December 17, 2014
Roudabush, Gale &Associates, Inc.
Attn: Mr. Chris Mulligan, P.E.
914 Monticello Road
Charlottesville, Virginia 22902
Re: Old Trail Village Block 12, Phase 1
Dear Mr. Mulligan:
The plan, entitled Old Trail Village Block 12 Phase 1 Final Site Plan, dated
August 15, 2014, last revised, December 12, 2014, is hereby approved for
construction. One set of the approved plan is enclosed for your records. Any
previously approved plans are voided with this approval. This approval is for basic
compliance with the General Water & Sewer Construction Specifications of the
Albemarle County Service Authority (ACSA) and does not relieve the contractor
from responsibility for his work as it relates to the plan and specifications.
The ACSA requires that a copy of the approved construction plan be on the
job site. The contractor is responsible for marking up a copy of the approved
construction plan showing as-built information and provide this data to your client at
the completion of utility installation. The final as-built plan shall be submitted in a
format of one paper copy and one mylar copy.
A preconstruction conference shall be scheduled with the project manager to
ensure coordination and answer any questions. This will be a short meeting to
review the project, materials, test methods and schedule, in order to expedite
construction. Please have the proper party call me at 977-4511 to schedule the
meeting.
This approval is valid for a period of 18 months from this date. If
construction is not in progress at the end of this time period, the approval shall be
void.
The contractor shall be responsible to comply with the no-lead regulation
regarding brass fittings that is effective on January 4, 2014 (Senate Bill 3874 which
amends the Safe Drinking Water Act).
168 Spotnap Road • Charlottesville, VA 22911 • Tel (434) 977-4511 • Fax (434) 979-0698
www.serviceauthority.org
(The pressure for water may exceed 80 psi at some meter locations).
If you have any questions or if we can be of assistance, please give us a call
at (434) 977-4511.
Sincerely,
Jeremy M. Lynn, P.E.
Senior Civil Engineer
JML/dbh
cc: Dave Brockman, March Mountain Properties, LLC
ACSA, Alexander J. Morrison
State Health Department RECEIVED
Va. DEQ
Current Development, Bill Fritz t JAN 2 & 20U
Bldg. Codes &Zoning Services COMMUNITY
Soil Erosion Inspector DEVELOPMENT
05060101dTrailVillageBlk12Ph1 EngApprLtrl21714