HomeMy WebLinkAboutSDP201700081 Application 2018-01-03 Albermarle Cou[�it Community Development A22902Department
401 A re
Road Charlottesville,VA 22902-4596
:(434)296-5832 Fax:(434)972-4126
41 Planning Application
PARCEL/ OWNER INFORMATION
TMP 062A1-00-OK-O0100 Owner(s): CHARLOTTESVILLE CHURCH OF THE BRETH
Application# SDP201700081
PROPERTY INFORMATION
Legal Description 1 1 IIIKNITINFIBLDS 7 K
Magisterial Dist.'Rio Land Use Primary Pubik
Current AFD Not in A/F District 1i Current Zoning Primary R2 Residential
APPLICATION INFORMATION
Street Address 1225 RIO RD E CHARLOTTESVILLE,22901Entered By
I Buck Smith
Application Type Site Developl�nent Plans 29 017
Project SHEIitTEL-69202 RIO ROAD EAST
Received Date 12/29/17 Received Date Final Submittal Date 01/03/18 Total Fees 1957
Closing File Date Submittal Date Final Total Paid 1957
Revision Number
Comments ..
Legal Ad
R•
SUB APPLICATION(s)
Sub A 1icaaao Cormrnt
Persltl'I 1111/03/18,4 3
APPLICANT /CONTACT INFORMATION
ContactType Name Address CityState Zip Phone PhoneCall
04+r o OiefOLOT UtfCH OF IKE 1225 E RID RD CHARLOTI'ESSVILL 22941
'Appicart SHENANDOAH MOBILE,LLC 4435 WATERFRONT DR,SUITE GLENN ALLEN VA 23060 8044758144
Signature of Contractor or Authorized Agent Date
*4101
Of AL%
Application for
Personal Wireless Service Facility
IMPORTANT: Your application is considered INCOMPLETE until all of the information on the
Required Application Content Checklist on pages 2 thru 6 has been submitted and the appropriate fee has been submitted.
(See page 11 for the appropriate fee(s)related to your application). Staff will assist you with these items.
PROJECT NAME:(how should we refer to this application?): Shc 4th- (ogzo2 Rio Road east-
PROPOSAL: ❑ Tier I Le Tier II ❑ Tier III ❑ Building Permit after Tier II or Tier III approval
COPIES REQUIRED: Two(2) [ Sixteen(16) Seventeen(17) Two(2)
EXISTING COMP PLAN LAND USE/DENSITY: Neiy4orhocids Z- Not 23, Net9ta0(6std tensiY Resadeinkica
LOCATION/ADDRESS OF PROPERTY FOR SPECIAL USE PERMIT: (22.55 R;o attack Eas%
TAX MAP PARCEL(s): OCIZ.Ac1-COOK- OO too
ZONING DISTRICT: RZ ' es devr1ia\
#OF ACRES TO BE COVERED BY SPECIAL USE PERMIT(if a portion it must be delineated on a plat): N fA
Is this an amendment to an existing Special Use Permit?If Yes provide that SP Number. 0 YES [yTO
Are you submitting a Special Exception to modify or waive certain requirements with this application? ❑YES [ 'Ivo
If YES,provide the modifications:
Does the owner of this property own(or have any ownership interest in)any abutting property? [ i'ES ONO
If YES,please list those tax map and parcel numbers: O(02A1- OD -OK 002.00
Applicant(whom should we contact about this project): S11CNavtdocl� t obl'k)1.-c("sl'Kvt}et')c/o Rycg Flekot ler,takc,u ..
3S W cr frovt4 D''e Suit. Ito
`c. '#-Stie4 tI
Street Address � r
City G ttn State VPs Zip Code Z30(00
Phone Number 864-475-- 111414
Email (-Fletcher@ n\x. k• corn
Owner of Record C 10 k CSVC\lker 1 o4 ere-V/den
Street Address (22S Rio 1tcad ac c.4
City Cl/w►r lb1teSV 1State VA Zip Code 22.9 0
Phone Number 1434-984- 02.7 8
Email 1\A0.' 1ee'M*ArCtria1,• 00h'1
Contractor(Building Permits and Tier I only) 1I)A
Street Address
City State Zip Code
Phone Number
Email Work Value$
FOR OFFICi U ONLY Application# SO P r d/} - 000r-I SIGN#(if an SP)
Fee Amount$L 31 Date Paid i 1•t f• 11 By who? Shun. Te IC( (.4-11 Receipt# 0.3 Q 3 Ck# � 1by:_Ufe14,Zl r4?
ZONING ORDINANCE SECTION
County of Albemarle Department of Community Development
401 McIntire Road Charlottesville,VA 22902 Voice: (434)296-5832 Fax: (434)972-4126
www.albemarle.org
REVISED 12/7/2017 Page 1 of 11
,
Personal Wireless Service Facility Application
Tiers .
' Application Requirements&Checkiist I II III
Ins uc ons an`Xt'an Applicaiion Type andicatesreyuirem ts&
Use thefar"right'column to confirm regutrements are:met
1. Application form and signatures. A completed application form,signed by the parcel owner,the X X X0
parcel owner's agent or the contract purchaser,and the proposed facility's owner.If the owner's
agent signs the application,he shall also submit written evidence of the existence and scope of the
agency.If the contract purchaser signs the application,he shall also submit the owner's written
consent to the application.
2. Plat or survey of the parcel. A recorded plat or recorded boundary survey of the parcel on which the X X X [g'
facility will be located;provided,if neither a recorded plat nor boundary survey exists,a copy of the
legal description of the parcel and the Albemarle County Circuit Court deed book and page number.
3. Ownership. The identity of the owner of the parcel and,if the owner is other than a real person,the X X X J
complete legal name of the entity,a description of the type of entity,and written documentation that
the person signing on behalf of the entity is authorized to do so.
4. Plans and supporting drawings, calculations,and documentation. Except where the facility will be
located entirely within an eligible support structure or an existing building,a scaled plan and a
scaled elevation view and other supporting drawings,calculations,and other documentation required
by the agent,signed and sealed by an appropriate licensed professional.The plans and supporting
drawings,calculations,and documentation shall show:
(a) Existing and proposed improvements. The location and dimensions of all existing and proposed X X X LJ
improvements on the parcel including access roads and structures,the location and dimensions
of significant natural features,and the maximum height above ground of the facility(also
identified in height above sea level).
(b) Elevation and coordinates. The benchmarks and datum used for elevations shall coincide with X X X
the State Plane VA South US Survey Feet based on the North American Datum of 1983(NAD
83),and the benchmarks shall be acceptable to the county engineer.
(c) Design. The design of the facility,including the specific type of support structure and the X X XEr
design,type,location,size,height,and configuration of all existing and proposed antennas and
other equipment.
(d) Color. Identification of each paint color on the facility,by manufacturer color name and color X X X
number. A paint chip or sample shall be provided for each color.
(e) Topography. Except where the facility would be attached to an eligible support structure or an X X g,,
existing building,the topography within two thousand(2,000)feet of the proposed facility,in
contour intervals not to exceed ten(10)feet for all lands within Albemarle County and,in
contour intervals shown on United States Geological Survey topographic survey maps or the
best topographic data available,for lands not within Albemarle County.
(f) Trees.The caliper and species of all trees where the dripline is located within fifty(50)feet of X X X LI
the facility.The height,caliper,and species of any tree that the applicant is relying on to
provide screening of the monopole or tower.The height,caliper and species of the reference
tree.The caliper and species of all trees that will be adversely impacted or removed during
installation or maintenance of the facility shall be noted,regardless of their distances to the
facility.
(g) Setbacks,parking,fencing, and landscaping. All existing and proposed setbacks,parking, X X X ry
fencing,and landscaping. L(
(h) Location of accessways. The location of all existing vehicular accessways and the location and X X X
design of all proposed vehicular accessways.
(i) Location of certain structures and district boundaries. Except where the facility would be X X X
attached to an eligible support structure or an existing building,residential and commercial
structures;and residential and rural areas district boundaries.
REVISED 12/7/2017 Page 2 of 11
Personal Wireless Service Facility Application
(j) Proximity to airports. If the proposed monopole or tower will be taller than one hundred fifty X X [�
(150)feet,the proximity of the facility to commercial and private airports.
5. Photographs. Photographs of the location of the proposed monopole or tower shall be provided that X X 0
include,for applications for Tier II facilities,the reference tree,and for applications for Tier III
facilities,the area within fifty(50)feet of the proposed monopole or tower.These photographs shall
include reference points to enable the lease area,the vehicular access,the trees that will remain,and
the trees that will be removed,to be identified.In addition,photographs,where possible,or
perspective drawings of the facility site and all existing facilities within two hundred(200)feet of the
site,if any,and the area surrounding the site.
6. Balloon tests. For any proposed monopole or tower,photographs taken of a balloon test,which shall
be conducted,if requested by the agent,as follows:
(a) Scheduling. The applicant shall contact the agent within ten(10)days after the date the X X 0
application was submitted to schedule a date and time when the balloon test will be conducted.
The test shall be conducted within forty(40)days after the date the application was submitted,
and the applicant shall provide the agent with at least seven(7)days prior notice;provided that
this deadline may be extended due to inclement weather or by the agreement of the applicant
and the agent.
(b) Marking key boundaries and locations. Prior to the balloon test,the locations of the access X X
road,the lease area,the tower site,the reference tree,and the tallest tree within twenty five(25)
feet of the proposed monopole shall be surveyed and staked or flagged in the field.
(c) Balloon height. The test shall consist of raising one or more balloons from the facility site to a X X
height equal to the proposed facility.
(d) Balloon color or material. The balloons shall be of a color or material that provides maximum X X 0'
visibility.
(e) Photographing balloon test. The photographs of the balloon test shall be taken from the nearest X X
residence and from appropriate locations on abutting properties,along each publicly used road
from which the balloon is visible,and other properties and locations as deemed appropriate by
the agent.The applicant shall identify the camera type,film size,and focal length of the lens for
each photograph.
7. Additions of antennas. If antennas are proposed to be added to an eligible support structure or an X X X Lr
existing building,all existing antennas and other equipment on the structure,building,or facility,as
well as all ground equipment,shall be identified by owner,type,and size.The method(s)by which
the antennas will be attached to the mounting structure shall be depicted.
8. Site under conservation or open space easement. If the proposed facility would be located on lands X X Er
subject to a conservation easement or an open space easement,a copy of the recorded deed of
easement and the express written consent of all easement holders to the proposed facility.
9. Photographic simulations.At the request of the agent,photographic simulations of the proposed X X I;2'
facility.
12. Special exception.If the proposed facility does not comply with any provision of section 5.1.40,the X X X I�
applicant shall request a special exception in writing as part of the application.The request shall
identify which regulation in section 5.1.40 for the special exception is requested and a justification
for the special exception.
REVISED 12/7/2017 Page 3 of 11
Personal Wireless Service Facility Application
--Development Requirements&Checklist I II III
Ins ructions an 'X'in Application Type indicates requirements.'
' Use;the far right column to confirm requirements are met.
1. General design. The facility shall be designed,installed,and maintained as follows:
(a) Guy wires.Guy wires are prohibited. X X X [/
(b) Outdoor lighting.Outdoor lighting for the facility shall be permitted only during maintenance periods; X X X
regardless of the lumens emitted,each outdoor luminaire shall be fully shielded as required by section
4.17;provided that these restrictions shall not apply to any outdoor lighting required by federal law.
(c) Ground equipment.Any ground equipment shelter not located within an eligible support structure or
an existing building shall be screened from all lot lines either by terrain,existing structures,existing X X X
vegetation,or by added vegetation approved by the agent.
(d) Whip antenna.A whip antenna less than six(6)inches in diameter may exceed the height of the
facility,the eligible support structure,or the existing building. X X X
(e) Grounding rod.A grounding rod,whose height shall not exceed two(2)feet and whose width shall
not exceed one(1)inch in diameter at the base and tapering to a point,may be installed at the top of X X X g,
the facility,the eligible support structure,or the existing building.
2. Antennas and associated equipment. Antennas and associated equipment that are not entirely within a X X X Q'
proposed facility,an eligible support structure,or an existing building shall be subject to the following:
(a) Number of arrays.The total number of arrays of antennas shall not exceed three(3).All types of X X X 2,
antennas and dishes,regardless of their use,shall be counted toward the limit of three arrays.
(b) Size.Each antenna proposed under the pending application shall not exceed the size shown on the X X X
application,which size shall not exceed one thousand four hundred(1400)square inches.
(c) Projection.No antenna shall project from the facility,structure or building beyond the minimum
required by the mounting equipment,and in no case shall the closest point on the back of the antenna X X X
be more than twelve(12)inches from the facility,structure,or building;and in no case shall the
farthest point of the back of the antenna be more than eighteen(18)inches from the facility,structure,
or building;and
X X X
(d) Color.Each antenna and associated equipment shall be a color that matches the facility,structure,or
building.
3. Tree conservation plan;content. Before the building official issues a building permit for the facility,the X X X
applicant shall submit a tree conservation plan prepared by a certified arborist.The plan shall be submitted
to the agent for review and approval to ensure that all applicable requirements have been satisfied.The plan
shall specify tree protection methods and procedures,identify all existing trees to be removed on the parcel
for the installation,operation and maintenance of the facility,and identify all dead and dying trees that are
recommended to be removed.In approving the plan,the agent may identify additional trees or lands up to
two hundred(200)feet from the lease area to be included in the plan.
4. Creation of slopes steeper than 2:1. No slopes associated with the installation of the facility and its X X X P
accessory uses shall be created that are steeper than 2:1 unless retaining walls,revetments,or other
stabilization measures acceptable to the county engineer are employed.
5. Ground equipment shelter;fencing. Any ground equipment shelter not located within an existing building X X X [.'
shall be fenced only with the approval of the agent upon finding that the fence:(i)would protect the facility
from trespass in areas of high volumes of vehicular or pedestrian traffic or,in the rural areas,to protect the
facility from livestock or wildlife;(ii)would not be detrimental to the character of the area;and(iii)would
not be detrimental to the public health,safety or general welfare.
REVISED 12/7/2017 Page 4 of 11
Slue v41110,
Personal Wireless Service Facility Application
Development Requirements&Checklist I II III
In ruc ions an X"in Application Type indicates requirements.
Us the far right column to confirm requirements are met.
6. Screening and siting to minimize visibility. The site shall provide adequate opportunities for screening and X X jr
the facility shall be sited to minimize its visibility from adjacent parcels and streets,regardless of their
distance from the facility.The facility also shall be sited to minimize its visibility from any entrance
corridor overlay district,state scenic river,national park,or national forest,regardless of whether the site is
adjacent to the district,river,park or forest.If the facility would be located on lands subject to a
conservation easement or an open space easement,or adjacent to a conservation easement or open space
easement,the facility shall be sited so that it is not visible from any resources specifically identified for
protection in the deed of easement.
7. Open space plan resources. The facility shall not adversely impact resources identified in the natural X X [�
resources chapter of the county's comprehensive plan and the parks and green systems chapters in any count:
master plan.
8. Horizontal separation of multiple facilities. The facility shall not be located so that it and three(3)or more X
existing or approved personal wireless service facilities would be within an area comprised of a circle
centered anywhere on the ground having a radius of two hundred(200)feet.
9. Diameter of monopole. The maximum base diameter of the monopole shall be thirty(30)inches and the X [�
maximum diameter at the top of the monopole shall be eighteen(18)inches.
10. Height of monopole. The top of the monopole,measured in elevation above mean sea level,shall not be X [�
more than ten(10)feet taller than the tallest tree within twenty-five(25)feet of the monopole,and shall
include any base,foundation or grading that raises the monopole above the pre-existing natural ground
elevation.
11. Color of monopole, antennas, and equipment. Each monopole shall be a dark brown natural or painted X X g/
wood color that blends into the surrounding trees.The antennas,supporting brackets,and all other
equipment attached to the monopole shall be a color that closely matches that of the monopole.The
ground equipment,the ground equipment shelter,and the concrete pad shall also be a color that closely
matches that of the monopole,provided that the ground equipment and the concrete pad need not closely
match the color of the monopole if they are enclosed within a ground equipment shelter or within or
behind an approved structure,facade or fencing that:(i)is a color that closely matches that of the
monopole;(ii)is consistent with the character of the area;and(iii)makes the ground equipment,ground
equipment shelter,and the concrete pad invisible at any time of year from any other parcel or a public or
private street.
12. Placement of cables,wiring, and similar attachments. Each wood or concrete monopole shall be X �J
constructed so that all cables,wiring,and similar attachments that run vertically from the ground
equipment to the antennas are placed on the monopole to face the interior of the site and away from public
view,as determined by the agent.Metal monopoles shall be constructed so that vertical cables,wiring,
and similar attachments are contained within the monopole's structure.
13. Special use permit conditions.All conditions of approval of a special use permit. X fl
REVISED 12/7/2017 Page 5 of 11
Personal Wireless Service Facility Application
A`plicability of other Development Requirements Type of
;'this`Chapter&Checklist App
tolication;
Appltca#ton Type indicates requirement* ;
. I II". :UI
Use the far right column to confirm requirements are,met.
2. Vehicular access.Vehicular access to the facility site or tower site shall be subject to the requirements of X X X [�
section 4.2 and shall not be exempt under section 4.2.6(c).
3. Setbacks.Notwithstanding section 4.10.3.1(b),the agent may authorize a facility to be located closer in X X X
distance than the height of the tower or other mounting structure to any lot line if the applicant obtains an
easement or other recordable document showing agreement between the lot owners,acceptable to the
county attorney as to addressing development on the part of the abutting parcel sharing the common lot line
that is within the monopole or tower's fall zone.If the right-of-way for a public street is within the fall zone,
the Virginia Department of Transportation shall be included in the staff review,in lieu of recording an
easement or other document.
Type of Application
Performance Standards,Requirements&Checklists I II III
Please check those that appy to acknowledge these requirements
1. Building permit application;submitting certification of monopole height and revised plans. The following X
shall be submitted with the building permit application:(i)certification by a registered surveyor stating the
height of the reference tree that is used to determine the permissible height of the monopole;and(ii)a fmal
revised set of plans for the construction of the facility.The agent shall review the surveyor's certificate and
the plans to ensure that all applicable requirements have been satisfied.
Work Value $
2. Tree conservation plan;compliance;amendment. The installation,operation,and maintenance of the X X X ['
facility shall be conducted in accordance with the tree conservation plan.The applicant shall not remove
existing trees within the lease area or within one hundred(100)feet in all directions surrounding the lease
area of any part of the facility except for those trees identified on the plan to be removed for the
installation,operation,and maintenance of the facility and dead and dying trees.Before the applicant
removes any tree not designated for removal on the approved plan,the applicant shall submit and obtain
approval of an amended plan.The agent may approve the amended plan if the proposed tree removal will
not adversely affect the visibility of the facility from any location off of the parcel.The agent may impose
reasonable conditions to ensure that the purposes of this paragraph are achieved.
3. Completion of installation;submitting certifications of compliance.Within thirty(30)days after X X X
completion of the installation of the facility,the applicant shall provide to the agent prior to issuance of a
certificate of occupancy: (i)certification by a registered surveyor stating the height of the tower or
monopole,measured both in feet above ground level and in elevation above mean sea level,using the
benchmarks or reference datum identified in the application;and(ii)certification stating that the lightning
rod's height does not exceed two(2)feet above the top of the tower or monopole and its width does not
exceed a diameter of one(1)inch.
4. Discontinuance of use;notice thereof removal;surety. Within thirty(30)days after a tower or monopole's X X X
use for personal wireless service or any service facilitated by transmission equipment is discontinued,the
owner of the facility shall notify the zoning administrator in writing that the facility's use has discontinued.
The facility and any transmission equipment shall be disassembled and removed from the facility site
within ninety(90)days after the date its use for personal wireless service or any service facilitated by
transmission equipment is discontinued.If the agent determines at any time that surety is required to
guarantee that the facility will be removed as required,the agent may require that the parcel owner or the
owner of the facility submit a certified check,a bond with surety,or a letter of credit,in an amount
sufficient for,and conditioned upon,the removal of the facility.The type and form of the surety guarantee
shall be to the satisfaction of the agent and the county attorney.In determining whether surety should be
required,the agent shall consider the following: (i)whether there is a change in technology that makes it
likely that the monopole or tower will be unnecessary in the near future;(ii)the permittee fails to comply
with applicable regulations or conditions;(iii)the permittee fails to timely remove another monopole or
tower within the county;and(iv)whenever otherwise deemed necessary by the agent.
REVISED 12/7/2017 Page 6 of 11
Noril *S.
Personal Wireless Service Facility Application
Criteria for Special Exception to modify or waive requirements
If an applicant proposes to submit less information than required or request a modification or waiver of any design criteria the request for
modification or waiver must be received at the time the application is filed or the application shall be deemed incomplete. In requesting a
modification or waiver the applicant shall provide information to allow the Board of Supervisors to find:
1. That complying with the provisions of the Zoning Ordinance would not forward the purposes of the Zoning Ordinance or
otherwise serve the public health,safety,or welfare or;
2. That a modified regulation would satisfy the purposes of the Zoning Ordinance to at least an equivalent degree as the specified
requirement.
Definitions associated with Personal Wireless Service Facilities
Antenna array:An orderly arrangement of antennas mounted at the same height on a tower or other structure and intended to transmit a
signal providing coverage over a specific area for a single provider of personal wireless services.
Avoidance area:An area having significant resources where the initial siting of personal wireless service facilities could result in adverse
impacts as follows: (i)any ridge area where a personal wireless service facility would be skylighted;(ii)a parcel within an agricultural
and forestal district;(iii)a parcel within a historic district;(iv)any location in which the proposed personal wireless service facility and
three(3)or more existing or approved personal wireless service facilities would be within an area comprised of a circle centered
anywhere on the ground having a radius of two hundred(200)feet;or(v)any location within two hundred(200)feet of any state scenic
highway or by-way.
Base station:A structure or equipment at a fixed location that enables Federal Communications Commission-licensed or authorized
wireless communications between user equipment and a communications network.
1. Services to which the term applies.The term includes,but is not limited to,equipment associated with wireless communications
services such as private,broadcast,and public safety services,as well as unlicensed wireless services and fixed wireless services
such as microwave backhaul.
2. Equipment to which the term applies and does not apply.The term includes,but is not limited to,radio transceivers,antennas,
coaxial,or fiber optic cable,regular and backup power supplies,and comparable equipment,regardless of technological
configuration,including distributed antenna systems and small-cell networks.The term does not include any equipment
associated with a tower.
3. Structures to which the term applies and does not apply.The term includes any structure,other than a tower,that,at the time the
relevant application is filed with the county,supports or houses equipment described in paragraphs(1)and(2)of this defmition
that has been reviewed and approved under section 5.1.40 or the applicable zoning process in effect prior to October 13,2004.
The term does not include:(i)a tower as defined in this section;and(ii)any structure that,at the time the relevant application is
filed with the county under section 5.1,40,does not support or house equipment described in paragraphs(1)and(2)of this
definition.
Collocation:The mounting or installation of transmission equipment on an eligible support structure for the purpose of transmitting
and/or receiving radio frequency signals for communications purposes.
Collocation, exempt:A collocation that would not result in a substantial change in the physical dimensions of an eligible support
structure.
Concealment elements of the eligible support structure:Any condition of approval,including any applicable requirement of section 5.1.40
in effect at the time of approval,established and imposed on the personal wireless service facility as a concealment technique and which
includes conditions or regulations pertaining to antenna size,color of the structure and all equipment,antenna mounting techniques,
including the requirement that antennas be flush mounted,maximum tower diameters at the base and top,limitations on tower height
relative to a reference tree,screening by trees including the restrictions on removing trees that are screening the tower,siting towers so
that they are not skylighted,requirements as to how cables should be located on a tower,and the size,location,design,and screening for
ground based equipment.
Eligible support structure:Any tower or base station,provided that it is existing at the time the relevant application is filed with the
County.
Existing building:As used in section 5.1.40 and any definitions pertaining to personal wireless service facilities,a building that was
lawfully constructed or established and complies with the minimum applicable bulk,height,setback,floor area,and other structure
requirements of the district in which the building is located.
REVISED 12/7/2017 Page 7 of 11
•
Nire **ad
Personal Wireless Service Facility Application
Existing structure:As used in section 5.1.40 a structure,other than a flagpole or an existing tower,that was lawfully constructed or
established and complies with the minimum applicable bulk,height,setback,floor area or other structure requirements of the district in
which the structure is located.
Existing tower or existing base station:As referred to in the definition of"eligible support structure,"a constructed tower or base station
that has been reviewed and approved under the applicable zoning process,provided that a tower that has not been reviewed and approved
because it was not required to be reviewed when it was built,but was lawfully constructed,is existing for purposes of this definition.
Fall zone:A zone on the surface of the ground that is a circle whose center is the proposed or standing personal wireless service facility
or small wind turbine(the"facility or turbine"),where the radius is measured from the outer surface of the facility's or turbine's pole or
other vertical structure immediately above its foundation,and where the radius is:(i)for facilities,equal to the height of the facility;and
(ii)for turbines,equal to the height of the turbine plus a distance of twenty(20)feet.
Mobile personal wireless service facility:A portable self-contained personal wireless service facility site that can be moved to a location
and set up to provide personal wireless services on a temporary or emergency basis.
Personal wireless services: Commercial mobile services,unlicensed wireless services,common carrier wireless exchange access services,
as those services are defined by federal law and,for the purposes of this chapter,unlicensed wireless broadband internet access services.
Personal wireless service facility:A facility for the provision of personal wireless services,which may be composed of antennas,cables,
wiring,supporting brackets and other structural equipment,grounding rods,transmission equipment,one or more ground equipment
shelters,and a self-supporting monopole or tower.
Reference tree:A tree designated for determining the top height of a treetop facility's monopole mounting structure.This may either be
the tallest tree within twenty five(25)feet of the proposed monopole or a shorter tree that has been strategically identified for screening
and camouflaging purposes.(Added 10-13-04)
Replacement:As used in section 5.1.40 and any definitions pertaining to personal wireless service facilities,the replacement of
transmission equipment of the same or lesser size in the same location as the equipment being replaced on an eligible support structure.
Replacement, exempt:A replacement that would not result in a substantial change in the physical dimensions of the eligible support
structure.
Ridge area:All land within one hundred(100)vertical feet of,and including,the ridgeline and peaks of a mountain or chain of
mountains,as identified on a ridge area map approved by the board of supervisors.
Ridgeline:The uppermost line created by connecting the peaks of a mountain or chain of mountains,and from which land declines in
elevation on at least two(2)sides,as identified on a ridge area map approved by the board of supervisors.
Skylight:Locating a personal wireless service facility in such a way that the sky is the backdrop of any portion of the facility.Skylight has
the same meaning as"skylining,"as that term is used in the wireless policy.
Substantial change:A modification to an eligible support structure that meets one or more of the following criteria:
1. Increase in height.For towers other than towers in the public rights-of-way,the modification increases the height of the tower by
more than ten percent(10%)or by the height of one additional antenna array with separation from the nearest existing antenna
not to exceed twenty(20)feet,whichever is greater;for other eligible support structures,the modification increases the height of
the structure by more than ten percent(10%)or more than ten(10)feet,whichever is greater.Changes in height shall be
measured from the original support structure in cases where deployments are or will be separated horizontally,such as on
buildings'rooftops;in other circumstances,changes in height should be measured from the dimensions of the tower or base
station,inclusive of originally approved appurtenances and any modifications that were approved prior to February 22,2012.
2. Increase in width.For towers other than towers in the public rights-of-way,the modification involves adding an appurtenance to
the body of the tower that would protrude from the edge of the tower more than twenty(20)feet,or more than the width of the
tower structure at the level of the appurtenance,whichever is greater;for other eligible support structures,the modification
involves adding an appurtenance to the body of the structure that would protrude from the edge of the structure by more than six
(6)feet.
REVISED 12/7/2017 Page 8 of 11
Sore
Personal Wireless Service Facility Application
3. Excessive equipment cabinets.For any eligible support structure,the modification involves installation of more than the standard
number of new equipment cabinets for the technology involved,but not to exceed four(4)cabinets;or,for towers in the public
rights-of-way and base stations,the modification involves installation of any new equipment cabinets on the ground if there are
no pre-existing ground cabinets associated with the structure,or else involves installation of ground cabinets that are more than
ten percent(10%)larger in height or overall volume than any other ground cabinets associated with the structure.
4. Expands tower site.The modification entails any excavation or deployment outside the current site.
5. Defeats concealment elements.The modification would defeat the concealment elements of the eligible support structure.
6. Does not comply with conditions of approval.The modification does not comply with conditions associated with the siting
approval of the construction or modification of the eligible support structure or base station equipment;provided that this
limitation does not apply to any modification that is noncompliant only in a manner that would not exceed the thresholds
identified in paragraphs(1)through(4)of this definition.
Tier I personal wireless service facility or Tier I facility:A personal wireless service facility that:(i)is located entirely within an existing
building but which may include a self-contained ground equipment shelter not exceeding one hundred fifty(150)square feet that is not
within the building or a whip antenna that satisfies the requirements of subsection 5.1.40(b)(1)(d);(ii)consists of one or more antennas,
other than a microwave dish,attached to an existing structure,together with associated personal wireless service equipment;(iii)is
located within or camouflaged by an addition to an existing structure determined by the agent to be in character with the structure and the
surrounding district;or(iv)is the replacement of a wooden monopole with a metal monopole that does not exceed the maximum
dimensions permitted under subsection 5.1.40(b)(9).
Tier II personal wireless service facility or Tier IIfacility:A personal wireless service facility that is a treetop facility not located within
an avoidance area.
Tier III personal wireless service facility or Tier ID-facility:A personal wireless service facility that is neither a Tier I nor a Tier II
facility,including a facility that was not approved by the commission or the board of supervisors as a Tier II facility.
Tower:As referred to in the definition of"eligible support structure"and"existing tower or base station,"any structure built for the sole
or primary purpose of supporting any Federal Communications Commission licensed or authorized antennas and their associated
facilities,including structures that are constructed for wireless communications services including,but not limited to,private,broadcast,
and public safety services,as well as unlicensed wireless services and fixed wireless services such as microwave backhaul,and the
associated tower site.
Tower site:As referred to in the definitions of"substantial change"and"tower"and as used in section 5.1.40,for towers other than
towers in the public rights-of-way,the current boundaries of the leased or owned property surrounding the tower and any access or utility
easements currently related to the site,and,for other eligible support structures,further restricted to that area in proximity to the structure
and to other transmission equipment already deployed on the ground.
Transmission equipment:As used in section 5.1.40,equipment that facilitates transmission for any Federal Communications Commission
licensed or authorized wireless communication service,including,but not limited to,radio transceivers,antennas,coaxial or fiber-optic
cable,and regular and backup power supply.The term includes equipment associated with wireless communications services,including,
but not limited to,private,broadcast,and public safety services,as well as unlicensed wireless services and fixed wireless services such as
microwave backhaul.
Treetop facility:A personal wireless service facility consisting of a self-supporting monopole having a single shaft of wood,metal or
concrete no more than ten(10)feet taller than the crown of the tallest tree within twenty-five(25)feet of the monopole,measured above
sea level(ASL),and includes associated antennas,mounting structures,an equipment cabinet and other essential personal wireless service
equipment.
REVISED 12/7/2017 Page 9 of 11
Personal Wireless Service Facility Application
TIER I, II, and III Building Permit & or Site Plan APPLICATIONS
If this is a Tier I application requiring a building permit,the permit becomes null and void if work or construction authorized is not
commenced within 6 months,or if construction or work is suspended or abandoned for a period of 6 months at any time after work is
commenced.
I hereby certify that I have read and examined this application and know the same to be true and correct.All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not.The granting of a permit does not presume
to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of
construction.
By signing this application,the owner and/or their agent hereby grant employees of the Albemarle County Community Development&
Real Estate Departments the right to enter and inspect the subject property Monday through Friday between the hours of 8:00 a.m.and
5:00 p.m.,holidays excepted.
By signing this application I certify that the information provided on this application and on supporting documents is correct and accurate
to the best of my knowledge.I also consent and understand that providing incorrect and inaccurate information about the nature of this
application renders this application incomplete and it shall have be deemed to have not been officially submitted.
Please check which applies:
VI certify that I am the agent for C c)O}itS J 111e. aut t a ere WCVk ,who is the Owner,and I am
authorized to submit this application on behalf of the Owner under the agency.
❑ I am neither the Owner nor the Owner's agent.I certify that written notice of this application,by providing a copy of this
application,will be mailed to the Owner at the following address:
within 10 days of today's date as required by Virginia Code§15.2-2204(11).I understand that,if I do not provide the notice to the Owner
as provided herein,the building permit application and every other subsequent approval,permit or certificate related thereto could be
determined to be void.
❑ I certify that I am the owner.
_a_r_i -;1; :=D Vii)AO kr
Signature o er,Contrac , r uthorized Agent Date
ELECTRONIC RECORDS STATEMENT:Albemarle County is creating and using electronic records and electronic signatures as
allowed by the Uniform Electronic Transactions Act(Virginia Code§59.1-479 et.Seq.).As an applicant to the Building Permit process,
you may consent to receive,or have online access to,electronic records and receive and create records having electronic signatures related
to Building Permits,Correspondence,Inspection Tickets and Certificates of Occupancy(the Building Permit transactions).
cg- )flbl�t�
Inih s of Owner,Contractor or Authorized Agent Date
Your agreement to conduct Building Permit transactions by electronic means does not prevent you from refusing to conduct other
transactions by electronic means.
TIER III Special Use Permit APPLICATIONS
I hereby certify that I own the subject property,or have the legal power to act on behalf of the owner in filing this application.
I also certify that the information provided on this application and accompanying information is accurate,true,and correct to
the best of my knowledge.By signing this application I am consenting to written comments,letters and or notifications
regarding this application being provided to me or my designated contact via fax and or email.This consent does not
preclude such written communication from also being sent via first class mail.
Signature of Owner/Agent Date
Print Name Daytime phone number of Signatory
REVISED 12/7/2017 Page 10 of 11
Personal Wireless Service Facility Application
Required FEES to be paid at time of application:
What type of Personal Wireless Service Facility are you applying for?
❑ Tier I Facility $113.60
GI/Tier II Facilities—Site Plan $1,957
❑ Tier III Facilities—Special Use Permit $2,150
❑ Amend existing Special Use Permit $1,075
❑ Special Exception $457
❑ Notification Requirement for Tier II and Tier III for up to 50 notices $215
❑ Notification Requirement for Tier II and Tier III for each notice over 50 notices* $1.08 plus the cost of
postage
❑ Published notice cost for Tier III Facilities** Cost is based on a cost
quote from the publisher.
❑ Building Permit after Tier II or Tier III approval $113.60
*This fee is not collected at the time of initial submittal. This fee, if any, will be calculated by staff and the applicant will be notified
of the fee amount and the deadline for payment. If the fee is not submitted by the deadline the applicant shall be deemed incomplete.
**To be paid after staff review for public notice:
Most applications for a Special Use Permit require at least one public hearing by the Planning Commission and one public
hearing by the Board of Supervisors. Virginia State Code requires that notice for public hearings be made by publishing a legal
advertisement in the newspaper and by mailing letters to adjacent property owners. Therefore, at least two fees for public notice
are required before a Special Use Permit may be heard by the Board of Supervisors.
The total fee for public notice will be provided to the applicant after the final cost is determined and must be paid before the
application is heard by a public body. Staff estimates the total cost of legal advertisement and adjacent owner notification to be
between$350 and$450 per hearing. This estimate reflects the average cost of public notice fees for Special Use Permit
applications, but the cost of certain applications may be higher.
Other FEES that may apply:
➢ Deferral of scheduled public hearing at applicant's request $194
Resubmittal fees for Tier III Facilities
➢ First resubmission FREE
➢ Each additional resubmission(TO BE PAID WHEN THE RESUBMISSION IS MADE TO INTAKE STAFF) $1,075
➢ Each additional resubmission of an amendment to an existing SP(TO BE PAID WHEN THE RESUBMISSION $538
IS MADE TO INTAKE STAFF)
REVISED 12/7/2017 Page 11 of 11