HomeMy WebLinkAboutWPO201800016 Bond Estimates 2018-07-05 (3)Project Name: Birdwood Golf Course WP0201800016
WPO file number: WP020100039
Stormwater Management Plan Bond Estimate
Item Item
Number
Date
No. Unit Unit Cost Cost
installed
permanent diversion or ditch
0 ft
$13.00
$0.00
standard manhole frame top (not inlet)
0 ea
$500.00
$0.00
drop inlet or grate
0 ea
$3,500.00
$0.00
silt fence (SF)
9032.0 ft
$4.50
$40,644.05
safety fence (SAF)
16570.1 ft
$4.50
$74,565.27
manhole structure (per ft. rise)
0 ft
$450.00
$0.00
pipe, rcp, cmp (15 to 48") 0.0 in d 0 ES -1,2
0 EC -1 0.0 ft
$0.00
$0.00
pretreatment stone (#57s) 9220.0 cf
645.4 ton
$34.00
$21,943.60
as -built drawings (per facility)
10 ea
$2,000.00
$20,000.00
materials testing (per facility)
1 ea
$2,000.00
$2,000.00
compaction testing (per dam)
0 ea
$3,000.00
$0.00
manufactured facilities (attach manufacturer's or contractor's price as a base)
$0.00
cost sum $161,652.92
contingency $16,165.29
WP0201800016-SWM_bond_est (003)_Birdwood Golf Course 070518.xlsx
MY /JA-J.Wilson Qty. - 070518 Total $177,820
7/5/2018
Birdwood Gold Course
WPO file number: WP0201800016
Erosion and Sediment Control Bond Estimate
Item Item
Number
stablization (PS, TS)
silt fence (SF) + super silt fence (SSF)
safety fence (SAF)
diversion (DV, FD, RW D, CW D, DD)
silt sock (SS) material
silt sock (SS) labor
temporary slope drain (TSD)
earthwork for trap/basin
ST1
earthwork for trap/basin
ST2
earthwork for trap/basin
ST3
earthwork for trap/basin
ST4
earthwork for trap/basin
ST5
earthwork for trap/basin
ST6
earthwork for trap/basin
ST7
pipe length -ft
height of dam at toeoft
ft
height of fill at faceft
ft
length of damft
ft
top width
(area above transition)
35.75 sf
(total width of dam)
8 ft
(height below transition)
0.75 ft
(area below transition)
2.4375 at
(total fill volume)
60.8 cy
length of spillway ft
width of spillway 4 ft
height of dam at toe
ft
height of fill at face
ft
length of dam
ft
top width
ft
(area above transition)
35.75 sf
(total width of dam)
8 ft
(height below transition)
0.75 ft
(area below transition)
2.4375 at
(total fill volume)
60.8 cy
length of spillwayft
width of spillway ft
height of dam at toeoft
ft
height of fill at faceft
ft
length of damft
ft
top width
(area above transition)
35.75 sf
(total width of dam)
8 ft
(height below transition)
0.75 ft
(area below transition)
2.4375 at
(total fill volume)
60.8 cy
length of spillwayft
width of spillway ft
height of dam at toeft
3.5 ft
height of fill at faceoft
ft
length of damft
ft
top width
(area above transition)
35.75 sf
(total width of dam)
8 ft
(height below transition)
0.75 ft
(area below transition)
2.4375 at
(total fill volume)
60.8 cy
length of spillwayft
width of spillway ft
height of dam at toeft
3.5 ft
height of fill at face
ft
length of dam
ft
top width
ft
(area above transition)
35.75 sf
(total width of dam)
8 ft
(height below transition)
0.75 ft
(area below transition)
2.4375 at
(total fill volume)
60.8 cy
length of spillwayft
width of spillway ft
height of dam at toeft
3.5 ft
height of fill at faceoft
ft
length of damft
ft
top width
(area above transition)
35.75 sf
(total width of dam)
8 ft
(height below transition)
0.75 ft
(area below transition)
2.4375 at
(total fill volume)
60.8 cy
length of spillwayft
width of spillway ft
height of dam at toe -ft
height of fill at face ft
pipe diameter ' 24 in
cut at high sideft
3.5 ft
cut at face
ft
length of cut
ft
width of cut
ft
(area below transition)
0 sf
(total width of cut)
20 ft
(depth below transition
3.5 ft
(area above transition)
22.75 at
(total fill volume)
28.6 cy
(TOAL CY estimate)
70 cy
(spillway stone tons)
3.5 tons
cut at high side
3.5 ft
cut at face
Oft
length of cut
34 ft
width of cut
ft
(area below transition)
0 sf
(total width of cut)
20 ft
(depth below transition
3.5 ft
(area above transition)
22.75 at
(total fill volume)
28.6 cy
(TOAL CY estimate)
70 cy
(spillway stone tons)
3.5 tons
cut at high side eft
cutatface
Oft
length of cut
34 ft
width of cut
r 13 ft
(area below transition)
0 sf
(total width of cut)
20 ft
(depth below transition
3.5 ft
(area above transition)
22.75 at
(total fill volume)
28.6 cy
(TOAL CY estimate)
70 cy
(spillway stone tons)
3.5 tons
out athigh sideoft
ft
cut at face
ft
length of cutft
width of cut
(area below transition)
0 sf
(total width of cut)
20 ft
(depth below transition
3.5 ft
(area above transition)
22.75 at
(total fill volume)
28.6 cy
(TOAL CY estimate)
70 cy
(spillway stone tons)
3.5 tons
out athigh sideoft
ft
cut at face
ft
length of cutft
width of cut
(area below transition)
0 sf
(total width of cut)
20 ft
(depth below transition
3.5 ft
(area above transition)
22.75 at
(total fill volume)
28.6 cy
(TOAL CY estimate)
70 cy
(spillway stone tons)
3.5 tons
cut at high side
---" ft
cutatface
Oft
length cut
ILft
width off cut
ft
(area below transition)
0 sf
(total width of cut)
20 ft
(depth below transition
3.5 ft
(area above transition)
22.75 at
(total fill volume)
28.6 cy
(TOAL CY estimate)
70 cy
(spillway stone tons)
3.5 tons
cut at high side -n
cut at face ft
7/5/2018
No. Unit Unit Cost Cost
(installed)
161.00 acres $1,000.00
33978.0 ft $4.50
0.0 ft $4.50
15724 ft $13.00
ft $3.24
ft $0.31
$50.00
$13.00
$50.00
$13.00
$50.00
$13.00
$50.00
$13.00
$50.00
$13.00
$50.00
$13.00
$50.00
$161,000.00
$152,901.05
$0.00
$204,412.00
$11,022.48
$1,054.62
$48,739.00
$910.00
$175.00
$910.00
$175.00
$910.00
$175.00
$910.00
$175.00
$910.00
$175.00
$910.00
$175.00
7/5/2018
Birdwood Gold Course
WPO file number: WP0201800016
Erosion and Sediment Control Bond Estimate
Item Item
Number
earthwork for trap/basin
STS
earthwork for trap/basin
ST9
earthwork for trap/basin
ST10
earthwork for trap/basin
ST11
earthwork for trap/basin
ST12
earthwork for trap/basin
ST13
earthwork for trap/basin
ST14
length of damft
ft
top width
ft
(area above transition)
35.75 sf
(total width of dam)
8 ft
(height below transition)
0.75 ft
(area below transition)
2.4375 sf
(total fill volume)
60.8 cy
length spillway
_ft
width off spillway
ft
height of damat toe
ft
height of fill at face
ft
length of dam
ft
top width
ft
(area above transition)
35.75 sf
(total width of dam)
8 ft
(height below transition)
0.75 ft
(area below transition)
2.4375 sf
(total fill volume)
60.8 cy
length spillway
_ft
width off spillway
ft
height of dam at toeft
34 ft
height of fill at face
ft
length of dam
ft
top width
ft
(area above transition)
35.75 sf
(total width of dam)
8 ft
(height below transition)
0.75 ft
(area below transition)
2.4375 sf
(total fill volume)
60.8 cy
length spillway
_ft
width off spillway
ft
height of dam at toeft
34 ft
height of fill at face
ft
length of dam
ft
top width
ft
(area above transition)
35.75 sf
(total width of dam)
8 ft
(height below transition)
0.75 ft
(area below transition)
2.4375 sf
(total fill volume)
60.8 cy
length spillway
_ft
width off spillway
ft
height of dam at toeft
34 ft
height of fill at face
ft
length of dam
ft
top width
ft
(area above transition)
35.75 sf
(total width of dam)
8 ft
(height below transition)
0.75 ft
(area below transition)
2.4375 sf
(total fill volume)
60.8 cy
length spillway
_ft
width off spillway
ft
height of dam at toeft
34 ft
height of fill at face
ft
length of dam
ft
top width
ft
(area above transition)
35.75 sf
(total width of dam)
8 ft
(height below transition)
0.75 ft
(area below transition)
2.4375 sf
(total fill volume)
60.8 cy
length spillway
_ft
width off spillway
ft
height of dam at toeft
34 ft
height of fill at faceEft
ft
length of damft
0 sf
top width
(area above transition)
35.75 sf
(total width of dam)
8 ft
(height below transition)
0.75 ft
(area below transition)
2.4375 sf
(total fill volume)
60.8 cy
length spillway
_ft
width off spillway
ft
height of dam at toe -ft
length of cutft
34 ft
width of cut
ft
(area below transition)
0 sf
(total width of cut)
20 ft
(depth below transition
3.5 ft
(area above transition)
22.75 sf
(total fill volume)
28.6 cy
(TOAL CY estimate)
70 cy
(spillway stone tons)
3.5 tons
cut at high sideft
34 ft
cutatface
ft
FL34
length of cut
ft
width of cut
ft
(area below transition)
0 sf
(total width of cut)
20 ft
(depth below transition
3.5 ft
(area above transition)
22.75 sf
(total fill volume)
28.6 cy
(TOAL CY estimate)
70 cy
(spillway stone tons)
3.5 tons
cutat high sideMftft
34 ft
cutatfceft
3 ft
length of cutft
0 sf
width of cut
(area below transition)
0 sf
(total width of cut)
20 ft
(depth below transition
3.5 ft
(area above transition)
22.75 sf
(total fill volume)
28.6 cy
(TOAL CY estimate)
70 cy
(spillway stone tons)
3.5 tons
cutat high sideMftft
34 ft
cutatfceft
3 ft
length of cutft
0 sf
width of cut
(area below transition)
0 sf
(total width of cut)
20 ft
(depth below transition
3.5 ft
(area above transition)
22.75 sf
(total fill volume)
28.6 cy
(TOAL CY estimate)
70 cy
(spillway stone tons)
3.5 tons
cutat high sideMftft
34 ft
cutatfceft
3 ft
length of cutft
0 sf
width of cut
(area below transition)
0 sf
(total width of cut)
20 ft
(depth below transition
3.5 ft
(area above transition)
22.75 sf
(total fill volume)
28.6 cy
(TOAL CY estimate)
70 cy
(spillway stone tons)
3.5 tons
cut at high side
-ft
cut at face
0 ft
length of cut
34 ft
width of cut
3 ft
(area below transition)
0 sf
(total width of cut)
20 ft
(depth below transition
3.5 ft
(area above transition)
22.75 sf
(total fill volume)
28.6 cy
(TOAL CY estimate)
70 cy
(spillway stone tons)
3.5 tons
cutat high sideMftft
cutatfceft
length of cutft
width of cut
(area below transition)
0 sf
(total width of cut)
20 ft
(depth below transition
3.5 ft
(area above transition)
22.75 sf
(total fill volume)
28.6 cy
(TOAL CY estimate)
70 cy
(spillway stone tons)
3.5 tons
cut at high side -ft
7/5/2018
No. Unit Unit Cost Cost
(installed)
$13.00 $910.00
$50.00 $175.00
$13.00
$50.00
$13.00
$50.00
$13.00
$50.00
$13.00
$50.00
$13.00
$50.00
$13.00
$50.00
$910.00
$175.00
$910.00
$175.00
$910.00
$175.00
$910.00
$175.00
$910.00
$175.00
$910.00
$175.00
7/5/2018
Birdwood Gold Course
WPO file number: WP0201800016
Erosion and Sediment Control Bond Estimate
Item Item
Number
earthwork for trap/basin
ST15
earthwork for trap/basin
ST16
earthwork for trap/basin
ST17
earthwork for trap/basin
ST18
earthwork for trap/basin
SB
no spillway purposed
structures for basin
silt fence inlet protection (IP)
stone inlet protection (IP)
outlet protection (OP)
channel (SCC, matted)
check dam
height of darn ll face M ft
length of spillway
width of spillway ftft
length of dam ft
height of dam at toeoft
ft
[op width
ft
(area above transition)
35.75 sf
(total width of dam)
8 ft
(height below transition)
0.75 ft
(area below transition)
2.4375 sf
(total fill volume)
60.8 cy
height of dam at toeoft
ft
height of fill at faceft
3.25 ft
length of damft
43 ft
top width
(area above transition)
35.75 sf
(total width of dam)
8 ft
(height below transition)
0.75 ft
(area below transition)
2.4375 sf
(total fill volume)
60.8 cy
length of spillway ft
width of spillway 1Mq ft
height of dam at toeIL-
4 ft
height of fill at face
3.25 ft
length of dam
43 ft
top width
.5 ft
(area above transition)
35.75 sf
(total width of dam)
8 ft
(height below transition)
0.75 ft
(area below transition)
2.4375 sf
(total fill volume)
60.8 cy
length of spillwayft
width of spillway ft
height of dam at toeft
0 ft
height of fill at faceoft
ft
length of damft
ft
top width
(areaabove transition)
35.75 sf
(total width of dam)
8 ft
(height below transition)
0.75 ft
(area below transition)
2.4375 sf
(total fill volume)
60.8 cy
length of spillwayft
width of spillway Mft
height of dam at toeft
0 ft
height of fill at faceoft
ft
length of damft
ft
top width
(areaabove transition)
35.75 sf
(total width of dam)
8 ft
(height below transition)
0.75 ft
(area below transition)
2.4375 sf
(total fill volume)
60.8 cy
length of spillway ft
width of spillway r9 ft
height of dam at toeft
0 ft
height of fill at face
ft
length of dam
ft
top width
ft
(area above transition)
84 sf
(total width of dam)
4 ft
(height below transition)
-4 ft
(area below transition)
-24 sf
(total fill volume)
116.7 cy
length of spillwayft
width of spillway M ft
riser height ft
riser diameter in
barrel length ft
barrel diameter in
cut at face
0 ft
length of cut
ft
width of cut
3 ft
(area below transition)
0 sf
(total width of cut)
20 ft
(depth below transition
3.5 ft
(area above transition)
22.75 sf
(total fill volume)
28.6 cy
(TOAL CY estimate)
70 cy
(spillway stone tons)
3.5 tons
cut at high sideft
cut at face
ft
length of cutoft
ft
width of cut
(area below transition)
0 sf
(total width of cut)
20 ft
(depth below transition
3.5 ft
(area above transition)
22.75 sf
(total fill volume)
28.6 cy
(TOAL CY estimate)
70 cy
(spillway stone tons)
3.5 tons
cut at high side r
3.5 ft
cul at face
Oft
length of cut
34 ft
width of cut
ft
(area below transition)
0 sf
(total width of cut)
20 ft
(depth below transition
3.5 ft
(area above transition)
22.75 sf
(total fill volume)
28.6 cy
(TOAL CY estimate)
70 cy
(spillway stone tons)
3.5 tons
cut at high side
eft
cutatface
Oft
length of cut
34 ft
width of cut
13 ft
(area below transition)
0 sf
(total width of cut)
20 ft
(depth below transition
3.5 ft
(area above transition)
22.75 sf
(total fill volume)
28.6 cy
(TOAL CY estimate)
70 cy
(spillway stone tons)
3.5 tons
out athigh sideoft
ft
cut at face
ft
length of cutft
ft
width of cut
(area below transition)
0 sf
(total width of cut)
20 ft
(depth below transition
3.5 ft
(area above transition)
22.75 sf
(total fill volume)
28.6 cy
(TOAL CY estimate)
70 cy
(spillway stone tons)
3.5 tons
out athigh side
ft
cut at face
ft
length of cut
ft
width of cut
ft
(area below transition)
0 sf
(total width of cut)
26 ft
(depth below transition
6 ft
(area above transition)
42 sf
(total fill volume)
80.9 cy
(TOAL CY estimate)
144 cy
(spillway stone tons)
0 tons
(riser unit price) $0.00
base plate or fdn _
(barrel unit price) $50.00
barrel collars
baffle length Mft
length .ft width
length ft width
depth in channel ft channel width
No. Unit Unit Cost
(installed)
7/5/2018
Cost
$13.00 $910.00
$50.00 $175.00
$13.00 $910.00
$50.00 $175.00
$13.00 $910.00
$50.00 $175.00
$13.00 $910.00
$50.00 $175.00
$13.00 $910.00
$50.00 $175.00
$13.00 $1,872.00
$50.00 $0.00
$200.00
$200.00
$50.00
$100.00
$200.00
$162.00
$0.00
$0.00
$0
$2,436.50
$0
$0
$500.00
$0.00
$972.00
$0.00
$0.00
7/5/2018
Birdwood Gold Course
WPO file number: WP0201800016
Erosion and Sediment Control Bond Estimate
Item Item
Number
construction entrance (CE)
wash rack
paved construction entrance
Hp -rap, placed depth
width
survey and layout (price per 0.1 mi.) acres
mobilization
stream crossing (computed independently)
_ft length
(tons)
traps and basins
W P0201800016-ESC_bond_est (003)_13irdwood Golf Course 070518.x1sx
MY /JA -J.W ikon Qty. - 070518
7/5/2018
cost sum $623,657.65
wntingency $62,365.76
Total $686,030
7/5/2018
No. Unit Unit Cost
Cost
(installed)
$2,500.00
$7,50.00
$2,000.00
■
$0.00
$
$3,500.00
$0.00
-ft
0 tons
$60.00
$0.00
-
$9,218.00
$2,500.00
$0.00
cost sum $623,657.65
wntingency $62,365.76
Total $686,030
7/5/2018
Project Name: Birdwood Golf Course WP0201800016
WPO file number: WP020100039
Stormwater Management Plan Bond Estimate
Item Item
Number
Date
No. Unit Unit Cost Cost
installed
permanent diversion or ditch
0 ft
$13.00
$0.00
standard manhole frame top (not inlet)
0 ea
$500.00
$0.00
drop inlet or grate
0 ea
$3,500.00
$0.00
silt fence (SF)
9032.0 ft
$4.50
$40,644.05
safety fence (SAF)
16570.1 ft
$4.50
$74,565.27
manhole structure (per ft. rise)
0 ft
$450.00
$0.00
pipe, rcp, cmp (15 to 48") 0.0 in d 0 ES -1,2
0 EC -1 0.0 ft
$0.00
$0.00
pretreatment stone (#57s) 9220.0 cf
645.4 ton
$34.00
$21,943.60
as -built drawings (per facility)
10 ea
$2,000.00
$20,000.00
materials testing (per facility)
1 ea
$2,000.00
$2,000.00
compaction testing (per dam)
1 ea
$3,000.00
$3,000.00
manufactured facilities (attach manufacturer's or contractor's price as a base)
$0.00
cost sum $164,652.92
contingency $16,465.29
WP0201800016-SWM_bond_est (003)_Birdwood Golf Course 070518.xlsx
MY /JA -J. W ilson Qty. - 070518 Total $181,120
7/5/2018
Project Name: Birdwood Golf Course WP0201800016
WPO file number: WP0201600016
Miti_pation Plan Bond Estimate 10.1 Ac. Mitigation Area -total
Table B, Option A is required, but select only option B1 or B2
Item Item
No. Unit
Unit Cost
Cost
Number
installed
Riparian buffer option, Table B, option A (same as Table A; plant at the same rate as for % Ac. or less
- )
1 Mitigation Area -trees (canopy + understory)
1651.4 Each
$150.00
$247,702.50
2 Small shrubs & grasses
1651.4 Each
$31.06
$51,282.74
FREIGHT
Each
$5/tree; $0.5o/shrub
$9,082.43
Note: plant count based on 289, 400-sf planting units (5.05 Ac. Mitigation)
Riparian buffer option, Table B, option 131 (bare root seedlings or whips at 1,210 stems per Ac., 6' x 6' OC)
(landward 50 -ft ofstream buffer) ; NO canopy or understory trees, since outside streamward 50 -ft of buffer
3 Mitigation Area -trees (canopy + understory) 0 Each $1.00 $0.00
4 bare root seedling or whips - 600/Ac. Min. survival required at end of 2 grc 6110.5 Each " $0.88 $5,377.24
VDOF pricing (2018) = $0.44± /ea. x 2 (installation)
Riparian buffer option, Table B, option B2 (container grown seedling tubes at 700 per Ac. , 8'x 8' OC)
(landward 50 -ft of stream buffer) ; NO canopy or understory trees, since outside streamward 50 -ft of buffer
5 Mitigation Area -trees (canopy + understory) 0 Each $1.00 $0.00
6 seedling tubes - 490/Ac. Min. survival required at end of 2 growing seasons Each $5.00 $0.00
* Each 400 sf planting unit to receive:
For every 400 square -foot unit (20'x20') or fraction thereof plant:
cost sum $313,444.91
one (I) canopy tree @ 1'/2„ - 2„ caliper or large evergreen @ 6' prej R;gn;t $0.00
two (2) understory trees @'/4„ — 1 '/2„ caliper or evergreen @ 4' contingency $31,344.49
or one (1) understory tree and two (2) large shrubs @ 3'-4'
three (3) small shrubs or woody groundcover @ 15„— 18„ Total $344,790
Shipping /freight estimate of $5/ea. per large caliper plant is based upon Waynesboro Nurseries delivery
of 22 plants, Waynesboro to Crozet, VA, $175 freight, Oct. 2016 /Invoice available, price not increased.
Also: please Note, Waynesboro Nurseries $128.00 unit price /Oct. 2016 -does not include installation.
7/3/2018
7/3/2018