Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SDP201500007 Correspondence Final Site Plan and Comps. 2015-12-29
Johnathan Newberry From: Chris Mulligan <CMulligan@roudabush.com> Sent: Tuesday, December 15, 2015 12:46 PM To: Johnathan Newberry Subject: RE: Final Site Plan Ready to be signed... Please recycle them, and I'll get you 4-full new sets. 914 Monticello Road Charlottesville, Virginia 22902 (804) 437-2788 (cell) From:Johnathan Newberry [mailto:jnewberry@albemarle.org] Sent:Tuesday, December 15, 2015 11:28 AM To: Chris Mulligan <CMulligan@roudabush.com> Subject: RE: Final Site Plan Ready to be signed... The revised .pdfs sufficiently address the items in my earlier email. We can do a couple different things from here: 1. I can make the four plan sets submitted yesterday available at our front desk, so that the revised sheets can replace the existing ones. 2. I can recycle the four plan sets I have here and four new plan sets can be submitted. Just let me know how you'd like to move forward. Thanks. From:Chris Mulligan [mailto:CMulligan@roudabush.com] Sent:Tuesday, December 15, 2015 11:05 AM To:Johnathan Newberry<jnewberry@albemarle.org> Subject: RE: Final Site Plan Ready to be signed... I have managed to squeeze this on Sheet 9, See attached. c Ir 914 Monticello Road Charlottesville, Virginia 22902 (804) 437-2788 (cell) From:Johnathan Newberry [mailto:jnewberry@albemarle.org] Sent:Tuesday, December 15, 2015 10:12 AM To: Chris Mulligan <CMulligan@roudabush.com> Subject: FW: Final Site Plan Ready to be signed... Hi Chris, Some errors were discovered on this plan: 1 Johnathan Newberry From: Bill Ledbetter <BLedbetter©roudabush.com> Sent: Wednesday, November 18, 2015 5:01 PM To: Johnathan Newberry; Ammy George Cc: David Jordan Subject: RE: Planning Application Review for SDP201500007 Old Trail Village Block 12 Phase 2 - Final. Thanks JT. I will have David do the same variation note format on the Block 15 plat Bill Ledbetter Roudabush, Gale and Associates 914 Monticello Road Charlottesville, Virginia 22902 434-977-0205 office 540-649-0190 cell 434-296-5220 fax From: Johnathan Newberry [mailto:jnewberry@albemarle.org] Sent: Wednesday, November 18, 2015 5:01 PM To: Ammy George Cc: David Jordan; Bill Ledbetter Subject: RE: Planning Application Review for SDP201500007 Old Trail Village Block 12 Phase 2 - Final. These changes look good. Planning has no further comment and can approve SDP201500007. Thanks. From: Ammy George [mailto:AGeorge@roudabush.com] Sent: Wednesday, November 18, 2015 4:17 PM To:Johnathan Newberry<inewberry@albemarle.org> Cc: David Jordan <DJordan@roudabush.com>; Bill Ledbetter<BLedbetter@roudabush.com> Subject: RE: Planning Application Review for SDP201500007 Old Trail Village Block 12 Phase 2 - Final. Good afternoon JT, Thank you for getting back to me with the language you wanted. I have revised the notations on the Cover Sheet to reflect that language for the Building Height, Setbacks, Building Overhangs and Lot Sizes. You can review the changes in the attached PDF file. If you have any other questions or comments, please feel free to contact me. A-kkopte George From:Johnathan Newberry [mailto:jnewberry@albemarle.org] Sent: Wednesday, November 18, 2015 3:44 PM To: Ammy George<AGeorge@roudabush.com> 1 GENERAL NOTES; OL OstifRJt1CfLOPfR MARCH MOUNTAIN PROPERTIES LIC CONTACT: DAVE 8R00MAN 1005 Heathenrol Cede. Suite T00 OLD TRAIL 1U,LAGE Crozet. VA 22932 til. (7047965-9088 CoreeNd can PLAN PREPARER. RCM)AbUSII. GALE. & ASSOCIATES 914 MONTICELLO ROAD CHARLOTTESIXLE, VA 22902 TAX MAP PARCEL No: A PORTION OF 055£0-01-00-000AI IONANG NE'IGHeOR1DW MODEL Dus1RICT IN ACCORDANCE METH PROFFERS OF 2.MA-04-024 APPROVED ON SEPTEMBER 14. 2006 ON AUG. 6. 2074. THE WARD OF SU RMSORS APPROVED A SPECIAL EXCEPTION TO AUTHICpIR A VARIATION FROM/ THE coo(0 OElCL0PIENT TO ALLOW APPROVAL OF AYE FOOT FRONT. S (■O INCLUC AND REAR SETBACKS FOR SINGLE-FAMES UMTS N BLOCKS 28 & 299. A. ON OCT. 8, 2014. Of BOARD OF SUPERVISORS APPROVED A SPEOAL EXCEPTION TO ALMONER' A VARIATION FROM THE CODE OF Df1CL0PAtf'NT TO ALLOW ROOF OVERHANGS AND EAVES TO 18100,401 DHE mc-FOOT BtNLOTNG SE7BACW MINN Boors 20 r 296. 9.8.ECT TO THE FOLLOWING arrow A) ROOF OVERHANGSjnw- AA AND SHALL NOT PROJECT FURTHER THAN ONE (1) FOOT OTO THE USE: BLOCK 28 - 9 VIGIL FANNY DETACHED UNITS 6 Moat FMGL,Y O(%UX WITS BLOCK 299 - 11 5iN(XE FAMILY DETACHED UWTS 4 SINGLE TAM)'DUPLEX MIS BLOCK 35A - 2 SINGLE FAMILY DETACHED (NTS BINDING HECCHT; NOT 1O EXCEED 25 STORES DRAINAGE DISTRICT: IX*14G'$cLE CREEX WATER9to. UO(4Id/CLF CREIK TOPOGRAPHY LOLISA AEIAL SUR4EYS. AUGUST 2012 RTqaire0Ia t91111AW CPSUBMITTAL. DATL11t VERTICAL - NAND 88. NORITONTAL - HAD 83 CRITICAL SLOPES. NO CRtiCAL SLOPES EXIST NM THE PROJECT LNHNT5. FLOODPLAIN. 1)45 PROJECT IS NOT LOCATED MINN f1000PLAIN UMTS AS SHONN ON FLOOD INSURANCE RATE MAP COMMRANTY PARCEL M. BER 510006 0237 D. EFFECTIVE DATE: FEBRUARY 42001 LAAOSCAPNVG` SEE LANDSCAPING PLAN FOR PLANFINCS SCHEDULE AM) SPECIFICATIONS, NOTES MO OETARLS LOTS 1 114RU IS OF BLOW 18, 6 111141 21 OF BLOCK 298. AND 8 MD 9 of BLOCK 3SA EACH CONTAIN A 81N1DNG 911 THAT COMP ES MTTN secnov 4.2.1 Cr THE AMBfMARLE COUNTY IONIC ORDNANCE LOTS 14-20 Nv BLOCK 296 *1. FRONT ON OOLF DRIVE. NO NOME OF A BURIAL 5111 WAS FOUND ON THIS PORTION OF PARCEL Al. THIS DTE IS NOT LOCATED WPM AN AGRICULTURAL-FORESTAL DISTRICT. THEW ILI 8E NO OUTDOOR UCH TING MOW 3.000 LLaKNS PLANNING COMWISSION APPROVAL OF 95004 LANE, BR0494 COURT, AND BMTOM ONW INAIVfD REOJRE11ENTS FOR SKIEWALKS STREET TREES. AID PLANTING STRIPS, SLU9.LCT TO DC FOtLO1NNG CONDITION. A) SOEWALK TO BE PRODDED GLV DC NORTH SIDE OF HAZEL CROW LANE OR A 'CLASS A. TYRE t' PAVED PEDESTRIAN PATH TO 8E PROVIDED THROUGH OPEN SPACE' ADJACENT TO LOTS THAT FRONT ON HAZEL CROW LANE. From: Bill Ledbetter [mailto:BLedbetter@roudabush.com] Sent:Wednesday, November 18, 2015 12:28 PM To:Johnathan Newberry<jewberry@albemarle.org> Cc:Ammy George<AGeorge@roudabush.com>; David Jordan <DJordan@roudabush.com> Subject: RE: Planning Application Review for SDP201500007 Old Trail Village Block 12 Phase 2 - Final. 3 Noire Acknowledged. The Architectural Review Board Application and plans will be submitted under separate cover. 2. [Section 32.5.2(a)] On September 2, 2015,the Board of Supervisors approved the following variations to the Code of Development. Please update Sheet 1, under Site Data, to reflect these approvals including each of their conditions: a. To permit lot sizes below 4,000 square feet, subject to the following condition: • No lot size for a single-family attached unit shall be less than 1,800 square feet. The Site Data has been updated to reflect the approved variation for minimum lot size for single-family attached units. b. To permit a building height above the maximum 2.5 stories permitted, subject to the following condition: • No building height shall be greater than 3.5 stories. The Site Data has been updated to reflect the approved variation for maximum stories for the single-family attached units. c. To reduce the setbacks, subject to the following conditions: • Lots 13-24 shall have five (5) foot front, zero (0) foot side and five (5) foot rear setbacks. • Lots 8-12 shall have five (5) foot front, side and rear setbacks. The Site Data has been updated to reflect the approved variation for the setbacks for single-family attached units. (The lot numbers shown on the plan differ from those shown in the exhibit from the Board of Supervisors meeting. The lots were renumbered due to the recordation of a plat for Block 12, Phase 1. In order to avoid confusion to the lot number on the Site Plan were revised; lots previously shown as 13-24 are now 1A-12A.) d. To allow roof overhangs and eaves to encroach the building setback, subject to the following condition: • Roof overhangs and eaves shall not be permitted to project further than one foot into the building setback. The Site Data has been updated to reflect the approved variation for the roof overhangs and eave encroachment into the building setbacks. 3. [Comment] Several of the column totals in the cumulative overall development table are incorrect. Please revise this table and confirm the accuracy of the numbers being provided. The total columns that do not add up are titled: Single-family Attached Units, Townhouse Units, Condo/Apartment Units, Total Units, For Sale, For Rent Apartments, Total: Number of Units. Other columns may also need revision and will likely impact the percentage calculations. The development table has been updated to reflect the current plans. I have attached a PDF of the updated Cover Sheet and the Phasing Plan with the development table for your review. If you need additional paper copies, let me know. Additionally, if you have any questions or comments, please feel free to contact me. 5 Roudabush, Gale and Associates 914 Monticello Road Charlottesville, Virginia 22902 434-977-0205 office 540-649-0190 cell 434-296-5220 fax From: John Anderson [mailto:janderson2©albemarle.org] Sent: Friday, October 30, 2015 6:47 AM To: Bill Ledbetter Cc: Johnathan Newberry Subject: Planning Application Review for SDP201500007 Old Trail Village Block 12 Phase 2 - Final. The Review for the following application has been completed: Application Number = SDP201500007 Reviewer = John Anderson Review Status = Requested Changes Completed Date = 08/25/2015 Bill, We've since discussed/addressed single remaining engineering comment. When JT distributes, Engineering will not object to SDP201500007. Do you think retention basin design may affect site plan? Invitation, 12pm, Monday, is on its way. Thanks, Bill 7 'tow' vtimoi • John Anderson From: Dave Brockman <dave@oldtrailvillage.com> Sent: Monday,January 12, 2015 9:32 AM To: Mark Graham; 'Bill Ledbetter'; glenn.muckley@stantec.com; ron.boyd@stantec.com Cc: Amelia McCulley; David Benish; Glenn Brooks; Rebecca Ragsdale; Doug Walker;John Anderson Subject: RE: DRAFT - FOR INTERNAL REVIEW ONLY Hi Mark and all, I hope all of your Holiday's were good. We have been working with Stantec/WEG on the next progression of a storm water master plan for Old Trail and doing our best to follow your guidance.Thank you again for provide this right before the Holiday break. Our team would be ready to meet and review a preliminary draft prepared by Stantec/WEG that attempts to address these issues and to get your feedback.The first proposal for dates are Jan 29-30 or Feb 2-6. Can you let me know what works with yourself and the relevant players from your side. If they don't work please provide the next earliest for us to consider. Thanks and looking forward to getting together. Dave Brockman From: Mark Graham [mailto:mgraham@albemarle.org] Sent: Friday, November 21, 2014 4:36 PM To: Dave Brockman; Bill Ledbetter; glenn.muckley@stantec.com; ron.boyd@stantec.com Cc: Amelia McCulley; David Benish; Glenn Brooks; Rebecca Ragsdale; Doug Walker Subject: FW: DRAFT- FOR INTERNAL REVIEW ONLY Dave, To follow up on our Monday meeting, Glenn and I have met with Zoning and Planning to make sure we are staying consistent with the approved zoning plan and stormwater requirements. In doing this,we've tried to set the limit on what is expected and what we can approve. Please do not take this as a negotiation offer, it is not. Instead,we've realistically looked at what is needed to comply with the VSMP and without first amending the current property zoning. From that, I am offering the following as a set of guidelines to follow in development of a stormwater master plan that avoids the need to amend the zoning. To assist in understanding, I have attached Glenn's illustration at the end of this message. The following are what I believe are the important points: • Those areas that show onsite stormwater management( red on the illustration) must have facilities to capture at least 75%of this drainage area. That said,they do not need to be biofilters as indicated on Timmons plan, but could be another approved type of stormwater management facility. • Those areas that were shown as draining to the ponds within the approved zoning plan (blue on that illustration), but were not constructed to drain to them or have other reasons the ponds cannot be used, issues, must either have the storm sewer constructed so they correctly drain to the ponds as shown or may have other facilities within Old Trail to treat that runoff before it enters the stream.The same as the areas in red,we expect no less than 75%of the drainage area to be captured onsite for treatment.Obviously, if this requires you to propose changes to the approved layout plan,this will likely require either a variation to the plan 1 or a zoning amendment. In that case,we should talk with the planners about what changes staff will be comfortable in supporting. • Those areas that were shown as not having facilities to address the runoff(white on this plan)are allowed to have flow directly into the stream, but the water quality impacts must still be addressed. For all the areas not being routed through BMPs(this area plus uncaptured areas with the red and blue areas),a 30%reduction credit can be provided by Lickinghole. • With the above, our initial analysis indicates it should be possible to meet the phosphorus reduction required with the VSMP that apply to this property(2C). If it turns out the onsite facilities and the Lickinghole credit cannot meet the entire pollutant reduction,we will consider using the offsite ponds to address the incremental difference. That would need to be verified as genuinely providing a reduction above and beyond what was previously approved. • Finally, if there is an interest in using any of the County owned property for a stormwater facility, please recognize this will need to involve a number of people outside of Community Development. This will require additional time and effort to coordinate with Parks and Recreation,the County Attorney's Office,the County Executive's office and ultimately the Board of Supervisors to assure the County's interest in the property is being protected. Past experience suggests it will likely take 4-6 months to finalize an easement agreement with the County once everyone has agreed upon the recommendation. I hope this simplifies things and gives Stantec the guidance needed to develop a good plan. Have a great Thanksgiving. Mark 2 ........." ! 1 ..1.1.4411 IN �, Q ^. '1 ...._., ,",dam.. .. � F J,. ...,.....F..... 4 �� ♦..a, a ii +..__„ .w...r. RnrtF ,.�Fi. .. -i� !rV •• . ��S .YJW'u I F I , -fit. , 1' ' j Vis` /w y IIApe ,fir:UPOR ;- - - V y'+i7 � f` Areae shown by outline are approximate areas Z -' to discharge points used for compliance computations 0 i; MINE 3 LETTER OF TRANSMITTAL Roudabush, Gale & Assoc., Inc. 914 Monticello Road Charlottesville,VA 22902 (434) 977-0205 TO: J.T. Newberry DATE: June 23,2015 Albemarle County Community Development JOB #: 8053 401 McEntire Road PROJ: Old Trail Village Charlottesville, Va 22902 X Attached Under separate cover via the following items: #of Copies Date Job # 4 6- 15 8053 Block 12 Phase 2 &3 Final Site Plans—SDP201500007 9 6-$-15 8053 Block 12 Phase 2 &3 Road & Utility Plans–SUB201500020 1 6-12-15 8053 Document of Comment Responses These are transmitted as checked below: X For approval _For your use _Please return _As requested X Resubmitted w/revisions _Review/Comment _For Bids due Other REMARKS: J.T., Attached are the revised plans which have incorporated the comments from each department. Also provided are detailed comment responses providing the specifics of the revised information. Please send each department their respective plans and associated documents. If you have any questions please feel free to contact me. Thank you. SIGNED: Chris Mulligan COPY TO: If enclosures are not as noted, kindly notify us at once. ‘✓ LETTER OF TRANSMITTAL Roudabush, Gale& Assoc.,Inc. 914 Monticello Road Charlottesville,VA 22902 (434) 977-0205 TO: J.T. Newberry DATE: April 17,2015 Albemarle County Community Development JOB #: 8053 401 McEntire Road PROJ: Old Trail Village Charlottesville, Va 22902 X Attached Under separate cover via the following items: #of Copies Date Job # 1 6 4-14-15 8053 Block 12,Phase 2 Final Site Plans—SDP201500007 11"x17" Copy of the Block 12,Phase 2 Final Site Plans- ? 1 4-14-15 8053 SDP201500007 9 4-14-15 8053 Block 12,Phase 2 Road & Utility Plans g( 1 4-15-15 8053 Water and Sewer Data Sheets-Ii Se444 v.1 b.4. Pott 4 r a,is.:44ec( -7 7-64c / 402 5053 Enaneerly Documertk oc Cometient kesForises 402 art c1 eta i vi in g W a.tt 1D cu . S beets These are transmitted as checked below: _For approval _For your use _Please return _As requested X Resubmitted w/revisions _Review/Comment _For Bids due Other REMARKS: J.T.,I put together the submittal packages that need to be sent to VDOT and ACSA (i.e. copies of the plans and the associated documents that go to each office). I will not be submitting any plans directly to VDOT or ACSA, so please deliver the packages to the respective office. Thank you! If you have any questions please feel free to contact me. SIGNED: Raleigh Davis COPY TO: If enclosures are not as noted, kindly notify us at once. Nrr/ Johnathan Newberry From: Jeremy Lynn [jlynn@serviceauthority.org] Sent: Friday, March 20, 2015 1:39 PM To: 'Bill Ledbetter' Cc: John Anderson; 'Dave Brockman'; Johnathan Newberry; 'Chris Mulligan'; 'Raleigh Davis' Subject: RE: Planning Application Review for SDP201500007 Old Trail Village Block 12 Phase 2- Final. Bill, The ACSA would not permit the water meter to be placed behind the retaining wall. The ACSA is unwilling to own and maintain a service line under the wall. Therefore, the water meter must be located between the curb and sidewalk. Let me know if you have any questions or if we need to discuss in further detail. Jeremy M. Lynn, P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road, Charlottesville, VA 22911 (434) 977-4511 ext. 114 From: Bill Ledbetter [mailto:BLedbetterCa�roudabush.com] Sent: Friday, March 20, 2015 1:36 PM To: Jeremy Lynn Cc: John Anderson (j anderson2Caalbemarle.orq); Dave Brockman; Johnathan Newberry; Chris Mulligan; Raleigh Davis Subject: FW: Planning Application Review for SDP201500007 Old Trail Village Block 12 Phase 2 - Final. Jeremy, Please see comment Retaining Wall comment 10.b.vi on sheet 2 of the attached comments for Block 12, Old Trail. Is having the water meters located behind the retaining wall something ACSA will accept? Thanks Bill Ledbetter Roudabush, Gale and Associates 914 Monticello Road Charlottesville, Virginia 22902 434-977-0205 office 540-649-0190 cell 434-296-5220 fax From: John Anderson [mailto:janderson2(aalbemarle.orq] Sent: Friday, March 20, 2015 11:25 AM To: Chris Mulligan Cc: Raleigh Davis; Bill Ledbetter; Johnathan Newberry; David Brockman Subject: FW: Planning Application Review for SDP201500007 Old Trail Village Block 12 Phase 2 - Final. 1 From: John Anderson Sent: Wednesday, March 18, 2015 12:30 PM To: Johnathan Newberry Subject: Planning Application Review for SDP201500007 Old Trail Village Block 12 Phase 2 - Final. The Review for the following application has been completed: Application Number=SDP201500007 Reviewer=John Anderson Review Status = Requested Changes Completed Date = 03/18/2015 Thanks for your patience, J.T. Attached doc (also in CV, Docs/Pics)has not been shared with Applicant. I intend to comment on SUB2015-00020—block 12 phase 2 road plans, later today, and send comments directly to RGA. Thanks, again. 2 '41111130 Nue A: '. i:A4 ,',; ' t_1f vR a COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 16O i Orange Road c&dpeper Virginia 22701 Charles A.Kilpatrick,P.E. Commissioner February 26,2015 Mr.Johnathan Newberry Senior Planner County of Albemarle Department of Community Development 401 McIntire Road Charlottesville,VA 22902 Re: SDP-2015-00007 Old Trail Village Block 12,Phase 2,Site Plan Dear Mr.Newberry: The Old Trail Village Block 12,Phase 2 Site Plan,with revisions dates of October 24,2014 and February 4,2015,has been reviewed and we offer the following comment: 1. The proposed retaining wall should not be located within the Existing 61' Public ROW. It should be shifted back enough to accommodate the footers. If you need further information concerning this project,please do not hesitate to contact me at (434)422-9373. Sincerely, yAZI‘Al-pladie.e... Shelly A.Plaster Land Development Engineer Culpeper District WE KEEP VIRGINIA MOVING 8401 LETTER OF TRANSMITTAL Roudabush, Gale & Assoc., Inc. 914 Monticello Road Charlottesville,VA 22902 (434) 977-0205 TO: J.T. Newberry DATE: February 4, 2015 Albemarle County Community Development JOB #: 8053 401 McEntire Road PROJ: Old Trail Village Charlottesville, Va 22902 X Attached _Under separate cover via the following items: # of Copies Date Job # 13 2-4-15 8053 Block 12, Phase 2 Final Site Plans—SDP201400061 1 2-4-15 8053 11"x17" Copy of the Block 12,Phase 2 Final Site Plans– SDP201400061 1 1-29-15 8053 Sewer and Water Data Sheets 1 10-24-14 8053 Pavement Design Calculations and ADT Sheet 2 2-4-15 8053 Storm Sewer Computations These are transmitted as checked below: _For approval For your use _Please return _As requested _Resubmitted w/revisions X Review/Comment _For Bids due Other REMARKS: J.T.,I put together the submittal packages that need to be sent to VDOT and ACSA (i.e. 3 copies of the plans and the associated documents that go to each office). I will not be submitting any plans directly to VDOT or ACSA, so please deliver the packages to the respective office. Thank you! If you have any questions please feel free to contact me. SIGNED: Raleigh Davis COPY TO: If enclosures are not as noted, kindly notify us at once.