HomeMy WebLinkAboutSDP201800041 Review Comments Initial Site Plan 2018-07-03County of Albemarle
Department of Community Development
Memorandum
To: Patricia Saternye
From: Emily Cox
Date: 3 July 2018
Subject: Belvedere Phase 5 - ISP (SDP201800041)
The initial site plan for Belvedere Phase 5 has been reviewed by Engineering. The following comments
will need to be addressed before approval:
1. WPO Plan must be submitted and approved before final site plan can be approved.
2. Road Plan must be submitted and approved before final site plan can be approved.
3. Per the Engineering Design Standards Manual, Section 8, any slopes steeper than 3:1 must
have low maintenance (not grass) ground cover specified on the plans. Please add this
note on the plan for any slopes steeper than 3:1.
4. Topography/land survey/existing conditions must be updated on final site plan/road
plan/WPO plan. It should at least be field verified within the last year. Plans state the
source is dated 2016.
5. Ensure preserved and managed slopes, WPO buffer, floodplain, etc are shown on all
applicable sheets.
6. Ensure steep slope overlay district code is met (Chapter 18 - Section 30.7).
7. Grading is shown offsite (behind lots 21/22). Ensure you have permission or an easement
for this grading/earthwork.
8. Sheet 5 references a preservation easement, but the boundary is not clear. Ensure this
easement is not violated by any proposed work.