HomeMy WebLinkAboutWPO201600011 Bond WPO VSMP 2018-03-01 111-5
Internal Use Only p 'fir- /lTO. 1. /y/&)//
Date Received:3.I D Fee Paid:crI D•v� 4,0Y LE%
Received by: y 1;!jn' ��
Intake: Forward to Management Analyst ®��tr
".01611
1 t iRGrAt^
BOND INSPECTION REQUEST
APPROVED PLAN # .A PO 0)01to Ool 1
PROJECT NAME: Harvest Moon
(As listed on the approved plan)
This is to request that an inspection be performed by the County. Where fees are assessed, a fee is required for
each inspection. Please check the inspections requested.
VSMPNESCP Erosion Control, Stormwater Management and/or Mitigation per
Water Protection Ordinance section 17-207& 208 $250
O Subdivision (roads, drainage,etc.) per Subdivision Ordinance section 14-435 and 14-438: $269
O Water& Sewer per Subdivision Ordinance section 14-435 $269
O Site Development Performance bond(Incomplete Site Work& Landscape Maintenance) $301
TOTAL FEES$250.00
Inspections for the purposes of bond reduction or release will require a separate fee for each bond.
Submit requests to: Department of Community Development, 401 Mclntire Road,North Wing,Charlottesville.
VA 22902, Attention: Management Analyst- Phone 434-296-5832: Fax 434-972-4126. All roads and
stormwater facilities will require construction record drawings. inspection reports.and completion processes
through VDOT or DEQ. Bonds will not be reduced or released without record drawings and inspection
documentation per the state requirements and county's published procedures. A minimum 20%of the original
posting is held until acceptance of all bonded improvements. For Site Development Performance bonds, if
landscape installation is part of the bonded incomplete site work,a request for reduction should only be made
once all site work is complete.
The revised estimate should be sent to:
EMAIL: mark@hmcatering.com
3352 Berkmar Drive
OR REGULAR MAIL ADDRESS: Charlottesville, VA. 22901
__Ai 6Y/1--
Signature of Owner/Developer
Mark S. Hahn March 1st, 2018
Print Name Date
Re‘N:d 7 15 2014. 7 20 2015 ii ; ,,iit