Loading...
HomeMy WebLinkAboutSDP201800041 Review Comments Initial Site Plan 2018-07-11COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 July 11, 2018 Jim Taggart Roudabush, Gale & Associates 914 Monticello Road Charlottesville, VA 22902 jta,ggart@roudabush.com RE: SDP201800041 Belvedere Phase 5 — Initial Site Plan Dear Mr. Taggart: The Site Review Committee has reviewed the development proposal referenced above. Initial comments from the following divisions of the Department of Community Development and other agencies, as applicable, are attached: Albemarle County Planning Services (Planner) Albemarle County Engineering Services (Engineer) (attached) Albemarle County Information Services (E911) (attached) Albemarle County Building Inspections (attached) Albemarle County Department of Fire Rescue (attached) Albemarle County Service Authority (attached) Rivanna Water and Sewer Authority (attached) Virginia Department of Transportation Thomas Jefferson Health District (attached) Comments reflect information available at the time the development proposal was reviewed, and should not be considered final. However, the Site Review Committee has attempted to identify all issues that will be required to be resolved prior to Final Site Plan approval. Prior to initial site plan approval a resubmittal of the plan is required. The applicant shall request the project be deferred to allow required revisions. Please contact me at your earliest convenience if you have questions or require additional information. z Senior Planner Albemarle County Planning Services (Senior Planner) — Paty Saternye, psaternye@)albemarle.org — Required changes: Prior to initial site plan approval, at a minimum, comments 1-5 shall be addressed in a resubmittal. The agent must take action on the initial site plan by Friday July 20, 2018 unless a deferral is requested by the applicant. Staff highly recommends requesting a deferral in order to allow ample time for revisions and review of the required changes. Comments to be addressed prior to the Initial Site Plan approval: 1. Pay the required notices fee of $215. [32.7.2.21 Provide a street connection to TMP62-16A. TMP62-16A is designated for development in the Comprehensive Plan and is within the Development Area. Any additional street connections provided will be considered voluntary unless required by one of the other Site Review Committee reviewers. However, even voluntary connections should be shown in the initial site plan since the addition of such connection significantly impacts the layout of the development. Section 32.7.2.2 of the County Code specifies that all streets within a development shall: a) Coordinate as to location, width, grades and drainage with other streets. This includes, but is not limited to, existing or future subdivisions or developments and by continuing the existing or planned streets into adjoining areas by dedication or reservation of right-of-way. b) Be extended and constructed to the abutting property lines to provide vehicular and pedestrian interconnections to future development on adjoining lands, terminating within the development with a temporary turnaround. The arrangement of the streets shall provide adequate access to adjoining lands within the development where necessary to provide for the orderly development of the county including, but not limited to, reserving temporary construction easements of sufficient area to accommodate the future completion of the street when the adjoin lands are developed. 3. [32.5.2 b, 32.5.2 n & 4.161 Show and specify the square footage of, and fencing for, the recreational areas 9,000 SQFT are required (200 SQFT per unit) and not shown or specified on the site plan. This site plan is not part of the Belvedere NMD and therefore must meet the recreational requirements within this site plan. Ensure that the areas specified meet all requirement. 4. [32.5.2(b) & 17.3] Revise the "Proposed Use" portion of the coversheet data to specify that the site plan is a "Cluster Development", or increase the lot sized in order to meet the minimum lot size of a the R-4 "Conventional Development". The lot sizes shown do not meet the minimum lot size for "Conventional Development'. [32.5.2(a), 32.5.2(i)] Existing or platted streets. Label the street public. The applicant has stated that the road will be a public road, but this is not specifically stated on the site plan. Comments to be addressed with the Final Site Plan submission: 6. A site plan meeting all the requirements of section 32.6 of Chapter 18 of the Code. [32.5.2(b)] Dedication of open space. Provide the following note: "Open Space is hereby dedicated to the HOA. " Provide information on the HOA that will be maintained the open space. Ensure that the open space will be owned and maintained by an HOA. [32.5.1, 32.5.2(a), 4.191 Yards. On sheet ensure the full description for the setbacks is provided. Ensure that all setbacks shown on the plan are accurately labeled. The minimum building separation appears to be shown as the side setback on the plan, but not specified as such and what appears to be shown as the front setback is the garage setback. Front Minimum - 5 feet from the right-of-way or the exterior edge of the sidewalk if the sidewalk is outside of the right-of-way Maximum — 25 feet Garage Minimum - Front loading garage: 18 feet from the right-of-way or the exterior edge of the sidewalk if the sidewalk is outside of the right-of-way Side loading garage: 5 feet from the right-of-way or the exterior edge of the sidewalk if the sidewalk is outside of the right-of-way Maximum - None Side Minimum - None; see Non-Infzll Building Separation Maximum — None Non-Infill Buildinjj Separation Minimum - 10 feet unless the building shares a common wall Maximum — None Rear Minimum — 20 feet Maximum — None 9. [32.5.2(c)] Phasing lines. Provide a note specifying that the phasing and timing of the development is after the development of Phase IIB. Clearly delineate what improvements are proposed with this site plan and what is to be approved with other phases and submissions, such as Belvedere Phase IIB. 10. [32.5.2(b), 32.5.2(n), 32.5.1(c)] Dimensions. On the plan depict and dimension all proposed improvements, including buildings, driveways, and garages. This includes the single family detached lots. Since they have been included in this site plan the level of detail and information provided must be at the same level as the single family attached lots shown on the plan. 11. 132.5.2(a), 32.5.2(b), 32.5.2(i)] Information regarding the proposed use. Provide the acreages for each proposed residential lot and open space area. Lots 25 & 26, as well as the open space lots, are not shown in the "Lots Areas Table" on sheet 8. The areas of each lot must be provided. 12. [32.5.2(a), 32.5.2(i)] General Information. Revise the labeling of Fowler Street to "proposed" public street, as this road is not existing. And specify the site plan in which it is proposed. 13. [32.5.2(k)] Private & public easements. Address the following: a) Provide the location and dimension of all existing and proposed private and public easements. b) Note that in addition to other possible easement there appears to be the need for offsite easements. Show all required easements. 14. [32.5.2 (e), (n) 32.6.20) & 32.7.9.4 (c)] Address the following: a) Preserve all existing trees that are to remain. There are "Tree Save Areas" within the site. if they are to remain include the following: i. Areas and other features shown on landscape plan. The landscape plan shall show the trees to be preserved, the limits of clearing, the location and type of protective fencing, grade changes requiring tree wells or walls, and trenching or tunneling proposed beyond the limits of clearing. ii. Conservation checklist. The applicant shall sign a conservation checklist approved by the agent to ensure that the specified trees will be protected during construction. Except as otherwise expressly approved by the agent in a particular case, the checklist shall conform to the specifications in the Virginia Erosion and Sediment Control Handbook, pages III-393 through II1-413, and as hereafter amended. b) On the existing conditions sheet label the area of existing trees with the type of trees (evergreen, deciduous, or a mix of both) and show areas where existing vegetation will be removed. c) Ensure that all "Tree Save Areas" have trees in them and ensure areas which do not have woods are not included in the areas or in the calculation for the areas. As shown on sheet 7, there is an area in the southern corner of the lot that is designated as a "Tree Save Area" where there is a gap in the existing tree line. d) Ensure that the street trees shown will be allowed will be allowed and if not that alternative locations are provided either within or outside of the right-of-way. If the trees will be outside of the right-of-way landscaping easements will be required with ownership and perpetual maintenance of the easements and landscaping put in place prior to the final site plan approval. 15. [32.5.2(i) & (n)] Address the following: a) Dimension the width, and centerline radii, and corner radii of all roads and ensure that the roads meet or exceed minimum road requirements. Note that although road centerline is provided on sheet 3 in a table the corresponding labels are not provided in the plan on the same page. The labels must be provided. b) Show the location of any outdoor lighting. Any free standing or building mounted lighting, including front porch lights, must be shown in a photometric plan and meet all requirements. Ensure all lighting meets County requirements. 16. [32.5.2(1)] Provide the location of any existing or proposed utilities and utility easements including telephone, cable, electric and gas. Indicate the deed book and page reference for all exiting utility easements located on the property. 17. 132.5.2(e), 32.5.2(p) & 32.7.9] Provide a full landscape plan that provides all required landscaping, calculations and meets the landscaping requirements for 32.7.9. Ensure all calculations and graphics correctly represent the existing and proposed plantings and planting areas. Address the following: a) The tree canopy for the Elms is incorrect and therefore the canopy total calculation is also incorrect. b) The trees provided in the calculation area is incorrect. Revise to be correct total. 18. [32.5.2(b) & 32.5.2(n)] The number of required guest spaces are specified as being met within the lot. However, no driveways or garages are shown on the site plan. Address the following: a) Depict the parking in both the driveways and the garages in the site plan. b) Dimension the parking and/or driveways in the site plan. c ) Revise the schedule of parking two include a separate calculation for Single Family Detached and Single Family Attached. They have different requirements. • Note that if sufficient parking is not provided within the lots street parking may be required. 19. 132.5.2(b) & 17.31 Show in the Site Data, for the requirements of the Cluster Development, the percentage and acreage of open space. 20. [32.5.2(n) & 4.71 Ensure that the open space areas are not comprised of over 80% of the items specified in 4.7(c)(3) Limitation on certain elements. 21. [32.8.21 Infrastructure improvement plans. All infrastructure required to construct Phase 5 shall be reviewed, approved, and built or bonded before the final plat and/or final site plan can be approved. This includes all offsite improvements required to serve the development, including road plans, WPO plan, water and sewer connections, some of which are part of Phase IIB. 22. [32.5.2 a] General information. a) Provide the county and state under the project title on the cover sheet. b) Provide the current name of the owner, zoning district, tax map and parcel number and present use of abutting parcel shown as "preservation area" and Lots 197 through 201. These lots have not been subdivided and are one parcel. Provide all the required information for that parcel and show it as it currently exists. 23. [32.5.2 b] Information regarding the proposed use. a) [32.5.2 b, 32.5.2 n & 4.16] Provide the required recreational facilities/tot lot and address the following: i. Show and include the details of the recreational equipment in the final site plan. ii. Show and provide details for the required fencing in the final site plan. iii. Show pedestrian connections to the tot lot that includes handicapped ramps and warning strips in the final site plan. b)Revise the maximum amount of impervious cover on the site to include the buildings and not just the roads and sidewalks. 24. [32.5.2 d] Topography and proposed grading. Show the steep slopes in one of the plan sheets that shows the proposed buildings so that the impact of the proposed development on the steep slopes can be evaluated. 25. [32.5.2 i] Streets, easements and travelways. Address the following: a) Show the existing and proposed streets and ensure that streets that do not exist are not shown as already existing. If they are proposed on a different site plan, that is expected to be built prior to this project, then specify that on this site plan and include the SDP number for that other site plan. b) Show the existing and proposed sidewalks and ensure that sidewalks that do not exist are not shown as already existing. If they are proposed on a different site plan, that is expected to be built prior to this project, then specify that on this site plan and include the SDP number for that other site plan. 26. [32.5.2 j] Existing sewer and drainage facilities. There are waterlines shown on the site plan as "existing" that do not appear to exist. If they are proposed on a different site plan, that is expected to be built prior to this project, then specify that on this site plan and include the SDP number for that other site plan. 27. [32.5.2 k] Proposed sewer and drainage facilities. Indicate the direction of flow in all pipes and watercourses with arrows. 28. [32.5.2 0] Areas to be dedicated or reserved. Add a note on the plan stating that "All new public street right-of- way shown hereon are hereby dedicated to the County for public use." 29. [Comment] Provide a copy of all off -site easements, or letters of intent to grant them from off -site property owners. 30. [Comment] An instrument assuring the perpetual maintenance of the open space areas, and any other improvements that are to be maintained by the HOA in perpetuity require County Attorney approval prior to final site plan approval. 31. [Comment] Grading is proposed into a "Preservation Area" of Belvedere. No impact on "Preservation Areas" is allowed. Revise the grading to no longer impact that area. 32. [Comment] See the other SRC reviewer comments attached. All SRC reviewer comments must be sufficiently address prior to final site plan approval. Please contact Paty Saternye in the Planning Division by using psaternye(a-)-albemarle.org or 434-296-5832 ext. 3250 for further information. Review Comments for SDP201800041 11nitial Site Plan Project Name: BELVEDERE PHASE 5 - INITIAL Date Completed: Sunday, July 01, 2018 DepartmentlaivisionlAgency: Review Status: Reviewer: Lshawn Maddox Fire Rescue Requested Changes 1 _ Cul-de-sac must be a minimum of 99 diameter- _ Hydrant spacing appears to exceed 250' from any point on street or road frontage to a hydrant- 3- Developments of one- or two-family dwellings where the number of dwelling units exceeds 30 shall be provided with two separate and approved fire apparatus access roads- 4- Building heights are proposed to be 35'_ If this is the case then the required unobstructed width of the travel lane shall be 26' to allow for aerial fire apparatus access- 5- The street as shown would be required to be marked no parking on both sides- 6- Afire flow test will be required before final acceptance Page: County of Albemarle Printed On: 10710312018 COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper Virginia 22701 Stephen C. Brich, P.E. Commissioner July 6, 20I8 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Paty Saternye Re: Belvedere Phase 5 - Initial Site Plan SDP-2018-00041 Review #1 Dear Ms. Saternye: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Roudabush, Gale, & Associates, dated 21 May 2018, and offers the following comments: I . It appears as though with the current number of units in Belvedere that a 4'h connection or stubout is required. Based on the fact that further development is likely it appears that this addition would be eligible for an SSAR connectivity exception. Has an SSAR connectivity exception been approved for Belvedere? 2. The proposed section of Fowler Street should match the existing section. 3. Provide roadway geometry. 4. Note that the final site plan must show conformance with the VDOT Road Design Manual Appendices B(1) and F, as well as any other applicable standards, regulations or other requirements. Please provide two copies of the revised plan along with a comment response letter. If further information is desired, please contact Justin Deel at 434-422-9894. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING eb VIhGLN1P County of Albemarle Department of Community Development Memorandum To: Patricia Saternye From: Emily Cox Date: 3 July 2018 Subject: Belvedere Phase 5 - ISP (SDP201800041) The initial site plan for Belvedere Phase 5 has been reviewed by Engineering. The following comments will need to be addressed before approval: 1. WPO Plan must be submitted and approved before final site plan can be approved. 2. Road Plan must be submitted and approved before final site plan can be approved. 3. Per the Engineering Design Standards Manual, Section 8, any slopes steeper than 3:1 must have low maintenance (not grass) ground cover specified on the plans. Please add this note on the plan for any slopes steeper than 3:1. 4. Topography/land survey/existing conditions must be updated on final site plan/road plan/WPO plan. It should at least be field verified within the last year. Plans state the source is dated 2016. 5. Ensure preserved and managed slopes, WPO buffer, floodplain, etc are shown on all applicable sheets. 6. Ensure steep slope overlay district code is met (Chapter 18 - Section 30.7). 7. Grading is shown offsite (behind lots 21/22). Ensure you have permission or an easement for this grading/earthwork. 8. Sheet 5 references a preservation easement, but the boundary is not clear. Ensure this easement is not violated by any proposed work. Review Comments for SDP201800041 11nitial Site Plan Project Name: BELVEDERE PHASE 5 - INITIAL Date Completed: Thursday, June 28, 2018 DepartmentlaivisionlAgency: Review Status: Reviewer: Victoria Fort RA I I Requested Changes 018-06-8: RWA has reviewed the initial site plan for Belvedere Phase 5 as prepared by Roudabush, Gale &Associates, Inc- } and dated May 21, 2018 and has the following comments: General Comments: 1- An RWSA sewer flow capacity certification will be required prior to final site plan approval since the overall Belvedere Development produces sewage flow in excess of 40,000 gallons per day- - Include the RWSA General Notes on the plan (attached) - Sheet 05 of 08: 1- Label RWSA manhole as SRWSA RVI-MH-50" and call out invert elevations - Label RWSA sewer main as SRW A48" Sanitary Sewer Main" 3- The ACSA easement should extend beyond the RW A sewer main (the two easements will overlap) 4- Include a sanitary sewer profile in the final site plan showing the proposed 8" sewer connection- s- Include the following RWA sanitary sewer connection notes this sheet: a- All connections to RWA manholes shall be watertight and made with a flexible rubber boot- b- All coring methods, the coring contractor and all materials for construction shall be approved by RWA in writing prior to construction- c- RWA Engineering Staff shall be present for all cores into the manholes- d- Bypass pumping may be required at the sole discretion of RA staff- e- Grouting of the manhole bench or interior may be required, at the sole discretion of RA staff, for a smooth transition of flow- f- Existing manholes shall be backfilled to original grade to the satisfaction of RWA- g- Contact RWSA Engineering a minimum of 3 business days in advance to schedule a core of a manhole- 6- RWSA as -built drawings indicate that the base of the manhole may be 16-1 T below finished grade- Please note that RWA does not allow internal drop connections- External drop connections should conform to RWA Detail Sewer 3 (see attached)- Note that for an existing manhole, the invert of the 8° connection should match the top of the bench (not the invert of main line, as shown)- All other requirements for a drop connection are as shown - Page: County of Albemarle Printed On: 10710312018 Review Comments for SDP201800041 11nitial Site Plan Project Name: BELVEDERE PHASE 5 - INITIAL Date Completed: Friday, June 29, 2018 DepartmentlaivisionlAgency: Review Status: Reviewer: Richard Nelson 17 ACSA H Requested Changes 018-06- 9: 1 recommend SDP 01800041 Belvedere Phase 5 — Initial for approval with the following conditions: 1) Submit 3 copies to AC Afor waterlse er review_ ) RW A sewer capacity certification will be required_ 3) RW A's comments will need to be addressed before final approval as well_ Page: County of Albemarle Printed On: 10710-T2018 Review Comments for SDP201800041 11nitial Site Plan Project Name: BELVEDERE PHASE 5 - INITIAL Date Completed: Thursday, June 14, 2018 DepartmentlaivisionlAgency: Review Status: Reviewer: Michael Dellinger CDD Inspections No Obje-Ction Page: County of Albemarle Printed On: 10710-T2018 Review Comments for SDP201800041 11nitial Site Plan Project Name: BELVEDERE PHASE 5 - INITIAL Date Completed: Tuesday, June 26, 2018 DepartmentlaivisionlAgency: Review Status: Reviewer: FI[Health Department No Obje-Ction Page: County of Albemarle Printed On: 10710-T2018 Review Comments for SDP201800041 11nitial Site Plan Project Name: BELVEDERE PHASE 5 - INITIAL Date Completed: Thursday, June 14, 2018 DepartmentlaivisionlAgency: Review Status: Reviewer: Elise Kiewra CDD E911 No Obje-Ction per site plan dated 5121118 Page: County of Albemarle Printed On: 10710-T2018