Loading...
HomeMy WebLinkAboutSDP201700066 Review Comments Initial Site Plan 2018-02-07Short Review Comments Report for: SDP201700066 SubApplication Type: AVINITY ESTATES-INITIAL Initial Site Plan Date Completed:02/13/2018 Reviewer:Michael Dellinger CDD Inspections Review Status:No Objection Reviews Comments: Division: Date Completed:12/18/2017 Reviewer:Tim Padalino CDD Planning Review Status:Requested Changes Reviews Comments:Requested changes; review comments available in LaserFiche. Division: Date Completed:12/14/2017 Reviewer:Matthew Wentland CDD Engineering Review Status:See Recommendations Reviews Comments:1. The approved Road plans and WPO plans will need to be amended to reflect the revised layout prior to Final Site Plan approval. 2. Provide a copy of the recorded plat showing the 25' wide section of Pebble Drive ROW owned by the applicant. Division: Date Completed:11/21/2017 Reviewer:Michael Dellinger CDD Inspections Review Status:See Recommendations Reviews Comments:Separate building permits needed for any retaining wall over 3' in height, engineered design on walls over 4' in height. Use county inspectors or approved third party inspector for inspections. mad. Division: Date Completed:11/16/2017 Reviewer:Elise Kiewra CDD E911 Review Status:No Objection Reviews Comments:per site plan dated 11/6/17 Division: Date Completed:11/28/2017 Reviewer:Adam Moore VDOT Review Status:No Objection Reviews Comments: Division: Date Completed:12/21/2017 Reviewer:Alexander Morrison ACSA Review Status:See Recommendations Reviews Comments:I hereby recommend approval with the following condition for the final site plan: • Water and sewer construction plan review is required. Submit 3 copies of the plan, along with water and sewer data sheets to the ACSA, Attn: Alexander J. Morrison, PE, to begin the review. • RWSA Capacity Certification may be required for this development. If required, the ACSA will submit this request to RWSA during the review. Division: Date Completed:11/22/2017 Reviewer:Shawn Maddox Fire Rescue Review Status:No Objection Division: Page:1 of 6 County of Albemarle Printed On:June 23, 2018 Review Status:No Objection Reviews Comments:Fire Rescue has no objections. A fire flow test will be required before final acceptance. SNM Date Completed:01/10/2018 Reviewer:Heather McMahon CDD ARB Review Status:Requested Changes Reviews Comments:b. ARB-2017-94: Avinity Estates II Initial Site Plan - Initial Site Development Plan (TM/Parcels 091000000016C0, 091000000016E0, 091000000016A0) Proposal: To construct a residential development with 51 single-family attached units, 51 townhouse units, and one clubhouse on combined 11.886 acres Location: North of Pebble Drive, west of Route 20 (Scottsville Road), south of the Kappa Sigma headquarters, and east of the original Avinity development that fronts Avon Street Extended Motion: Mr. Van Der Werf moved to forward the recommendations outlined in the staff report to the Agent for the Site Review Committee, as follows: • Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c(2), (3) and (5) and recommended conditions of initial plan approval: 1. Prior to initial plan approval revise the plan as follows: a) Revise the shape of the SWMF pond to be more naturalistic. b) Relocate the access road to the west side of the SWMF and show it consistently throughout the site plan set. c) Show the power line easement on the plans. Show utilities and associated easements on the landscape plan. d) Create a denser, more naturalistic vegetative cover along the EC frontage to screen the SWMF from the EC and integrate it into the surroundings. Provide a quantity of large shade trees along the EC frontage equivalent to 35’ on center, 3.5” caliper at planting. Add small trees and shrubs layered among the large trees. Increase planting area (open space) to accommodate this planting free of utilities and easements. e) Make the width of the landscape buffer consistent throughout the site plan set. f) Provide landscaping consistent with the application plan, free of utilities and easements. g) Show the fence and trees that are proposed along Pebble Drive. h) Revise the site configuration to minimize or screen the retaining walls. i) Show the existing trees that will remain along the EC frontage. j) Revise the geometry of the roadways to reduce visibility of pavement from the corridor. k) Revise the layout of the residential units to more fully meet the guidelines and improve their relationship to the EC. 2. A Certificate of Appropriateness is required prior to final site plan approval. • Regarding recommendations on the plan as it relates to the guidelines: None. • Regarding the final plan submittal: 1. A Certificate of Appropriateness is required prior to final site plan approval. 2. Submit all architectural elevations for the single-family attached houses and a materials palette for all proposed buildings for review. 3. Add the standard window glass note to the architectural drawings, Visible light transmittance (VLT) shall not drop below 40%. Visible light reflectance (VLR) shall not exceed 30%. Provide manufacturer’s specifications for the window glass. 4. Show proposed loading, service, refuse, and storage areas as well as mechanical equipment on the site plan set. If mechanical equipment is roof-mounted, provide roof plans. Show how the visibility of equipment will be eliminated from the EC. 5. Add the standard mechanical equipment note to the site plan set and architectural drawings, Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. 6. Submit a lighting plan with photometric values for all free-standing and wall-mounted lights as well as a lighting schedule and cut sheets for review. 7. Revise the shape of the SWMF pond to be more naturalistic. 8. Relocate the access road to the west side of the SWMF and show it consistently throughout the site plan set. 9. Show the power line easement on the plans. Show utilities and associated easements on the landscape plan. 10. Create a denser, more naturalistic vegetative cover along the EC frontage to screen the SWMF from the EC and integrate it into the surroundings. Provide a quantity of large shade trees along the EC frontage equivalent to 35’ on center, 3.5” caliper at planting. Add small trees and shrubs layered among the large trees. Increase planting area (open space) to accommodate this planting free of utilities and easements. 11. Make the width of the landscape buffer consistent throughout the site plan set. 12. Provide landscaping consistent with the application plan, free of utilities and easements. 13. Revise the spacing of street trees on interior streets within the development to 40’ o.c. 14. Rectify the plant schedule to reflect the requirement that all shrubs measure 24” in height at planting. 15. Provide perimeter and interior parking lot trees at the clubhouse parking lot, 2 ½” caliper at planting 16. Show on the plan that the tree buffers on the north and east parcel boundary lines are planted within a 10’ landscaping easement maintained by the HOA. 17. Provide additional information on the screening to be installed on the Kappa Sigma property. 18. Add the standard plant health note to the landscape plan, All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant. 19. Indicate on the plan the proposed material and color for the retaining wall and submit a sample for review. • Regarding conditions to be satisfied prior to issuance of a grading permit: 1. Revise the shape of the SWMF pond to be more naturalistic. 2. Relocate the access road to the west side of the SWMF and show it consistently throughout the site plan set. 3. Show the power line easement on the plans. Show utilities and associated easements on the landscape plan. 4. Create a denser, more naturalistic vegetative cover along the EC frontage to screen the SWMF from the EC and integrate it into the surroundings. Provide a quantity of large shade trees along the EC frontage equivalent to 35’ on center, 3.5” caliper at planting. Add small trees and shrubs layered among the large trees. Increase planting area (open space) to accommodate this planting free of utilities and easements. 5. Make the width of the landscape buffer consistent throughout the site plan set. 6. Provide landscaping consistent with the application plan, free of utilities and easements. Mr. Binsted seconded the motion. The motion carried by a vote of 5:0. Division: Page:2 of 6 County of Albemarle Printed On:June 23, 2018 landscape plan. 10. Create a denser, more naturalistic vegetative cover along the EC frontage to screen the SWMF from the EC and integrate it into the surroundings. Provide a quantity of large shade trees along the EC frontage equivalent to 35’ on center, 3.5” caliper at planting. Add small trees and shrubs layered among the large trees. Increase planting area (open space) to accommodate this planting free of utilities and easements. 11. Make the width of the landscape buffer consistent throughout the site plan set. 12. Provide landscaping consistent with the application plan, free of utilities and easements. 13. Revise the spacing of street trees on interior streets within the development to 40’ o.c. 14. Rectify the plant schedule to reflect the requirement that all shrubs measure 24” in height at planting. 15. Provide perimeter and interior parking lot trees at the clubhouse parking lot, 2 ½” caliper at planting 16. Show on the plan that the tree buffers on the north and east parcel boundary lines are planted within a 10’ landscaping easement maintained by the HOA. 17. Provide additional information on the screening to be installed on the Kappa Sigma property. 18. Add the standard plant health note to the landscape plan, All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant. 19. Indicate on the plan the proposed material and color for the retaining wall and submit a sample for review. • Regarding conditions to be satisfied prior to issuance of a grading permit: 1. Revise the shape of the SWMF pond to be more naturalistic. 2. Relocate the access road to the west side of the SWMF and show it consistently throughout the site plan set. 3. Show the power line easement on the plans. Show utilities and associated easements on the landscape plan. 4. Create a denser, more naturalistic vegetative cover along the EC frontage to screen the SWMF from the EC and integrate it into the surroundings. Provide a quantity of large shade trees along the EC frontage equivalent to 35’ on center, 3.5” caliper at planting. Add small trees and shrubs layered among the large trees. Increase planting area (open space) to accommodate this planting free of utilities and easements. 5. Make the width of the landscape buffer consistent throughout the site plan set. 6. Provide landscaping consistent with the application plan, free of utilities and easements. Mr. Binsted seconded the motion. The motion carried by a vote of 5:0. Date Completed: Reviewer:Victoria Fort RWSA Review Status:Pending Reviews Comments: Division: Date Completed:12/18/2017 Reviewer: Health Department Review Status:No Objection Reviews Comments: Division: Date Completed:02/06/2018 Reviewer:Tim Padalino CDD Planning Review Status:Administrative Approval Reviews Comments:The agent has granted administrative approval of the Initial Site Plans (original submittal - dated 11/6/2017), with conditions. The approval letter (with accompanying information) is available on Laserfiche. Division: Date Completed:03/07/2018 Tim Padalino Page:3 of 6 County of Albemarle Printed On:June 23, 2018 Reviewer:Tim Padalino CDD Planning Review Status:Approved Reviews Comments:Variation Request #1 - Request to reduce Landscaping Maintenance and Access Easement from ten (10) feet to six (6) feet (pursuant to Z.O. 8.5.5.3-(a)-5). Division: Date Completed:03/07/2018 Reviewer:Tim Padalino CDD Planning Review Status:Approved Reviews Comments:Variation Request #2 - Request to reduce the minimum front yard setback from eighteen (18) feet to six (6) feet, but still requiring a minimum of eighteen (18) feet for all areas between the sidewalk and the garage (pursuant to Z.O. 8.5.5.3-(a)-1). Division: Date Completed:02/07/2018 Reviewer:Matthew Wentland CDD Engineering Review Status:See Recommendations Reviews Comments:2/7/18 Tim notified plan does not need to be reviewed Division: Date Completed:02/07/2018 Reviewer:Elise Kiewra CDD E911 Review Status:No Objection Reviews Comments:per site plan dated 1/22/18 Division: Date Completed:02/07/2018 Reviewer:Adam Moore VDOT Review Status:Pending Reviews Comments: Division: Date Completed:02/07/2018 Reviewer:Richard Nelson ACSA Review Status:Pending Reviews Comments: Division: Date Completed:02/07/2018 Reviewer:Shawn Maddox Fire Rescue Review Status:No Objection Reviews Comments:Comments on private streets will be deferred to the final site plan. Division: Date Completed:02/06/2018 Reviewer:Heather McMahon CDD ARB Review Status:No Objection Reviews Comments:The ARB reviewed the Avinity Estates Initial Site Plan on January 8, 2018 and conducted a work session on the proposal on January 16, 2018. Based on the ARB’s actions in those meetings, staff recommends no objection to the Initial Plan. The final site plan submittal shall address all the conditions outlined in the January 8 meeting, and shall include the layout and landscaping exhibited and discussed at the January 16 work session. The January 8 conditions are as follows: • Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c(2), (3) and (5) and recommended conditions of initial plan approval: 1. Prior to initial plan approval revise the plan as follows: a) Revise the shape of the SWMF pond to be more naturalistic. b) Relocate the access road to the west side of the SWMF and show it consistently throughout the site plan set. c) Show the power line easement on the plans. Show utilities and associated easements on the landscape plan. d) Create a denser, more naturalistic vegetative cover along the EC frontage to screen the SWMF from the EC and integrate it into the surroundings. Provide a quantity of large shade trees along the EC frontage equivalent to 35’ on center, 3.5” caliper at planting. Add small trees and shrubs layered among the large trees. Increase planting area (open space) to accommodate this planting free of utilities and easements. e) Make the width of the landscape buffer consistent throughout the site plan set. f) Provide landscaping consistent with the application plan, free of utilities and easements. g) Show the fence and trees that are proposed along Pebble Drive. h) Revise the site configuration to minimize or screen the retaining walls. i) Show the existing trees that will remain along the EC frontage. j) Revise the geometry of the roadways to reduce visibility of pavement from the corridor. k) Revise the layout of the residential units to more fully meet the guidelines and improve their relationship to the EC. 2. A Certificate of Appropriateness is required prior to final site plan approval. • Regarding recommendations on the plan as it relates to the guidelines: None. • Regarding the final plan submittal: 1. A Certificate of Appropriateness is required prior to final site plan approval. 2. Submit all architectural elevations for the single-family attached houses and a materials palette for all proposed buildings for review. 3. Add the standard window glass note to the architectural drawings, Visible light transmittance (VLT) shall not drop below 40%. Visible light reflectance (VLR) shall not exceed 30%. Provide manufacturer’s specifications for the window glass. 4. Show proposed loading, service, refuse, and storage areas as well as mechanical equipment on the site plan set. If mechanical equipment is roof-mounted, provide roof plans. Show how the visibility of equipment will be eliminated from the EC. 5. Add the standard mechanical equipment note to the site plan set and architectural drawings, Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. 6. Submit a lighting plan with photometric values for all free-standing and wall-mounted lights as well as a lighting schedule and cut sheets for review. 7. Revise the shape of the SWMF pond to be more naturalistic. 8. Relocate the access road to the west side of the SWMF and show it consistently throughout the site plan set. 9. Show the power line easement on the plans. Show utilities and associated easements on the landscape plan. 10. Create a denser, more naturalistic vegetative cover along the EC frontage to screen the SWMF from the EC and integrate it into the surroundings. Provide a quantity of large shade trees along the EC frontage equivalent to 35’ on center, 3.5” caliper at planting. Add small trees and shrubs layered among the large trees. Increase planting area (open space) to accommodate this planting free of utilities and easements. 11. Make the width of the landscape buffer consistent throughout the site plan set. 12. Provide landscaping consistent with the application plan, free of utilities and easements. 13. Revise the spacing of street trees on interior streets within the development to 40’ o.c. 14. Rectify the plant schedule to reflect the requirement that all shrubs measure 24” in height at planting. 15. Provide perimeter and interior parking lot trees at the clubhouse parking lot, 2 ½” caliper at planting 16. Show on the plan that the tree buffers on the north and east parcel boundary lines are planted within a 10’ landscaping easement maintained by the HOA. 17. Provide additional information on the screening to be installed on the Kappa Sigma property. 18. Add the standard plant health note to the landscape plan, All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant. 19. Indicate on the plan the proposed material and color for the retaining wall and submit a sample for review. • Regarding conditions to be satisfied prior to issuance of a grading permit: 1. Revise the shape of the SWMF pond to be more naturalistic. 2. Relocate the access road to the west side of the SWMF and show it consistently throughout the site plan set. 3. Show the power line easement on the plans. Show utilities and associated easements on the landscape plan. 4. Create a denser, more naturalistic vegetative cover along the EC frontage to screen the SWMF from the EC and integrate it into the surroundings. Provide a quantity of large shade trees along the EC frontage equivalent to 35’ on center, 3.5” caliper at planting. Add small trees and shrubs layered among the large trees. Increase planting area (open space) to accommodate this planting free of utilities and easements. 5. Make the width of the landscape buffer consistent throughout the site plan set. 6. Provide landscaping consistent with the application plan, free of utilities and easements. Division: Page:4 of 6 County of Albemarle Printed On:June 23, 2018 layered among the large trees. Increase planting area (open space) to accommodate this planting free of utilities and easements. e) Make the width of the landscape buffer consistent throughout the site plan set. f) Provide landscaping consistent with the application plan, free of utilities and easements. g) Show the fence and trees that are proposed along Pebble Drive. h) Revise the site configuration to minimize or screen the retaining walls. i) Show the existing trees that will remain along the EC frontage. j) Revise the geometry of the roadways to reduce visibility of pavement from the corridor. k) Revise the layout of the residential units to more fully meet the guidelines and improve their relationship to the EC. 2. A Certificate of Appropriateness is required prior to final site plan approval. • Regarding recommendations on the plan as it relates to the guidelines: None. • Regarding the final plan submittal: 1. A Certificate of Appropriateness is required prior to final site plan approval. 2. Submit all architectural elevations for the single-family attached houses and a materials palette for all proposed buildings for review. 3. Add the standard window glass note to the architectural drawings, Visible light transmittance (VLT) shall not drop below 40%. Visible light reflectance (VLR) shall not exceed 30%. Provide manufacturer’s specifications for the window glass. 4. Show proposed loading, service, refuse, and storage areas as well as mechanical equipment on the site plan set. If mechanical equipment is roof-mounted, provide roof plans. Show how the visibility of equipment will be eliminated from the EC. 5. Add the standard mechanical equipment note to the site plan set and architectural drawings, Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. 6. Submit a lighting plan with photometric values for all free-standing and wall-mounted lights as well as a lighting schedule and cut sheets for review. 7. Revise the shape of the SWMF pond to be more naturalistic. 8. Relocate the access road to the west side of the SWMF and show it consistently throughout the site plan set. 9. Show the power line easement on the plans. Show utilities and associated easements on the landscape plan. 10. Create a denser, more naturalistic vegetative cover along the EC frontage to screen the SWMF from the EC and integrate it into the surroundings. Provide a quantity of large shade trees along the EC frontage equivalent to 35’ on center, 3.5” caliper at planting. Add small trees and shrubs layered among the large trees. Increase planting area (open space) to accommodate this planting free of utilities and easements. 11. Make the width of the landscape buffer consistent throughout the site plan set. 12. Provide landscaping consistent with the application plan, free of utilities and easements. 13. Revise the spacing of street trees on interior streets within the development to 40’ o.c. 14. Rectify the plant schedule to reflect the requirement that all shrubs measure 24” in height at planting. 15. Provide perimeter and interior parking lot trees at the clubhouse parking lot, 2 ½” caliper at planting 16. Show on the plan that the tree buffers on the north and east parcel boundary lines are planted within a 10’ landscaping easement maintained by the HOA. 17. Provide additional information on the screening to be installed on the Kappa Sigma property. 18. Add the standard plant health note to the landscape plan, All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant. 19. Indicate on the plan the proposed material and color for the retaining wall and submit a sample for review. • Regarding conditions to be satisfied prior to issuance of a grading permit: 1. Revise the shape of the SWMF pond to be more naturalistic. 2. Relocate the access road to the west side of the SWMF and show it consistently throughout the site plan set. 3. Show the power line easement on the plans. Show utilities and associated easements on the landscape plan. 4. Create a denser, more naturalistic vegetative cover along the EC frontage to screen the SWMF from the EC and integrate it into the surroundings. Provide a quantity of large shade trees along the EC frontage equivalent to 35’ on center, 3.5” caliper at planting. Add small trees and shrubs layered among the large trees. Increase planting area (open space) to accommodate this planting free of utilities and easements. 5. Make the width of the landscape buffer consistent throughout the site plan set. 6. Provide landscaping consistent with the application plan, free of utilities and easements. Page:5 of 6 County of Albemarle Printed On:June 23, 2018 SWMF from the EC and integrate it into the surroundings. Provide a quantity of large shade trees along the EC frontage equivalent to 35’ on center, 3.5” caliper at planting. Add small trees and shrubs layered among the large trees. Increase planting area (open space) to accommodate this planting free of utilities and easements. 5. Make the width of the landscape buffer consistent throughout the site plan set. 6. Provide landscaping consistent with the application plan, free of utilities and easements. Date Completed:02/07/2018 Reviewer:Victoria Fort RWSA Review Status:Pending Reviews Comments: Division: Page:6 of 6 County of Albemarle Printed On:June 23, 2018 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 December 18, 2017 Mr. Scott R. Collins, P.E. — President, Collins Engineering 200 Garrett Street, Suite K, Charlottesville, VA 22902 (434)-293-3719 / scottkcollins-en ing eering com Riverbend Development, Inc. — c/o Mr. Alan Taylor 455 2nd Street SE, Suite 400, Charlottesville, VA 22902 (434)-245-4970 / alan@riverbenddev.com RE: SDP -2017-00066 (Avinity Estates Initial Site Plan) Dear Mr. Collins: Fax (434)972-4126 The Planner for the Planning Division of the Albemarle County Community Development Department (CDD) and other members of the Site Review Committee (SRC) have reviewed the development proposal referenced above. Initial review comments from the following SRC members are attached: Albemarle County Planning Services (Planner) Albemarle County Architectural Review Board (ARB) — PENDING Albemarle County Engineering Services (Engineer) — (attached) Albemarle County Information Services (E911) — (attached) Albemarle County Building Inspections — (attached) Albemarle County Department of Fire Rescue — (attached) Albemarle County Service Authority (ACSA) — PENDING Virginia Department of Transportation (VDOT) — (attached) Virginia Department of Health (VDH) — (attached) The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed. Each comment is preceded by the applicable reference to Chapter 18 of the Albemarle County Code (Zoning Ordinance) unless otherwise specified. (The following comments are those that have been identified at this time; additional comments may be added or eliminated based on further review.) The Lead Reviewer will either approve with conditions or deny the Initial Site Plan within 15 days of the Site Review Meeting. Please contact me at your earliest convenience if you have questions, or require additional information or assistance. Sincerely, pa'�� Tim Pad i o, AICP Senior Planner / ttadalino@albemarle.org / (434)-296-5832 x 3088 Albemarle County Planning Services (Planner) — Tim Padalino, tpadalino e,albemarle.org — Requested Changes: [Application Plan (ZMA201300016)]: The Bergen Street right of way (ROW) must be extended to the property boundary to the south for future interparcel connection. The Application Plan shows a ROW width of forty-two (42) feet to the property line; at a minimum, this extended ROW must be thirty-seven (37) feet in width — the same dimension that is shown on this initial site plan for Bergen Street and which is specified in the "Typical Road Sections" on Sheet 7. The area in question is currently shown as "open space ... for possible future interconnection" and is shown with a width of approximately thirty-four (34) feet. Please revise the plans to achieve General Accord with the Application Plan. 2. [Application Plan (ZMA201300016)]: The Application Plan requirement to extend the Bergen Street ROW to the property boundary to the south does not allow for the placement of the two (2) parking spaces shown on the southern side of Moffat Street at the T -intersection with Bergen Street. In conjunction with revising the plans to extend the Bergen Street ROW to the property boundary to the south, please also relocate those two (2) proposed parking spaces to a different location within Avinity Estates. 3. [Application Plan (ZMA201300016)]: The Moffatt Street ROW must be extended to the property line for a possible interconnection with the future development of the parcel to the west. Please revise drawings and notes on Sheet 3A as necessary, or otherwise clarify that the Moffatt Street ROW extends to the boundary with TMP 90-35B. This extended ROW must be thirty-seven (37) feet in width — the same dimension that is shown on this initial site plan for Moffatt Street and which is specified in the "Typical Road Sections" on Sheet 7. 4. [Application Plan (ZMA201300016)]: A wooden fence with a height of eight (8) feet must be installed (approximately) five (5) feet from the rear property line of the proposed lots along the boundary line of the Kappa Sigma property; and landscaping comprised of a staggered line of deciduous and evergreen trees must be installed along the same property line. Sheet 3 proposes a "wooden fence on the boundary line of the Kappa Sigma property" with screening "installed with this plan on the Kappa Sigma property." Please revise the location of the wooden fence and landscaping to be in general accord with the Application Plan. 5. [Application Plan (ZMA201300016)]: Garages must be setback a minimum of three (3) feet from the front fagade or front porch. Note 2 on Sheet 3 states that "Units shall have a porch that will extend 3' past the garages;" however, the drawings show garages flush with the front fagade/porch (zero setback) on Lots 1-13 as well as Lots 24-60. Please revise the plans to satisfy this setback requirement and/or provide dimensions to demonstrate that this minimum setback requirement is satisfied. 6. [Application Plan (ZMA201300016)]: Please clearly demonstrate that all requirements for public amenities are satisfied. Specifically, please identify the location of the "16,550 SF active recreation grass courtyard" or otherwise demonstrate that the required 11,500 SF area for active recreation grass courtyard is provided. It appears that no such "active recreation grass courtyard" is shown or annotated within the Avinity Estates project boundaries on either of the Layout & Landscaping Plan sheets (Sheets 3, 3A) or either of the Grading Plan sheets (Sheets 5, 5A). It is not acceptable to provide this required amenity "between Avinity I Phase III & IV units," as indicated in the "Amenities" notes within the "General Notes" on Sheet 1. Amenity: ZM4,201300016 Application Plan: SDP201700066 Initial Site Plan: Status: Clubhouse/Pavilion Area 1,000 SF (minimum) 1,314 SF Exceeds Tot Lot 4,000 SF (minimum) 4,000 SF Meets Dog Park 10,000 SF (minimum) 10,000 SF Meets Passive Rec. Area 6,000 SF (minimum) 20,500 SF Exceeds Active Rec. Grass Courtyard 11,500 SF (minimum) 16,550 SF Unclear? 7. [Application Plan (ZMA201300016)1: Please add a note which states that "Avinity II [or Avinity Estates] development will be added to the Avinity I HOA to establish one complete HOA, sharing all the amenities, open space, and maintenance responsibilities." This statement is included as Note 7 on the approved Application Plan, but does not appear to be included in this initial site plan. 8. [Application Plan (ZMA201300016) and 32.5.2(a)]: The "Setbacks" note within the "General Notes" on Sheet 1 proposes a six (6) foot front yard setback, and states that a request for a variation has been submitted to the County. However, no such request for a variation or special exception has been received by CDD to date. This request must be submitted to CDD and approved by the Board of Supervisors. 9. [Application Plan (ZMA201300016)]: A landscaping easement must be provided for the street trees that are located in the six (6) foot planting strip outside of the ROW. Additionally, the "Landscaping" note on the approved Application Plan states (in part) "All street trees shall be outside of the ROW within a 10' wide landscaping and maintenance easement... " however, in this initial site plan, the "Landscaping" note within the "General Notes" on Sheet 1 states (in part) "All street trees shall be outside of the ROW within a 5' wide landscaping and maintenance easement... " Please clarify and correct this discrepancy. A plat for the required ten (10) foot landscaping and maintenance easement will be required in conjunction with the final site plan. 10. [Application Plan (ZMA201300016) and 32.5.2(i)]: An access easement must be provided to give public access on the private streets, including within and through Avinity I all the way through to Avon Street. Please modify the note about "Access into Avinity ll... " on Sheet 3 to address public access through Avinity I to Avon Street. The access easement plat will be required in conjunction with the final site plan. 11. [Application Plan (ZMA201300016)]: Because the private street configuration of Moffat Street has been modified to now include cul-de-sacs at both ends, please prepare and submit revised Road Plans for review and approval. (Please refer to review comments from Mr. Matthew Wentland, CDD -Engineering.) 12. [Proffers (ZMA201300016)1: The "Setbacks" note within the "General Notes" on Sheet 1 states "Cash in lieu of affordable units will be provided." Please modify this note to specify the number of units for which cash is to be provided in lieu of providing constructed affordable dwelling units (required to be 15% of total residential units per Proffer #2). Albemarle County Engineering Services (Engineer) Matthew Wentland, mwentland@albemarle.org_— Requested Changes (12/14/2017); see attached comments. Albemarle County Department of Fire Rescue Shawn Maddox, smaddoxna-,albemarle.org — No Objection (11/22/2017); see attached comment. Albemarle County Information Services (E911) Elise Kiewra, ekiewra@albemarle.org — No Objection (11/16/2017). Albemarle County Building Inspections Michael Dellinger, mdellingerna,albemarle.org — Requested Changes (11/21/2017); see attached comments. Albemarle County Architectural Review Board (ARB) Heather McMahon, hmcmahongalbemarle.ori—Pending— ARB review scheduled for 1/8/2018; see attached comment. Albemarle County Service Authority Alex Morrison, amorrison@serviceauthority.org — Pending; review comments will be forwarded upon receipt. Virginia Department of Transportation Adam Moore, Adam.Moorekvdot.vir inia. og_v — No Objection (11/28/2017); see attached approval letter. Virginia Department of Health Alan Mazurowski, Alan. Mazurowskikvdh.vir ig�nia.og_v — No Objection (12/18/2017); see attached approval letter. Review Comments for SDP201700066 Initial Site Plan Project Name: AVINITY ESTATES -INITIAL Date Completed: Thursday, December 14, 2017 DepartmentfDivisionfAgency: Review Status: Reviewer: Matthew Wentland DDD Engineering See Recommendations Page: County of Albemarle Printed On: '121'18120'17 Review Comments for SDP201700066 11nitial Site Plan Project Name: AVINITY ESTATES -INITIAL Date Completed: Wednesday, November 22, X017 DepartmentlaivisionlAgency: Review Status: Reviewer: -Shawn Maddox Fire Rescue No Objection Page: County of Albemarle Printed On: '12'18120'17 Review Comments for SOP201700066 11nitial Site Plan Project Name: AVINITY ESTATES -INITIAL Date Completed: Thursday, November 16, 2017 Department1DivisionfAgency: Review Status: Reviewer: Elise KiewraCDD E911 No Obje-Ction Page: County of Albemarle Printed On: '12J 18120'17 Review Comments for SDP201700066 11nitial Site Plan Project Name: AVINITY ESTATES -INITIAL Date Completed: Tuesday, November 21, 2017 Department1DivisionfAgency: Review Status: rMichael Dellinger CDD Inspections See Recommendations Reviewer: � R Page: County of Albemarle Printed On: '12J 18120'17 Charles A. Kilpatrick, P.E. Commissioner COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 0601 Orange Road Culpeper. Virginia 22705 November 28, 2017 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Cameron LangiIle Re: Avinity Estates — Initial Site Plan SDP -2017-00066 Review #1 Dear Mr. Langille: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Collins Engineering, dated 6 November 2017, and find it to be generally acceptable. If further information is desired please contact Justin Deel at (434) 422-9894. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING COMMONWEALTH of VIRGINIA In Cooperation with the Thomas Jefferson Health District ALBEMARLE CHARLOTTESVILLE State Department of Health FLUVANNA COUNTY(PALMYRA)GREENE 1138 Rose Hill Drive COUNTY (STANARDSVILLE)LOUISA COUNTY(LOUISA) Phone (434) 972-6219 P O. Box 7546 NELSON COUNTY (LOVINGSTON) Fax (434) 972-4310 Charlottesville, Virginia 22906 December 18, 2017 Tim Padalino, Senior Planner Albemarle County Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Avinity Estates Initial Site Plan Review SDP2017-66 Mr. Padalino: As requested, I've reviewed the Initial Site Plan, dated November 6, 2017, for the proposed residential development, referenced above. Since the site will be served by public water and sewer systems, VDH will have no involvement. If there are any questions or concerns, please give me a call, 434-972-4306. Sincerely, Alan Mazurowski Environmental Health Supervisor Thomas Jefferson Health District alan.mazurowskikvdh.virginia. gov