Loading...
HomeMy WebLinkAboutSDP201600017 Review Comments Initial Site Plan 2016-05-13Short Review Comments Report for: SDP201600017 SubApplication Type: Hollymead Town Center Bojangles - Initial Initial Site Plan Date Completed:05/05/2016 Reviewer:Johnathan Newberry CDD Planning Review Status:Requested Changes Reviews Comments: Division: Date Completed:04/05/2016 Reviewer:Andrew Slack CDD E911 Review Status:No Objection Reviews Comments:No objections. Division: Date Completed:04/29/2016 Reviewer:Max Greene CDD Engineering Review Status:See Recommendations Reviews Comments:`Planting plan does not have a scale or North Arrow on the sheet. Appears to be 1:20 scale. (18-32.5.2) `16' parking spaces require a 2' unobstructed overhang. (18-4.12.16.c.6) Planting plan appears to show proposed plantings in this area. `Road plans will be required for thru-road construction. Road will be built and accepted into the system or bonded prior to final site plan approval. (18-32.7.2.2) `Easement plat will be required for road across adjacent parcel. `Approved VSMP plans will be required prior to final site plan approval. (18-32.7.4.1) `Gutters shall be required where necessary to control or direct stormwater runoff. (18-4.12.15.g) Division: Date Completed:04/22/2016 Reviewer:Margaret Maliszewski CDD ARB Review Status:Requested Changes Reviews Comments: Division: Date Completed:04/06/2016 Reviewer:Jay Schlothauer CDD Inspections Review Status:No Objection Reviews Comments:Based on plans dated March 21, 2016. No comments or conditions. Division: Date Completed:05/03/2016 Reviewer:Robbie Gilmer Fire Rescue Admin Review Status:Requested Changes Reviews Comments:Based on plans dated 3/21/16. 1. Fire flow test required before final approval. 2. Extend the road behind Target to allow for fire hydrant access, or add a new hydrant within 400' per travel way. 3. Please add a note to the plans "Knox box required, please contact Albemarle County Fire Marshal for location" Division: Page:1 of 2 County of Albemarle Printed On:June 20, 2018 Date Completed:05/04/2016 Reviewer:Alexander Morrison ACSA Review Status:Requested Changes Reviews Comments:JT, I have reviewed the above referenced application and have the following comments: • Construction plans will be required at the final site plan stage. Submit 3 copies along with a water data sheet to the ACSA, Attn: Michael Vieira, PE, to begin the process. • Change the proposed sewer connection so the angle with the existing flow is 90 degrees or greater. • Extend the water main with 4” DIP and a BOA near the proposed meter location. • Have Fire/Rescue confirm if FHA# 12072 will suffice for fire protection (due to access outside of the travel way). • Relocate the proposed grease interceptor outside of the drive-thru lane. Division: Date Completed:05/04/2016 Reviewer:Joel DeNunzio VDOT Review Status:No Objection Reviews Comments: Division: Date Completed:05/13/2016 Reviewer:Johnathan Newberry CDD Planning Review Status:Approved Reviews Comments: Division: Page:2 of 2 County of Albemarle Printed On:June 20, 2018 A of A ®ice z � -w COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 May 5,2016 Justin Shimp 102 E Main St., Suite M Charlottesville,VA 22902 j ustingshimp-engineering.com RE: SDP201600017 Hollymead Town Center Bojangles—Initial Site Development Plan Dear Mr. Shimp: The Site Review Committee has reviewed the development proposal referenced above. Initial comments for the following divisions of the Department of Community Development and other agencies, as applicable,are attached: Albemarle County Planning Services (Planner) Albemarle County Engineering Services (Engineer) Albemarle County Information Services(E911) Albemarle County Building Inspections Albemarle County Architectural Review Board Albemarle County Department of Fire Rescue Albemarle County Service Authority Virginia Department of Transportation Virginia Department of Health Comments reflect information available at the time the development proposal was reviewed,and should not be considered final. However,the Site Review Committee has attempted to identify all issues that will be required to be resolved prior to Final Site Plan approval.The Lead Reviewer will either approve with conditions or deny the Initial Site Plan within 15 days of the Site Review Meeting. Please contact me at your earliest convenience if you have questions or require additional information. Sincerely, J.T.Newberry Planner CC: Hollymead 29,LLC 195 Riverbend Drive Charlottesville,VA 22911 X72. S• Z. n ia►no0.ys Z. n, 0((i Art,- i-tmeow± tan A Albemarle County Planning Services(Planner)—J.T.Newberry,jnewberryAalbemarle.org 1. [Proffers for ZMA200100020/Code of Development]—There appears to be significant differences between the proposal and ZMA200100020.The Zoning Division will need to confirm the proposed restaurant is in"general accord"with the Proffers and Code of Development Narrative.For example, how does the proposal address the deck shown on page 3 and following statement on page 6: "The structure on the front site(lot one)will accommodate a casual dining restaurant with a deck overlooking the pond."This is one feature that is shown on the application plan and described in the narrative(as defined in Proffer 1). 2. Section 32.5.2(a)—On Sheet C l,please describe the proposed use as a"Restaurant with Drive- Through Window and Offsite Travelway." 3. Section 32.5.2(a)—On Sheet Cl,please note this parcel lies in the Entrance Corridor(EC)and Airport Impact(AI)Overlay districts. 4. Section 32.5.2(f)—On Sheet Cl,please add to the watershed note that the Powell Creek Watershed does not drain to a public water supply reservoir. 5. Section 32.5.2(p)—Submit a landscape plan to comply with Section 32.7.9.2(b). 6. Section 5.1.60(a)—Please label the drive-through window. 7. Section 5.1.60(b)—It is not clear from the conceptual landscaping plan that this section is satisfied. 8. Section 4.12.8(e)and 4.12.10—A shared parking agreement according to this section must be approved prior to final site plan approval. 9. [Comment] Please correct the scale on Sheet C4. 10. [Comment] Sidewalks will need to be provided as shown in the Application Plan prior to final site plan approval. Albemarle County Engineering Services(Engineer)—Max Greene,mgreeneAalbemarle.org 1. Planting plan does not have a scale or North Arrow on the sheet. Appears to be 1:20 scale. (18-32.5.2) 2. 16'parking spaces require a 2'unobstructed overhang.(18-4.12.16.c.6) Planting plan appears to show proposed plantings in this area. 3. Road plans will be required for thru-road construction. Road will be built and accepted into the system or bonded prior to final site plan approval.(18-32.7.2.2) 4. Easement plat will be required for road across adjacent parcel. 5. Approved VSMP plans will be required prior to final site plan approval. (18-32.7.4.1) 6. Gutters shall be required where necessary to control or direct stormwater runoff. (18-4.12.15.g) Albemarle County Information Services(E911)—Andy Slack,aslackAalbemarle.org—No objection Albemarle County Building Inspections,Jay Schlothauer,ischloth@albemarle.org—No objection Albemarle County Architectural Review Board—Margaret Maliszewski,mmaliszewski(2i albemarle.org—See attached Virginia Department of Transportation—Joel DeNunzio,Joel.DeNunzio@VDOT.virginia.gov—No objection Albemarle County Department of Fire Rescue—Robbie Gilmer,rgilmerAalbemarle.org 1. Fire flow test required before final approval. 2. Extend the road behind Target to allow for fire hydrant access,or add a new hydrant within 400'per travel way. 3. Please add a note to the plans" Knox Box required,contact Albemarle County Fire Marshal office for location." Albemarle County Service Authority—Alex Morrison,amorrison@serviceauthority.org 1. Construction plans will be required at the final site plan stage. Submit 3 copies along with a water data sheet to the ACSA,Attn: Michael Vieira,PE,to begin the process. 2. Change the proposed sewer connection so the angle with the existing flow is 90 degrees or greater. 3. Extend the water main with 4"DIP and a BOA near the proposed meter location. 4. Have Fire/Rescue confirm if FHA# 12072 will suffice for fire protection(due to access outside of the travel way). I, ,,tiy� ... r 5. Relocate the proposed grease interceptor outside of the drive-thru lane. Virginia Department of Health—Alan Mazurowski,Alan.Mazurowski@u,vdh.virginia.gov A food service permit will be required,and I recommend the operator begin the Food Service Plan Review process with the Charlottesville/Albemarle Health Department before beginning construction. 1. Food Service Plan Review Approval 2. Issuance of Food Service Permit Veer '411011r p@ A IA MEMORANDUM TO: Johnathan Newberry FROM: Margaret Maliszewski RE: SDP-2016-17: Bojangle's Restaurant at Hollymead DATE: April 22,2016 Based on the ARB's December 21,2015 action on ARB-2015-112: Bojangle's,I'm forwarding the following recommendations on SDP-2016-17. Regarding requirements to satisfy the design guidelines as per§ 18-30.6.4c(2),(3)and(5) and recommended conditions of initial plan approval: A Certificate of Appropriateness is required prior to final site plan approval. Revised drawings addressing the following issues are required. 1. Add the standard window glass note to the architectural drawings: Window glass in the Entrance Corridors should meet the following criteria: Visible light transmittance(VLT)shall not drop below 40%. Visible light reflectance(VLR)shall not exceed 30%. 2. Show the locations of rooftop and ground-mounted equipment on the plans and architectural elevations. Show how the equipment will be screened from view. 3. Provide additional trees and shrubs to mitigate the impacts of the drive-thru lane on the north side of the site as viewed from the EC. 4. Revise the plan to make the plants in the landscape easement legible,and to identify on the plan and in the schedule all proposed plants north of the parcel. 5. Clarify with a note(s)on the plan that all of the planting proposed on the pond parcel will be completed with the construction of the Boj angle's development. 6. Label all drive-thru related elements on the plan. 7. Revise the color of the rainguard to a more neutral shade. Bronze would be appropriate. 8. Provide details on the size and finishes of all the drive-thru related equipment. 9. Revise the plan to include a treatment for the manhole and headwall that establishes an appropriate appearance for the EC. Provide details.Treatment shall not be limited to landscaping. Coordinate this treatment with the existing and proposed walls and landscaping. 10. Add the standard mechanical equipment note to both the site and architectural drawings. "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated." 11. Provide a complete lighting plan for review. Match new fixtures to existing fixtures in the shopping center. 12. Revise the rainguard to eliminate views of its light fixture. 13. Increase the proportion of shrubs in the shrub/perennial planting along the EC frontage. 14. Shift the shrub groups to screen the parking spaces and drive-thru lane that front the corridor. 15. Terrace retaining walls 6' in height or taller, or show why the terracing isn't necessary to establish an appropriate appearance along the EC. Sore N‘eolie L. COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Fuad Culpeper Vdgrma 22701 Charles A.Kilpatrick,P.E. Commissioner April 29, 2016 Mr.Johnathan Newberry County of Albemarle Department of Community Development 401 McIntire Road Charlottesville,VA 22902 Re: SP-2016-00017 Bojangles Restaurant at Hollymead Town Center Dear Mr. Newberry: We have reviewed the initial site plan dated March 21, 2016 for Hollymead Town Center Bojangles and offer the following comments: VDOT has no objection/comments to the proposed initial site plan as submitted. Sincerely 9D0e eNunzio P.E. ent Engineer VDOT Charlottesville Residency WE KEEP VIRGINIA MOVING Johnathan Newberry From: Alexander Morrison <amorrison@serviceauthority.org> Sent: Wednesday, May 04, 2016 11:32 AM To: Johnathan Newberry Subject: SDP201600017: Hollymead Towncenter Bojangles- Initial Site Plan JT, I have reviewed the above referenced application and have the following comments: • Construction plans will be required at the final site plan stage. Submit 3 copies along with a water data sheet to the ACSA,Attn: Michael Vieira, PE,to begin the process. • Change the proposed sewer connection so the angle with the existing flow is 90 degrees or greater. • Extend the water main with 4" DIP and a BOA near the proposed meter location. • Have Fire/Rescue confirm if FHA# 12072 will suffice for fire protection (due to access outside of the travel way). • Relocate the proposed grease interceptor outside of the drive-thru lane. Alexander J. Morrison,P.E. Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville,Virginia 22911 (0)434-977-4511 Ext. 116 (C)434-981-5577 (F)434-979-0698 1 Johnathan Newberry From: Robbie Gilmer Sent: Tuesday, May 03, 2016 11:01 AM To: Johnathan Newberry Subject: SDP2016-00017 Hollymead Town Center Bojangles J.T. Please find my comments listed below, I've also added my comments to CV. Based on plans dated 3/21/16. 1. Fire flow test required before final approval. 2. Extend the road behind Target to allow for fire hydrant access,or add a new hydrant within 400' per travel way. 3. Please add a note to the plans"Knox box required, please contact Albemarle County Fire Marshal for location" THANK YOU, ROBERT GILMER, CFEI CAPT/ASSIST FIRE MARSHAL ALBEMARLE COUNTY FIRE RESCUE 460 STAGECOACH ROAD CHARLOTTESVILLE, VA. 22902 OFFICE 434-296-5833 CELL 434-531-6606 ‘kirood *44`40.04 A 140%1 I 114491", wl MEMORANDUM TO: File FROM: Margaret Maliszewski RE: ngle's initial .- DATE: April 29,2016 Based on the ARB's December 21,2015 action on ARB-2015-112: Bojangle's, the Initial Plan action is as follows: Regarding requirements to satisfy the design guidelines as per§ 18-30.6.4c(2),(3)and(5)and recommended conditions of initial plan approval: A Certificate of Appropriateness is required prior to final site plan approval. Revised drawings addressing the following issues are required. 1. Add the standard window glass note to the architectural drawings: Window glass in the Entrance Corridors should meet the following criteria: Visible light transmittance(VL7)shall not drop below 40%. Visible light reflectance(VLR)shall not exceed 30%. 2. Show the locations of rooftop and ground-mounted equipment on the plans and architectural elevations. Show how the equipment will be screened from view. 3. Provide additional trees and shrubs to mitigate the impacts of the drive-thru lane on the north side of the site as viewed from the EC. 4. Revise the plan to make the plants in the landscape easement legible,and to identify on the plan and in the schedule all proposed plants north of the parcel. 5. Clarify with a note(s)on the plan that all of the planting proposed on the pond parcel will be completed with the construction of the Bojangle's development. 6. Label all drive-thru related elements on the plan. 7. Revise the color of the rainguard to a more neutral shade. Bronze would be appropriate. 8. Provide details on the size and finishes of all the drive-thru related equipment. 9. Revise the plan to include a treatment for the manhole and headwall that establishes an appropriate appearance for the EC.Provide details.Treatment shall not be limited to landscaping.Coordinate this treatment with the existing and proposed walls and landscaping. 10. Add the standard mechanical equipment note to both the site and architectural drawings. "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated." 11. Provide a complete lighting plan for review.Match new fixtures to existing fixtures in the shopping center. 12. Revise the rainguard to eliminate views of its light fixture. 13. Increase the proportion of shrubs in the shrub/perennial planting along the EC frontage. 14. Shift the shrub groups to screen the parking spaces and drive-thru lane that front the corridor. 15. Terrace retaining walls 6' in height or taller,or show why the terracing isn't necessary to establish an appropriate appearance along the EC. ..r Johnathan Newberry From: Mazurowski, Alan (VDH) <Alan.Mazurowski@vdh.virginia.gov> Sent: Thursday, April 28, 2016 3:21 PM To: Johnathan Newberry Subject: Hollymead Town Center Bojangles; Item #: SDP201600017 Mr. Newberry, As requested by your department, I have reviewed the 3-21-16 Initial Site Development Plan for Hollymead Town Center Bojangles for compliance with VDH regulations. The plan indicates that the proposed construction is to be connected to public water and sewer systems, so I have no comments or concerns in that regard. A food service permit will be required, and I recommend the operator begin the Food Service Plan Review process with the Charlottesville/Albemarle Health Department before beginning construction. Recommendation: Approval Conditions: 1. Food Service Plan Review Approval 2. Issuance of Food Service Permit Please let me know if you have any questions. Alan Alan Mazurowski Environmental Health Supervisor Thomas Jefferson Health District 1138 Rose Hill Drive Charlottesville,VA 22903 434-972-4306 office 434-972-4310 fax 1