Loading...
HomeMy WebLinkAboutSP198600059 Action Letter 1986-10-15 e e ~'\~ 00 c; OF ALSE:,\1 "IJ?(~ '-n~ AO-~~,' ~"'i:il.~'\4-~ ~' :p,~ l' o -'I _~\._..~. ~ (~~.h,~if'r,l~ '\~ r~~) ~.!_~h.I~~;' DEPARTMENT of PLANNING and COMMUNITY DEVELOPMENT 401 Mcintire Road Charlottesville, VA 22901-4598 804 296-5823 October 22, 1986 John V. Berberich, III Chief Engineer E'. O. Box 911 Charlottesville, VA 22902-0911 RE: SP-86-59 City of Charlottesville Dear Mr. Berberich: The Albemarle County Board of Supervisors, at its meeting on October 15, 1986, unanimously approved the above-noted petition to allow for the installation of bank erosion control structures in the floodway of the Rivanna River at Pen Park. The property is located on Rio Road at the City-County line. Tax Map 62, Parcel 22. Rivanna Magisterial District. This approval is subject to the following conditions: 1. The Zoning Administrator shall issue a development permit for this project as required by ~30.3.3.2 of the Zoning Ordinance. No such permit shall be issued until all conditions of this special use permit have been met; 2. Approval of appropriate local, state, and federal agencies and presentation of evidence of such approvals to the Zoning Administrator; 3. County Engineer approval in accordance with the requirements of 30.3 Flood Hazard Overlay District with particular attention to approval of access and river crossing plans; - e 4. , Bonding or other mechanism by which the Zoning Administrator may cause immediate compliance with this special use permit and all other County regulations. The County Engineer shall make periodic inspection of the site to insure compliance with conditions imposed herein. The County Engineer may require such corrective measures as deemed necessary to insure compliance with these conditions; 5. Temporary stream crossings shall be removed when no longer utilized and no more than one crossing shall be used at anyone time; all disturbed and denuded areas shall be stabilized as required by the County Engineer; 6. Only those areas necessary for the conduct of this project shall be disturbed. Activity shall be conducted in such a manner so the equipment shall not travel over, be parked on, or otherwise encroach on tree root systems on property of others; 7. Compliance with the Soil Erosion and Sedimentation Control Ordinance; 8. Posting of warning signs upstream from site to advise canoeists and other users of construction activity and temporary obstructions. 9. Work to be accomplished between the dates of July 1 and January 31. If you should have any questions or comments regarding the above noted action, please do not hesitate to contact me. Sincerely, ... ) / 1,/1.( , j \, /' ! . I " I (1 L i. ( John T. P. Horne Director of Planning & Community Development JTPH/jcw . - COUNTY OF ALBEMARLE Dept. of Planning & Community Development 401 Mclntire Road Charlottesville, Virginia 22901 A596 (804) 296-5823 May 18, 1987 John V. Berberich, III Chief Engineer P. O. Box 911 Charlottesville, VA 22901 RE: SP-86-59 City of Charlottesville Dear Mr. Berberich, The Albemarle County Board of Supervisors, at its meeting on May 13, 1987, unanimously approved the your request to amend a previously approved condition regarding the starting date for the installation of bank erosion control structures in the floodway of the Rivanna River at Pen Park. Located on Rio Road at the City-County line. Tax Map 62, Parcel 22. Rivanna Magisterial District. Condition #9 was amended to read as follows: #9. Work to be accomplished between the dates of June 1, 1987 and January 31, 1988. If you should have any questions or comments regarding the above noted action, please do not hesitate to contact me. s~n6;'rlY' . ..~.' yyy~! l-f(?/J~~ JO~ L. P. Horne DiJ;j~or of Planning & Community Development JTPH/jcw L