Loading...
HomeMy WebLinkAboutSDP201800007 Correspondence Initial Site Plan 2018-04-16 Christopher Perez From: Christopher Perez Sent: Monday,April 16, 2018 11:10 AM To: Scott Collins Subject: 4-16-18 SRC Action Letter_SDP2018-7 North Pointe -Initial Site Plan Attachments: 4-16-18 SRC Action Letter_SDP2018-7 North Pointe -Initial Site Plan.pdf;TJSWCD Soil Report.pdf Scott, Attached is the SRC action letter and the soil reports for the site. Please be aware VDOT, Engineering, and Planning revised their comments since SRC (see attached). Christopher P. Perez 1 Senior Planner Department of Community Development 1County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext. 3443 1 Christopher Perez From: Christopher Perez Sent: Thursday, April 12, 2018 9:05 AM To: Greg Kamptner; John Blair Cc: Bill Fritz; David Benish Subject: RE: SDP201800007-North Pointe Northwest Residential Area—Initial Site Plan Attachments: SRC Comments for CD1_SDP2018-7 North Pointe - Initial Site Plan 4-11-18.pdf; Letter of Opposition from Incheon Holdings, LLC. (TMP 32-22K1).pdf Greg/John, RE: SDP201800007-North Pointe Northwest Residential Area—Initial Site Plan Attached are the current site review committee(SRC) comments for the proposal. Please note comment/condition#1 in my letter addresses the preservation of the 30' and 50' easements from retaining walls, storm sewer pipes, and drainage pipes (in the rear yards of Lots 22-35). However, at this time the comment does not speak to the median strip, the sidewalks,the landscape strip, the building sites for lots 22-35, or the monument sign which are all proposed within the easements. Additionally, there is a portion of a private road, a fire hydrant, and the portion of the sanitary sewer lines which run through the easement. Prior to final action on the plans I would like to discuss these items with either you or John Blair to decide if I need to also include these items in the comment to be omitted from the access easements prior to action on the plans. 1)My initial thoughts are the median strip, the sidewalks, and the landscape strip do not need to be omitted from the private access easement because they are part of the proposed Lewis and Clark Drive (public road) being constructed with this section of North Pointe, nor do they prohibit use of the access easement. When the Korean Church comes in with a site plan,they would merely modify these elements to install an entrance. Provided VDOT is willing to grant such an entrance. The North Pointe files have a long history of VDOT not being willing to grant an entrance for the access easement in this location. Additionally, the VDOT reviewer verbally stated an entrance in this location does not meet corner clearances and would not be approved. We do not have an active site plan in for the Korean Church property, thus the subject of the approvability of such an entrance has not been our purview, nor VDOT's, nor the applicants. 2)The rear yards for lots 22-35 are current left within the temporary easement; however,the rear drainage lines on these lots shall be omitted. Can the rear yards remain in the temp construction easement void of drainage- lines? 3)The monument sign, the proposed private road, and the fire hydrant shall be added to my comments to be omitted from the private access easements. 4) What about the sewer line serving the development? Can this be permitted to stay within the private access easement? Below are snips from the site plan depicting the easement and proposed improvements. Also, I've CCed John Blair incase you want him to handle this. 1 4`I 'NOW ''.' ,pt,4;t . '.. .',''' >'-'" ti....„,......,,,,......f f ``F E*',c+''' '\ 11 • •• �'` y 3T; x 23 1 \ d• I ••1 24 r5 ':>.(.....,-.-- 25 A' fit NN''''* *, `�.\�+\ .� 1- \ \ __________d \ `� \ '` V `\ '•'•':,•-2 aT u / . ,t5 - .., / \,. ,. `., „y'. C / ti1a $04‘may. . ` / Y� . PROPOI IV AASD►1) ` IooAavar ma 32 s •„ . PRD RANI MTlb \ if tf F \,,/ RET 41141,40 NWL wale HOI wmr IV ANEXIITAR 11( FCI1f7NL' '\ 3j -..-2•• ��,\ ' • * \ �� \ 25'R--- • /r/ } • ,``""+w �' ,\ \ ! Epi' • • • a •.1 rvw \ • .N.....„,, `^`c • 1, A 14. f • • • N i 44 x 1 , f 3• f • Z(. 10Q'`IN, -....t ` lm A • c 1 1ONS,INCLUDING RECENTLY NST RIJCTEO / GO / 1/ -.. 0 CONSTRUCTION AND SHALL NO1 WY * J NAGE,MID ROAD CONNCCTFONS.AND SHAM l REPANCIES. '".64`I . �/ 4:,. ..,40" •. i 4ALL at NIGHER THAN 178. - a NGFRE APPARATUS WEIDHIkGBIs,000LBS. STOP SIGN—,1 V/ •• r ICS,ABOVE ANO BELOW cotD.-NG SENVICING .:-.7:-___L,- / r . i CVICC THE ACCACFNT PROPERTIES --� ,, .ETI ON OF T1-PRCJFCT 10 THE FUJ LST --- �Y ► r mead 2 *sat %ow . ' :5.. \ ...itiojoI,,, \OSP,A;\ • " \ •," • \ X. ' / #3. \ 1 "1*.1,,,... , 21 ,, , / . \ „." IS \ i X lk II 40 Jrir v „..............\\ iiiktitN Poe*X*1.6 4*...'''''%...'N''*".' . %.4. V/ '5--''-- Nib 'till .4 444.. .. \4 \ (''''' , ` --__— -+� Christopher P.Perez Senior Planner • • a 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From: Christopher Perez Sent:Thursday, April 12, 2018 8:15 AM To: 'aenglish@woodsrogers.com' <aenglish@woodsrogers.com> Cc: 'Scott Collins'<scott@collins-engineering.com>; Greg Kamptner<GKamptne@albemarle.org> Subject: RE: SDP201800007-North Pointe Northwest Residential Area—Initial Site Plan Mr. English, RE: SDP201800007-North Pointe Northwest Residential Area—Initial Site Plan Thank you for your letter of opposition and defense of the access easements on behalf of your client, Incheon Holdings, LLC.I am CCing the applicant's engineer to this letter to make them aware of your client's position. I plan to take final action on this plan no later than Friday, April 20`n Christopher P.Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From: English,J. Alden <aenglish(a@woodsrogers.com> Sent: Wednesday,April 11, 2018 4:59 PM To: Christopher Perez<cperez@albemarle.org> Cc:Greg Kamptner<GKamptne@albemarle.org> Subject: North Pointe Northwest Residential Area Prelim Site Plan SDP No. 201800007 Mr. Perez, please find the attached letter sent on behalf of Incheon Holdings, LLC. J. Alden English Woods Rogers PLC I Celebrating 125 Years: 1893 -2018 123 East Main Street, 5th Floor I Charlottesville, VA 22902 P(434) 220-5680 I F (434) 220-5687 aenglishAwoodsrogers.com A member of Interlaw, an International Association of Independent Law Firms 4 Christopher Perez From: Christopher Perez Sent: Wednesday,April 11, 2018 11:48 AM To: 'Scott Collins' Subject: SDP201800007 North Pointe Northwest Scott, RE: SDP201800007 North Pointe Northwest VDOT just sent me an email requesting to add another comment to the initial site plan. It deals with your firm's licensure: "Upon attempting to verify required licensure it seems that the firm Collins Engineering, Inc. is not registered appropriately with the APELSCIDLA Board. The plans will not be approved until this is resolved " I wanted to make you aware asap. Christopher P.Perez I Senior Planner Department of Community Development'County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 1 rII 111%- WOODS ROGERS! ATTORNEYS AT LAW J.ALDEN ENGLISH,ESQ. (434)220-5680 AENGLISH@WOODSROGERS.COM April 11, 2018 VIA EMAIL AND U.S. MAIL Christopher Perez, Senior Planner County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 cperez@albemarle.org Re: North Pointe Northwest Residential Area Prelim Site Plan SDP No. 201800007 (the "Plan") Dear Mr. Perez: This firm represents Incheon Holdings, LLC ("Incheon"), which is the owner of TMP 32-22K1 shown on the Plan (the "Incheon Property"). Incheon objects to the Plan and asks that it not be approved as currently submitted. The Plan includes the construction of obstructions and encroachments to the access and construction easements serving the Incheon Property, which are of record in DB 1663, PG 648. Such obstructions and encroachments include, but may not be limited to, the median strip and other improvements associated with Lewis and Clark Drive, a monument sign, building sites 22-35, a sanitary sewer pipe, a storm water pipe, and a retaining wall. Incheon is willing to work with the County and potentially the applicant to address issues in the Plan, but Incheon must object to the Plan as currently submitted because it adversely impacts the above-referenced easements. Please do not hesitate to contact me or to have the County Attorney's Office contact me about this matter. Sincerely, WOODS ROGERS P C J. Alden ngll.s 123 East Main Street,5th Floor P.a Box 2496 Charlottesville,Virginia 22902 P(434)220-5685•F(434)220-5687 www. woodsrogers . com Charlottesville•Lynchburg•Richmond•Roanoke (2304586-1, 113982-00001-03) ,%r/ stool cc: Incheon Holdings, LLC (via email only) Greg Kamptner, County Attorney (via email only) 2 {2304586-1, 113982-00001-03} Christopher Perez From: Christopher Perez Sent: Wednesday, April 11, 2018 10:52 AM To: 'Scott Collins' Subject: RE: North Pointe - Northern Residential development Alternate Layout Attachments: SRC Comments for CD1_SDP2018-7 North Pointe -Initial Site Plan 4-11-18.pdf Scott, SDP2018-7 North Pointe—Northwestern Residential Area- Initial Site Development Plan On this occasion Rachel's written guidance stands about not needing a variation for the items we discussed. I have completed my review on the proposal, Engineering has modified their comments, and I have attached them all in the SRC bundle. There are some large items that need to be corrected that may change your layout— please review the comments. I need to take an action on this plan by 4-20-18, let me know if you have any questions about the comments by next Wednesday. If you would like to request a deferral and resubmit or if you prefer a conditional approval. Thanks for your patience. Christopher P.Perez I Senior Planner Department of Community Development(County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From:Scott Collins<scott@collins-engineering.com> Sent: Friday,April 06, 2018 3:55 PM To:Christopher Perez<cperez@albemarle.org> Subject: FW: North Pointe- Northern Residential development Alternate Layout From:Scott Collins Sent:Tuesday,January 30, 2018 10:04 AM To: Rachel Falkenstein<rfalkenstein@albemarle.org> Subject: FW: North Pointe- Northern Residential development Alternate Layout Rachel- Just checking in to make sure you received this exhibit. Have you had a chance to talk with zoning about it. Do you think we can make this revision with a variation? Thx. Scott From:Scott Collins Sent:Tuesday,January 23, 2018 8:27 AM To: Rachel Falkenstein<rfalkenstein@albemarle.org> Subject: North Pointe- Northern Residential development Alternate Layout 1 Rachel- Thank you for taking the time to discuss this alternate layout for North Pointe Northeast Residential development with me last week. Attached is a pdf of the proposed alternate design that we would like to move forward with, and apply for a variation. The benefits of this layout are as followed: 1. It responds better to the entrance corridor, having the fronts of the units face the corridor. 2. It creates the ability to integrate pocket parks and open space into the design 3. It allows us to eliminate many of the onsite retaining walls within the development. 4. It works better with the existing site topography and reduces the amount of earth moving by about 100,000 CY. 5. It still preserves all the existing open spaces, greenways, and conservation areas, and allows for additional open spaces within the development and around the project. Let me know if you need anything else to preliminary discuss the ability to move forward with this design as a variation. Thank you! Scott 2 Christopher Perez From: Christopher Perez Sent: Wednesday,April 11, 2018 11:10 AM To: 'Scott Collins' Subject: RE: North Pointe - Northern Residential development Alternate Layout Attachments: TJSWCD Soil Report.pdf Scott, SDP2018-7 North Pointe—Northwestern Residential Area-Initial Site Development Plan Additionally, attached is the soil report. Christopher P.Perez I Senior Planner Department of Community Development County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From:Christopher Perez Sent:Wednesday,April 11,2018 10:52 AM To: 'Scott Collins'<scott@collins-engineering.com> Subject: RE: North Pointe- Northern Residential development Alternate Layout Scott, SDP2018-7 North Pointe—Northwestern Residential Area -Initial Site Development Plan On this occasion Rachel's written guidance stands about not needing a variation for the items we discussed. I have completed my review on the proposal, Engineering has modified their comments, and I have attached them all in the SRC bundle. There are some large items that need to be corrected that may change your layout— please review the comments. I need to take an action on this plan by 4-20-18, let me know if you have any questions about the comments by next Wednesday. If you would like to request a deferral and resubmit or if you prefer a conditional approval. Thanks for your patience. Christopher P.Perez I Senior Planner Department of Community Development'County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From:Scott Collins<scott@collins-engineering.com> Sent: Friday,April 06, 2018 3:55 PM To:Christopher Perez<cperezcaalbemarle.org> Subject: FW: North Pointe-Northern Residential development Alternate Layout 1 1,410 *IS From:Scott Collins Sent:Tuesday,January 30, 2018 10:04 AM To: Rachel Falkenstein<rfalkenstein@albemarle.org> Subject: FW: North Pointe- Northern Residential development Alternate Layout Rachel- Just checking in to make sure you received this exhibit. Have you had a chance to talk with zoning about it. Do you think we can make this revision with a variation? Thx. Scott From:Scott Collins Sent:Tuesday,January 23,2018 8:27 AM To: Rachel Falkenstein<rfalkenstein@albemarle.org> Subject: North Pointe- Northern Residential development Alternate Layout Rachel- Thank you for taking the time to discuss this alternate layout for North Pointe Northeast Residential development with me last week. Attached is a pdf of the proposed alternate design that we would like to move forward with, and apply for a variation. The benefits of this layout are as followed: 1. It responds better to the entrance corridor, having the fronts of the units face the corridor. 2. It creates the ability to integrate pocket parks and open space into the design 3. It allows us to eliminate many of the onsite retaining walls within the development. 4. It works better with the existing site topography and reduces the amount of earth moving by about 100,000 CY. 5. It still preserves all the existing open spaces, greenways, and conservation areas, and allows for additional open spaces within the development and around the project. Let me know if you need anything else to preliminary discuss the ability to move forward with this design as a variation. Thank you! Scott 2 Now Christopher Perez From: Christopher Perez Sent: Wednesday,April 04, 2018 2:50 PM To: 'Scott Collins' Subject: SDP2018-7 North Pointe— Northwestern Residential Area -Initial Site Development Plan Attachments: CD1 SDP2018-7 North Pointe—Northwestern Residential Area -Initial Site Development Plan.pdf Scott, SDP2018-7 North Pointe—Northwestern Residential Area-Initial Site Development Plan Attached are the comments from all SRC reviewers except Planning and ARB. I will not have Planning comments for you till next week,most likely the 12`". Regardless, I will still attend SRC tomorrow. Christopher P.Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 9►� I I Fro --- orvim 1 es COLLINS CNG{ J E E P I C. 200'bARRETT ST,SUITE K CHARLOTTESVILLE VA 22902 434.293.3719 PH 434.293.2813 FX www.collins-engineering.com March 6,2017 County of Albemarle-Department of Community Development 401 McIntire Road Charlottesville,VA 22902 RE: North Pointe SDP2016-61 -Request for Substitution of Required Recreational Amenities Dear Rachel Falkenstein and Sarah Baldwin: Please consider this request to allow substitution of the recreation facilities specified in section 18- 4.16 of the Zoning Ordinance. Per the approved rezoning plan,the North Pointe density on this property is 184 townhouse units for the Northern residential development area of North Pointe. The required amenities,as listed below,includes(4)tot lots and(1) full basketball court. The rezoning plan for the entire North Pointe development did not contemplate any active recreational areas or tot lot areas within this section of the overall project. With the close proximity of these townhouse units to the proposed elementary school property,the active recreational elements can be accommodated for this townhouse development with the playgrounds and fields within the elementary school property. In addition,this section of the North Pointe Development is platting and dedicating approximately 16.23 acres of floodplain,Greenway,and trail area to Albemarle County as a recreational area for the benefit of the overall development and Albemarle County. Access easements to this area will also be platted,allowing public access to the Greenway and recreational area within this development. Required Amenities The following summarizes the required amenities per the ordinance: Required Recreation area: 200 s.f.x 184 units=36,800 s.f.or 0.85 ac Four(4)tot lots required,each to include: • 1 swing with 4 seats • 1 buckabout or whirl • 1 slide • 2 benches • 2 climbers (1) Full Basketball Court: 1 court/100 units x 184 units= 1 full or 2 half courts required Proposed Amenities:Land dedication to Albemarle County Greenway, Floodplain area,and trail area dedicated to Albemarle County along with access easements to this property through the townhouse development TOTAL AREA PROVIDED: 16.23 acres Please consider this land dedication and proximity to the proposed elementary school site as a substitution for the required recreational amenities per the Albemarle County zoning regulations. The Greenway,floodplain,and trail area will be a public amenity to everyone within the development and also available to the residents of Albemarle County. In addition,the homeowners will have pedestrian access to the proposed Elementary school for active recreation. Thank you for your consideration of this request. Sincerely, Scott Collins, P.E. "two �✓ PROJECT: SDP201800007—North Pointe—Initial Site Plan MAGISTERIAL DISTRICT: Rivanna TAX MAP/PARCELS: 032000000022K0 LOCATION: Vacant land on Route 29 at the intersection of Lewis and Clark Drive [Route 1571] and Seminole Trail [Route 29]. PROPOSAL: To construct 184 sin le family attached(SFA)units on 39.99 acres. ZONING: ZMA2013-14 ZMA2013- and ZM 00-9 Planned Development Mixed Commercial (PDMC) -large-scale commercial\ses; residenti 1 y special use permit(15 units/acre). ENTRANCE CO' ' 3OR: Yes PROFFERS: Yes ' -}}-It( OVERLAY DISTRICT: Airport Impact, State Dam Break Inundation zone, Flood Hazard Overlay, Steep Slopes(Managed and Preserved), and Water Protection Ordinance(WPO)Buffers. COMPREHENSIVE PLAN: Urban Density Residential—residential(6.01 —34 units/acre); supporting uses such as religious institutions, schools, commercial, office and service uses. Privately Owned Open Space; Environmental Features—privately owned recreational amenities and open space; floodplain, steep slopes, wetlands, and other environmental features.