Loading...
HomeMy WebLinkAboutSDP201800052 Calculations 2018-07-10BROOKHILL INITIAL STORMWATER MANAGEMENT CALCULATIONS PACKET (Blocks 9-11) Date of Calculations July 9, 2018 PREPARED BY: COLLINS " NGINErgING 200 GARRETT STREET, SUITE K CHARLOTTESVILLE, VA 22902 434.293.3719 PH 434.293.2813 FX www.collins-engineering.com PROJECT SUMMARY This project is part of the Brookhill Development, and stormwater treatment is provided to mitigate the impacts from the proposed improvements. The stormwater management plan will comply with part IIB SWM requirements. WATER QUALITY SUMMARY The stormwater quality requirements for this development are met through three best management practices. The best management practice of installing a centralized level II wet pond will be implemented. This BMP will treat the bulk of the proposed residential development. Downstream from the development the plan proposes the best management practice of preserving open spaces. A recorded easement will be provided protecting these areas prior to the issuance of a land disturbance permit for this project. The remaining water quality requirements will be met with the best management practice of purchasing nutrient credits. WATER QUANTITY SUMMARY The proposed development outfalls in multiple locations immediately upland of various existing channels. Where road / infrastructure extensions are proposed leading to the new residential development, adequate outfalls are provided with subareas less than 1% of the receiving channels' watersheds. Additionally, where the bulk of the development occurs a proposed wet pond will be installed capturing the vast majority of the new residential area. This facility will provide detention to mitigate the impacts from the majority of the proposed development. Channel and flood protection requirements set forth in 9 VAC 25-870-66 will be met with the final VSMP plan. SCS TR-55 Calculations Soils Mapping (Source: NRCS Web Soil Survey Online Database) X « � \ «. \� � _ 4- 41 9 V L , � /\\\\y� Soils Table (Source: NRCS Web Soil Survey Online Database) Albemarle County, Virginia (VA003) Albemarle County, Virginia (VA003) Map Unit Map Unit Name Percent of symbol AOI 27B Elioak loam, 2 22.10l0 to 7 percent slopes 27C Elioak loam, 7 13.1% to 15 percent slopes 34C Glenelg loam, 7 6.4% to 15 percent slopes 34D Glenelg loam, 6.811l0 15to25 percent slopes 39D Hazel loam, 15 46.60l0 to 25 percent slopes 95 Wehadkee silt 3.00l0 loam Totals for Area of 1OO.00/O Interest Note: Soils' properties witin this property are predominantly composed of hydrologic type B soils. Precipitation Data (Source: NOAA's National Weather Service, Hydrometerorological Design Studies Center, Atlas 14 Point Precipitation Frequency Estimates) Map v Ten'pler�4 ..p O tiyay64 G m � cE y�e'k Malden%-n ❑� Terrain a C.14 Ro¢}n �n bP5 3� a�,uv o ��t odd,n9 ° Q, ex; Powell creek Dr * G P oes Ln O IQrnrld9t am 2e I m E 4 - d7 a R �4f4,�rf1� Ra K 64 •� 0e — 0.4 knr .2mi IF s Polo Grcunas d POINT PRECIPITATION FREQUENCY (PF) ESTIMATES WITH W/o CONFIDENCE INTERVALS AND SUPPLEMENTARY INFORMATION NOAA Atlas 14, V011llne 2, Version 3 PDS-based precipitation frequency estimates with 90% confidence intervals (in inches)' Duration Average recurrence inWrval (years) 50 1 2 5 1D 25 100 2D0 50D 10D0 ����� 3.00 3.62 4.63 5.47 6.72 7.79 8.97 10.3 12.2 13.9 24-hr (2.69-3.37) (3.25-4.08) (4.14-5.20) (4.88-6.14) (5.95-7.51) (6.36A.69) (7.83-9.99) [8.87-11.4) {1D.4-13.6) (71.6-15.4) U.S. Department of Agriculture Natural Resources Conservation Service TR 55 Worksheet 2: Runoff Curve Number and Runoff FL-ENG-21A 06/04 Project: Brookhill Development Designed By: FGM, PE Date: 7/9/2018 Location: Blocks 9-11 Checked By: SRC, PE Date: 7/9/2018 Check One: Present X Developed 1. Runoff curve Number (CN) Soil name and Cover description CN (weighted) _ Drainage Area hydrologic group (Cover type, treatment, and hydrologic condition; percent CN Area Product of CN total product/ Calculated Description (Appendix A) impervious; unconnected/ connected impervious area ratio) (Acres) xArea total area 'S'Value DA A Impervious Areas 98 0.00 0.0 (Present) B Woods in Good Condition 55 10.55 580.3 55.0 8.18 Lawns in Good Condition (75%+Groundcover) 61 0.00 0.0 DA A Impervious Areas 98 6.22 609.3 (Developed) B Woods in Good Condition 55 0.14 7.7 82.7 2.09 Lawns in Good Condition (75%+Groundcover) 61 4.19 255.8 2. Runoff 1-Year Storm I 2-Year Storm I 10-Year Storm JDrainage Area Description Frequency -years 1 2 10 n/a Rainfall, P (24 hour)- inches 3.00 3.62 5.47 n/a Runoff, Q- inches 0.19 0.39 1.22 DA A (Present) Runoff, Q- inches 1.43 1.94 3.57 DA A (Developed) U.S. Department of Agriculture Natural Resources Conservation Service TR 55 Worksheet 3: Time of Concentration (TJ or Travel Time (Tt) Project: Brookhill Development Location: Blocks 9-11 Check One: Present X Developed X Check One: Tc X Tt Segment ID Sheet Flow: (Applicable to Tc only) 1 Surface description (Table 3-1) 2 Manning's roughness coeff., n (Table 3-1 3 Flow length, L (total L < 100) (ft) 4 Two-year 24-hour rainfall, Pz (in.) 5 Land slope, s (ft/ft) 6 Compute Tt = [0.007(n*L)0.8] / Pz .s so.a Designed By: FGM, PE Checked By: SRC, PE Through subarea n/a FL-ENG-21A 06/04 Date: 7/9/2018 Date: 7/9/2018 DAA DAA (Present) (Developed) Woods- Light Woods- Light Underbrush Underbrush 0.4 0.4 100 100 3.62 3.62 0.03 0.03 0.29 0.29 Shallow Concentrated Flow: 7 Surface description (paved or unpaved) Unpaved Unpaved 8 Flow Length, L (ft) 330 90 9 Watercourse slope, s (ft/ft) 0.167 0.233 10 Average velocity, V (Figure 3-1) (ft/s) 7.6 7.8 11 Tt = L / 3600*V 0.01 0.00 Channel Flow: 12 Cross sectional flow area, a (ft) 13 Wetted perimeter, P, (ft) 14 Hydraulic radius, r = a/P, (ft) 15 Channel Slope, s (ft/ft) 16 Manning's Roughness Coeff, n 17 V= [ 1.49r2/3s05 ] / n 18 Flow length, L (ft) 19 Tt= L / 3600*V 20 Watershed or subarea Tc or Tt (Add Tt in steps 6, 11 and 19) 0 3 0 v o a t -1 0 06 U @) , -0 Ln 0 0 o 0- U @) o 0 - 0 N v zn r` i+ v7 N 0.06 0.04 0.36 1 0.33 U.S. Department of Agriculture Natural Resources Conservation Service TR 55 Worksheet 4: Graphical Peak Discharge Method Project: Brookhill Development Designed By: FGM, PE Location: Blocks 9-11 Checked By: SRC, PE Check One: Present X Developed X FL-ENG-21C 06/04 Date: 7/9/2018 Date: 7/9/2018 1. Data Drainage Area Description Drainage Area Description Drainage Area Description Drainage Area Description DA A (Present) DA A (Developed) Drainage Area (Am) in mileS2 = 0.0165 0.0165 Runoff curve number CN= 55.0 82.7 Time of concentration (Tc)= 0.36 0.33 Rainfall distribution type= II II Pond and swamp areas spread throughout the watershed= 0 0 2. Frequency -years 1 2 10 1 2 10 3. Rainfall, P (24 hour)- inches 3.00 3.62 5.47 3.00 3.62 5.47 4. Initial Abstraction, la- inches 1.64 1.64 1.64 0.42 0.42 0.42 5. Compute la/P 0.55 0.45 0.30 0.14 0.12 0.08 6. Unit peak discharge, Qu- csm/in 230 375 525 625 625 650 7. Runoff, Qfrom Worksheet 2- inches 0.19 0.39 1.22 1.43 1.94 3.57 8. Pond and Swamp adjustment factor, Fp 1 1 1 1 1 1 1 9. Peak Discharge, Qp- cfs where Qp=Qu Am Q Fp 0.74 2.39 10.59 I To be Routed in the SWM Facility w/ WPO WATERSHED SUMMARY CN Area, ac. 1-year Flow, cfs 2-year Flow, cfs 10-year Flow, cfs DA A (Present) 55.0 10.55 0.74 2.39 10.59 DA A (Developed) 82.7 10.55 (To be Routed in the SWM Facilitv w/ WPO) WET POND'A' DESIGN & REQUIREMENTS, AS SHOWN Treatment Volume, Tv (VRRM) 24,535 cf Minimum Treatment Volume Required for Level II Basin 36,803 cf Treatment Volume Provided at MWSE 23,288 cf Minimum Percentage of Tv Provided at MWSE 50 % Percentage of Tv Provided at MWSE 63 % Ponding Depth Corresponding to Minimum Tv Required ft Maximum Fondling Depth allowed for Minimum Tv 4 ft Maximum Percentage of Tv Provided above MWSE 50 % Percentage of Tv Provided above MWSE 37 % Minimum Forebay Volume Required (15%of Tv) 5,520 cf Forebay Volume Provided 5,868 cf Minimum Upper Wetland Shelf Area (10%of Pond Area) 1,030 sf Upper Wetland Shelf Provided 1,488 sf STORMWATER MANAGEMENT FACILITY GRADING Elevation (ft) Area of Forebay Cell Contours (sf) Volume (cf) 372 84 0 374 540 558 376 1,282 2,327 377 1,759 3,842 378 2,306 5,868 380 - - 382 384 Elevation (ft) Total Facility Area Contours (sf) Volume (cf) 372 614 0 374 2,019 2,498 376 4,895 9,203 377 6,578 14,919 378 10,300 23,288 380 13,435 46,954 382 16,527 76,863 384 19,848 113,187 Elevation (ft) Area of Wetland Cell Contours (sf) Volume (cf) 372 374 - - 376 700 0 377 1,059 873 378 1,488 2,141 380 - - 382 384 Elevation (ft) Area of Main Cell Contours (sf) Volume (cf) 372 530 0 374 1,479 1,930 376 2,913 6,241 377 3,760 9,569 378 6,506 14,640 380 - - 382 384 Notes: 1 A minimum forebay volume depth of 4' with an aquatic bench 4' wide, 2' deep has been provided. 2 A minimum forebay volume of 15%of the total Tv has been provided. 3 A wetland maximum treatment volume depth of 12" has been provided. 4 A 10' wide aquatic bench ranging from 12"-18" in depth has been provided. 5 The minimum treatment volume required has been provided. Virginia Runoff Reduction Method Water Quality Calculations DEQ Virginia Runoff Reduction Method New Development Compliance Spreadsheet - Version 3.0 ® 2011 BMP Standards and Specifications P 2013 Draft IMP Standards and Specifications Project Name: BrookhiR Development- Blocks 9-11 Date: 7/9/2018 BMP Design Specifications List: 2011 Stds & Specs Site Information Post-Develooment Proiect (Treatment Volume and Loads) Land Cover (acres) A Soils BSolis CSoils DSoils Totals Fomst/Open Space (acres) — undisturbed, protected forest/open space or reforested land 12.71 12.]1 Managed Turf (acres) — disturbed, graded for 12.52 ards or other turf to be owed/managed 12.52 Impervious Cover (acres) 10.11 10.11 Forest/Open Space ace as most be protected in oc ..donce with the Virginia RuneNReduction Method 35.34 Constants Annual Ralnfall(inches) 43 Target Rainfall Event linches) 1.00 Total Phosphorus(TP) EMC(mg/L) 0.26 Total Nitrogen(TN) EMC(mg/L) 1.86 Target TP Load (lb/acre/yr) 0.41 PJ(unitless correction factor) 0.90 Land Cover Summary Forest/Open Space Cover (acres) 12.71 Weighted RV (forest) 0.03 %Forest 36% Managed Turf Cover (acres) 12.52 Weighted Rv(turf) 0.20 %Managed Turf 35% Impervious Cover (acres) 10.11 RV (impervious) 0.95 %Impervious 29% Site Area (acres) 35.34 Site RV 0.35 Runoff Coefficients (Rv) Treatment Volume and Nutrient Loads Treatment Volume 1.0408 (acre-h) Treatment Volume (cubic feet) 45,338 TP Load (lb/yr) 28.49 TN Load (Ib/yr) final results Drainage Area A D.I..A— vastorn ­.1 --.1 1.— m — A Wl IAIII 11, ��l AIIA I"ICI 11 Toro auxorr arournox ix A ' DI bll :b D �A hL::Z� o mom —1 IIDIIII" I" D.1 A (a'j aRvoDra —.— -1. D—I.. I—C. 1. D.1 A vwrl L— 0 AVIN DA. A (lNhIj