Loading...
HomeMy WebLinkAboutARB201800001 Application 2018-07-11Albemarle CoL ter Planning Application Community Development Cepartmeni clntire Road Charlottesville, VA 22SD2-4595 Voice: 41434 29&5B32 Fax: (434)972-4126 TMPJ 04-OG-00-068M Cwner(s). ROSENTHAL, ROBERT H & HARRISON NESBIr.0 & HENRY J PR] Application # A 8201800001 PROPERTY INFORMATION Legal Description �A E j PARCEL B ..:71114 PRICE CHEVIP ET Magisterial (list. Rom.. � Land Use Primary Commercial ' w Current AFD 'Not in A/F District � Current Zoning Primary Highway CGinni sercial _.. : _. APPLICATION INFORMATION Street Address 12150 SEMINOLETRL CHARLOTTESVILLE, 22941 Entered By Application Type Architectural. Review Board � 6L6 SmithJennifer Sm Project PRICE HYUNDAI & TRUCK MALINT. - AMENDMENT Received Date 12/29/17 Received Date Final Submittal Date 011022118 Total Fees 2+42 Closing File Date Submittal Date Finall' i Total Raid 242 Revision Number Comments r .� Legal Ad SUB APPLICATION(s) T _ Sub icatii _ -_ _ _ ' - Amendment to Site Development Plan -.- : O1/02/18 APPLICANT f CONTACT INFORMATION CorladType J Name Address i GiyStaie Zip Phone RmeUl 5--,4W5—.t ROSENTHAL, ROBERT H & HARMON ili! -Y C-r"tae € BOB ANDERSON - LIrTLE RHINO I P 0 BOX 7463 CHAPLOTTE54ILL 229DG f P 0 BOX 2257 CHARLOTTESkIILL i 229132 14349962457 Signature of ContractororRuthorized Agent fate A �' M Architectural Review Board -- +� Amendment to a Site Development Plan Submittal Requirements Checklist Part A: Applicant Contact and Parcel Information Project name: P`r Ge y rc n c}ctti rfu �� Y(A iYt'C. ARB # Tax map and parcel #: 04-T0000000 G'800 Physical street address (if assigned): 2,160 S eW Yi0 I i✓ -rYzt i l Location of property (landmarks, intersections, or other): %Usst, 5 l" of 'Rt-:991t �C S. of H; Ito" }lts R d, Contact person: lba,b Ayi J-e+,.5a Y; Business name: L ilif e IMh im `Jt`ud�o Fc, Address: ' o 13yK 2257 City: Ghjjrle � State: — Zip: Daytime phone: 434.99L.•1457 Fax: Email: bc,6- itge-Aiy *t!4�a Yda-1 .L4)V Part B: Revisions to a CofA 1 Amendment to a SDP Requirements Checklist Important Note: Submittal packages must contain (8) collated copies of all information unless otherwise indicated. A. Written description of the proposal [►Provide a description of the revised/amended proposal. Identify all proposed changes from the previously approved submittal. [Provide a revised materials list if any of the building materials or material color(s) have changed. B. Site plan showing the following (drawn to the scale of 1' =2Q , clearty legible and folded): ❑ Show all proposed changes to the previously approved plan including site layout, landscaping, lighting, and all site features, with changed features clouded and clearly identified on the plan. ❑ Sheet number, total number of sheets, date of the drawing, date and description of the latest revision, and contact information for the firm preparing the drawings in the title block on all drawings. ❑ Provide the original plan and existing conditions. C. Appearance of the building(s) (architectural elevations, color perspective sketches, site sections): dimensioned architectural elevations of the proposed building(s) showing all changes to the previously approved building(s) design. Elevations must be drawn to a minimum scale of '1/16"=1'-Q". A larger scale may be required. Include a building materials schedule and key on the elevation drawings. E /One set of all building materials / colors if changed from the previously approved submittal. 1 �2� a O-Xj��-A 1 Revised 712allO D. Additional material The applicant is welcome to submit any additional material that will make the revision to a certificate of appropriateness/amendment to a site development plan review more productive. Drawings or other submittal items that clarify topography, visibility, utilities, landscaping, or other unique or unusual conditions are welcome. Part C: Applicant Agreement Applicant must read and sign • Each application package must contain (8) folded copies of all plans and documents being submitted. Only (1) set of building material samples is required if the building materials have changed. All submittal items, including building material samples, become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies of all submittal items in their own files. • All information in this checklist is required, unless specifically waived by the ARB, prior to processing a revision to a certificate of appropriateness / amendment to a site development plan review by the ARB. Additional submittal materials may be required, depending on the proposal. • Only complete application packages will be scheduled for ARB review. The application_ package is not complete without this checklist, completed, signed, and included with the required submittal materials indicated on the checklist In representing the above referenced firm submitting this application for review, / hereby state that the information provided in this application, and all accompanying information, is accurate, true and correct to the best of my knowledge, and that the attached plans contain all information required by this checklist. Signature of person completing checklist -P4t r t b- Ayx1 mj,3 o", A i A Printed Name 1 Title _ 12-12`r&0 [7 Date T (434) act( - Z127 Daytime phone number of Signatory County of Albemarle Department of Planning and Community Development 401 McIntire Road, Charlottesville, VA 22902-4596 (434) 296-5832 Tel, (434) 972-4126 Fax www.albemarle.oro 2 Revised 7/28/10 J a LITTLE RHINO STUDIO PC architecture December 29, 2017 PRICE HYUNDAI ARB AMENDMENT TO A SITE DEVELOPMENT PLAN SUBMITTAL SUPPLEMENTARY SHEET TO PART A: DESCRIPTION OF PROPOSAL As a result of new corporate design guidelines from the Hyundai Corporation, changes to the October 24, 2016 submission are being proposed to the design as follows: 1. Utilities behind the building would not allow for the addition that was originally proposed for the back (west) of the building. That fagade and adjacent site conditions will remain as they are now, with no changes proposed. 2. The existing structural system would not allow a mezzanine with suitable head height so the owners are forced to locate it at the front of the building in the proposed addition, rather than attempting to fit it into the existing area at the rear of the building. This has resulted in raising the facade along the front by 4'-5". The raised portion is finished in EIFS and has a medium bronze cap. Color is a light tan. The height, finish, and design of the ACM panels is unchanged. 3. The sign, "Price" has been added to the left side of the facade. 4. The storefront system has been changed to a system of butt -glazed glass with an interior supporting framing system. The glass spec is unchanged. The framing system is no longer a visual element as viewed from the exterior. 5. The columns inside the glass have been changed from 2' x 2' white columns to the new corporate design which uses (3) inclined 6" columns, painted green. 6. The site plan is unchanged with the exception of the proposed addition at the rear of the building (see 1, above). The new height of this elevation is close to what the original (first) submission showed as a height, when it was a large blue square over the door. The revised height is more in -scale with the adjacent Chevy showroom building. Material changes: All ACM panels remain the same as in the last submittal. All glass remains as it was in the initial submittal. Window and door framing system has been revised (no. 4, above). All landscaping as seen from the highway remains as it was in the initial submittal. No new site lighting has been added to the project. All lighting remains as it was in the initial submittal with the exception of soffit mounted lighting at the building perimeter. Soffit lighting will not be used due to the reduced overhang of the soffit. Post Office Box 2257, Charlottesville, Virginia - • (434) 996-2457 - - littlerhino.com