HomeMy WebLinkAboutWPO201700073 Bond Estimates 2018-05-31 (3)Project Name: UVA Foundation Boar's Head Inn Lobby Renovation and Parking Relocation WPO file number: WPO-201700073 Stormwater Management Plan Bond Estimate Item Item No.Unit Unit Cost Cost Number (installed) permanent diversion or ditch 0 ft $13.00 $0.00 standard manhole frame top (not inlet)2 ea $500.00 $1,000.00 drop inlet or grate 8 ea $3,500.00 $28,000.00 manhole structure (per ft. rise)0 ft $450.00 $0.00 pipe, rcp, cmp (15 to 48") 15.0 in d 0 ES-1,2 0 EC-1 101.8 ft $35.00 $3,563.00 pipe, rcp, cmp (15 to 48") 18.0 in d 0 ES-1,2 0 EC-1 47.7 ft $40.00 $1,908.00 pipe, rcp, cmp (15 to 48") 0.0 in d 0 ES-1,2 0 EC-1 0.0 ft $0.00 $0.00 aggregate base or drainage stone in d ft L ft W 0.0 ton $35.00 $0.00 permeable pavement (typ.) materials 16795.0 sf $22.00 $369,490.00 earthwork (based on typ 3.15' paver section)1959.4 cy $13.00 $25,472.42 labor 12736.2 ls - $12,736.21 8' x 4' x 62' underground detention culvert materials 62.0 lf $2,000.00 $124,000.00 earthwork 73.5 cy $13.00 $955.26 labor 62000.0 ls - $62,000.00 earthwork for trap/basin height of dam at toe 0 ft cut at high side 0 ft height of fill at face 0 ft cut at face 0 ft length of dam 0 ft length of cut 0 ft top width 0 ft width of cut 0 ft (area above transition)0 sf (area below transition)0 sf (total width of dam) 0 ft (total width of cut) 0 ft (height below transition)0 ft (depth below transition)0 ft (area below transition)0 sf (area above transition)0 sf (total fill volume) 0.0 cy (total fill volume) 0.0 cy length of spillway 0 ft (TOAL CY estimate) 0 cy $13.00 $0.00 width of spillway 0 ft (spillway stone tons) 0 tons $50.00 $0.00 structures for basin riser height 0 ft riser diameter 0 in (riser unit price) $0.00 $0.00 barrel length 0 ft base plate or fdn 0 $200.00 $0 barrel diameter 0 in (barrel unit price) $0.00 $0.00 barrel collars 0 $200.00 $0 baffle length 0 ft $50.00 $0 trees 0 ea $275.00 $0.00 shrubs 0 ea $50.00 $0.00 seedlings 0 ea $5.00 $0.00 underdrain (LF)1060 ft $5.00 $5,301.50 biofilter soil mix (CY)0 cy $45.00 $0.00 trash rack/ anti vortex devices 0 ft $1,500.00 $0.00 maintenance access road (LF)0 ft $50.00 $0.00 rip-rap, placed depth 0 ft length 0.0 ft width 0.0 (tons) 0 $60.00 $0.00 survey and layout (price per 0.1 mi.) acres 1.7 basins 0 $850.00 mobilization $2,500.00 as-built drawings (per facility)3 ea $2,000.00 $6,000.00 materials testing (per facility)3 ea $2,000.00 $6,000.00 compaction testing (per dam)0 ea $3,000.00 $0.00 manufactured facilities (attach manufacturer's or contractor's price as a base)$0.00 cost sum $649,776.38 prepared by Dewberry (A. Nelson /C. Golden, 5/31/18)contingency $64,977.64 WPO201700073-boars_head_inn_SWM_bond_est_09-27-17_053118dewberry.xlsx Total $714,760 6/1/2018