installed in accordance with MS-6 and the
35 approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II
A.2(c)) (CGP I E(1-2)) (9VAC25-870-54.13)
Are finished cut and fill slopes adequately stabilized to prevent or correct
36 excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP 11 E(1-
2)) (9VAC25-870-54.13)
Is concentrated runoff down cut or fill slopes contained in an adequate
37 permanent or temporary structure? (9VAC 254840-40.8) (CGP Part II
A.2(c)) (CGP I1 E(1-2)) (9VAC25-870-54.B)
Is adequate drainage or other protection provided for water seeps?
38 9VAC 25-840-40.9) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.8)
Do all operational storm sewer inlets have adequate inlet.protection? C-E: P
39 9VAC 25-84040.10) (CGP Part 11 A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-
54.113)
Are stormwater conveyance channels adequately stabilized with channel
40 lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part 11 A.2(c))
CGP II E(1-2)) (9VAC25-870-54.B)
Is in-stream construction conducted using measures to minimize channel
25-840-40.12) (CGP Part II A.2(c)) (CGP II E(1-2)) 49 damage? (9VAC
9VAC25-870-54.13)
Are temporary stream crossings of non-erodible material installed where
42 applicable? (9VAC 25-84040.13) (CGP Part II A-2(c)) (CGP 11 E(1-2))
9VAC25-870-54.B )
43 Is necessary restabilization of in-stream construction complete? (9VAC
25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.8)
Are utility trench operations conducted and stabilized in accordance with
44 MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2))
9VAC25-870-54.8)
Are soil and mud kept off paved or public roads to minimize the transport
45 of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2))
9VAC25-870-54.13)
rage ,s m
Inspector Signatur< Date: 0
Page 4 of 7
Have all temporary control structures that are no longer needed been
removed and disturbed soil resulting from their removal permanently46
stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2))
9VAC25-870-54.B)
Are properties and waterways downstream from development adequately
47
protected from erosion, sediment and damage in accordance with the
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25 -840-
40.19(a -n))
48
Permanent control measures included in the SW PPP are in place?
9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a))
POLLUTION PREVENTION PLAN IMPLEMENTATION Yes No N/A Reviewed during inspection? []Yes No
CommentsJDescription
Practices are in place to prevent and respond to leaks, spills, and other
releases including (i) procedures for expeditiously stopping, containing,
49 and cleaning up spills, leaks, and other releases; and (ii) procedures for
reporting leaks, spills, and other releases in accordance with Part III G?
CGP Part II A.4.e(1)X9VAC25-870-56)
50
Practices are in place to prevent the discharge of spilled and leaked fuels
and chemicals from vehicle fueling and maintenance aces? (CGP Part II
A.4.e(2))(9VAC25-870-56)
Practices are in place to prevent the discharge of soaps, solvents,
51 detergents, and wash water from construction materials, including the
clean-up of stucco, paint, form release oils, and curing compounds? (CG
Part II A.4.e(3))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from vehicle
52 and equipment washing, wheel wash water, and other types of washing?
CGP Part 11 A.4.e(4)X9VAC25-870-56)
53
Concrete wash water is directed into a leak -proof container or leak -proof P
settling basin? (CGP Part 11 A.4.e(5)}(9VAC25-870-56) I
Practices are in place to minimize the discharge of pollutants from
54 storage, handling, and disposal of construction products, materials, and
wastes? (CGP Part 11 A.4.e(6)x9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
55 petroleum products, hazardous or toxic wastes, and sanitary wastes?
CGP Part 11 A.4.e(7x9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
56 pollutant -generating activities not addressed above, when applicable?
CGP Part 11 A.4.e(8))(9VAC25-870-56)
Inspector Signatur< Date: 0
Page 4 of 7
Notes:
CONSTRUCTION GENERAL PERMIT SITE INSPECTION REPORT
REQUEST FOR CORRECTIVE ACTION
Project Name: Permit Number (if applicable): Date:
Regulatory
Occurrence Observation/Recommended Corrective Action
Checklist # Citation/Legal
requirement'
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Acdon:
Observation:
Recommended Corrective Action:
I Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 at seq.), Virginia Erosion and
Sediment Control Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC2"70), or the General Permit for
Discharges of Stormwater from Construction Activities (9VAC25-880).
Page 5 of 7
Recommended Corrective Action Deadline:
Targeted Re -Inspection Date:
Comments:
The recommended corrective action deadline date applies to all conditions noted on this report unless otherwise noted. If listed conditions) currently
constitute non-compliance and/or corrective actions are not completed by the deadline, other enforcement actions may be issued to the entity responsible for
ensuring compliance on the above project.
Inspector Signature:
Page 6 of 7
Date: