Loading...
HomeMy WebLinkAboutSDP201800007 Review Comments Initial Site Plan 2018-04-12Short Review Comments Report for: SDP201800007 SubApplication Type: NORTH POINTE - INITIAL Initial Site Plan Date Completed:04/16/2018 Reviewer:Christopher Perez CDD Planning Review Status:Requested Changes Reviews Comments: Division: Date Completed:04/03/2018 Reviewer:Matthew Wentland CDD Engineering Review Status:Requested Changes Reviews Comments:1. A revised VSMP plan will need to be approved prior to final site plan approval. 2. Revised road plans will need to be approved prior to FSP approval. 3. All plans related to the Rt. 29 improvements will need to be approved prior to FSP approval. 4. The public road/ROW has been shifted about 20' SW of previously shown locations and improvements are shown on an adjacent parcel. Please provide an easement and verify that the connection to the rest of North Pointe is still viable. 5. Provide a turnaround at the end of Girard Lane that does not rely on the parking spaces being unoccupied. 6. A revised CLOMR showing the change in the floodplain will be required before FSP/VSMP approval. 7. Provide written verification from all easement holders that improvements and grading located within said easements are acceptable. Division: Date Completed:03/30/2018 Reviewer:Adam Moore VDOT Review Status:Requested Changes Reviews Comments: Division: Date Completed:03/18/2018 Reviewer:Shawn Maddox Fire Rescue Review Status:Requested Changes Reviews Comments:1. If building hieghts are to exceed 30' then aerial apparatus access must be provided. See code sections below for access requirements. 2. A turnaround must be provided at the end of Girard Lane. 3. Streets shall be marked no parking in areas that would not allow for 20' of clear unobstructed travel width with on street parking. 4. Fire flow test results will be required prior to final acceptance. Code reference: D105.1 Where required. Where the vertical distance between the grade plane and the highest roof surface exceeds 30 feet (9144 mm), approved aerial fire apparatus access roads shall be provided. For purposes of this section, the highest roof surface shall be determined by measurement to the eave of a pitched roof, the intersection of the roof to the exterior wall, or the top of parapet walls, whichever is greater. D105.2 Width. Aerial fire apparatus access roads shall have a minimum unobstructed width of 26 feet (7925 mm), exclusive of shoulders, in the immediate vicinity of the building or portion thereof. D105.3 Proximity to building. At least one of the required access routes meeting this condition shall be located within a minimum of 15 feet (4572 mm) and a maximum of 30 feet (9144 mm) from the building, and shall be positioned parallel to one entire side of the building. The side of the building on which the aerial fire apparatus access road is positioned shall be approved by the fire code official. D105.4 Obstructions. Overhead utility and power lines shall not be located over the aerial fire apparatus access road or between the aerial fire apparatus road and the building. Other obstructions shall be permitted to be placed with the approval of the fire code official. Division: Page:1 of 2 County of Albemarle Printed On:July 13, 2018 of shoulders, in the immediate vicinity of the building or portion thereof. D105.3 Proximity to building. At least one of the required access routes meeting this condition shall be located within a minimum of 15 feet (4572 mm) and a maximum of 30 feet (9144 mm) from the building, and shall be positioned parallel to one entire side of the building. The side of the building on which the aerial fire apparatus access road is positioned shall be approved by the fire code official. D105.4 Obstructions. Overhead utility and power lines shall not be located over the aerial fire apparatus access road or between the aerial fire apparatus road and the building. Other obstructions shall be permitted to be placed with the approval of the fire code official. Date Completed:03/15/2018 Reviewer:Alexander Morrison ACSA Review Status:See Recommendations Reviews Comments: Division: Date Completed:03/13/2018 Reviewer:Christopher Perez CDD E911 Review Status:No Objection Reviews Comments:No objection per site plan dated 2/20/18 Division: Date Completed:03/19/2018 Reviewer:Michael Dellinger CDD Inspections Review Status:No Objection Reviews Comments:No objection Division: Date Completed:04/05/2018 Reviewer:Margaret Maliszewski CDD ARB Review Status:See Recommendations Reviews Comments:See ARB action letter in ARB-2018-30 Division: Date Completed:04/12/2018 Reviewer:Adam Moore VDOT Review Status:Requested Changes Reviews Comments: Division: Page:2 of 2 County of Albemarle Printed On:July 13, 2018 11144 c* ALfj�t '`�•--ldl'IIIU COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 (434)296-5832 April 11,2018 Scott Collins 200 Garrett Street, Suite K Charlottesville VA 22902 RE: SDP2018-7 North Pointe—Northwestern Residential Area-Initial Site Pl. Mr. Collins: The Site Review Committee has reviewed the development prop s:• referenced above. Initial comments for the following divisions of the Department of Commu.• Development and other agencies, as applicable,are attached: Albemarle County Planning Services Albemarle County Engineering Services Virginia Department of Transportation Albemarle County Service Authority Albemarle County Information Serv. es(E911) Albemarle County Department of.'ire Rescue Albemarle County Building In •ections Comments reflect informatio •vailable at the time the development proposal was reviewed,and should not be considered final. H. - ever,the Site Review Committee(SRC)has attempted to identify all issues that will be required to b; resolved prior to final site plan approval. The lead reviewer will either approve with conditions or den, the initial site plan by April 20th. Please contact m- •t your earliest convenience if you have questions or require additional information. Sincerely, 147_, Senior Planner i County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville,VA,22902 434-296-5832 Memorandum To: Scott Collins(scoff@collins-engineering.com) From: Christopher Perez, Senior Planner Division: Planning Date: April 11,2018 Subject: SDP2018-7 North Pointe—Northwestern Residential Area- Initial Site Plan The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed(The following comments are those that have been identified at this time.Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference,which is to the Subdivision/Zoning Ordinances unless otherwise specified.] 1. [4.11.4, SP2002-35, SP2002-47,ZMA2000-91 Access Easement to TMP 32-22K1. Improvements are proposed within the existing access easements serving TMP 32-22K1. Retaining walls shall not be placed within the 50' Temporary Construction Easement,nor the 30' Private Access Easement serving TMP 32-22K1. These improvements impede the use of the easements and shall not be permitted. Revise. Additionally, stormwater pipes and drainage pipes/easements are proposed within the existing 30' and 50' easements. Prior to final site plan approval provide written documentation from the owner of TMP 32-22K1 that these improvements are permitted within the easements. 2. 132.7.9.7, 14-401]Double Frontage. Throughout the plan there are numerous lots which are proposed as double frontage lots.This type of lot layout is prohibited. As discussed at the site review meeting, the applicant plans to revise some of the private roads to alleys to avoid some of the double frontage issues. Where double frontage is unavoidable because of the design/layout, either provide 20' of common area between the lot and the second street or request an agent approved variation with required justification in 14-203.1(B). Staff is not compelled to support such a waiver without a 20' buffer planted with screening trees as provided for in Section 32.7.9.7. 3. [32.7.2.2, 14-410(H)] Sidewalks and Landscape Strips. Provide sidewalks and landscape strips on both sides of all private streets throughout the development,regardless of driveways. 4. [32.7.2.2, 14-410(H), 14-422(D)] Sidewalk and Landscape Strip Design. The planting strips shall be located between the curb and the sidewalk. 5. [32.7.2.2, 14-410(H)] Sidewalks and Landscape Strip. The necessary street improvements, sidewalks and landscape strips,are located outside of the private street right-of-way and instead are located on individual lots in proposed easements. If this design is to remain,all front setbacks shall be measured from the edge of these easements. Staff recommends these improvements be placed within the private right-of-ways. 11000 '44.096. [ZMA2013-14,ZMA2000-91 The road cross section from the rezoning specifies that Lewis and Clark Drive shall provide 5' wide bike lanes on each side for the duration of the roadway. Additionally, 5' meets VDOT's current standard. Revise. 7. [ZMA2013-14,ZMA2000-91 Provide a public access easement along the private street and sidewalks for Aldrich Lane,which will connect to the publicly dedicated path within the greenway dedication area. 8. [ZMA2013-14,ZMA2000-91 Proffer 5.3.1(c)(1). Phase III Road Improvements required to be approved and either build or bonded before final site plan approval. (c) Phase III Road Improvements. Prior to approval of a subdivision plat or site plan for any development of the Neighborhood Investments Property or any portion thereof, Owner shall obtain all associated permits and post all associated bonds required for the construction of the following road improvements (collectively, the "Phase III Road Improvements")to the extent any such road improvements have not already been completed: (1) Northernmost Entrance (opposite Lewis & Clark Drive) on U.S. Route 29: (i) U.S. Route 29 Southbound -construction of left turn lane with taper. (ii) Northwest Passage from U.S. Route 29 to the south property line of Tax Map 32,Parcel 22K as shown on the Application Plan. (iii) U.S. Route 29 Northbound — construction of a right hand turn lane,the geometries of which will be subject to VDOT approval. (iv) If the traffic signal to be constructed by others is in place prior to Owner commencing work on this Northernmost Entrance, and such traffic signal only includes three legs. Owner shall add the fourth leg to the signal, which shall include additional mast arms, signal heads and ancillary equipment necessary to support Northwest Passage's use of the intersection, as determined by VDOT. If such traffic signal is not in place and the vehicular traffic generated by the Project causes the VDOT signal warrants to be met,and VDOT requires that a traffic signal be installed as a condition of the entrance permit,Owner shall install such traffic signal. 9. [ZMA2013-14, ZMA2000-91 Proffer 5.3.3. 5.3.3 Prior to the approval of plans for improvements at any U.S. Route 29 intersection, Owner shall provide VDOT traffic signal network timing plans that VDOT finds acceptably address the impacts of the proposed traffic signals for peak traffic periods. 10. [ZMA2013-14,ZMA2000-91 Proffer 9.1. Prior to final site plan approval,demonstrate to the satisfaction of the County Engineer that stormwater basin 10(currently labeled as SWM Facility A) has enough room to be redesigned and enlarged to accommodate all stormwater from the future elementary school lot located on TMP 32-23. Depict,label, and dimension all easements necessary for this expansion on the facility,to also include access easements,temporary construction easements, and permanent SWM facility easements. Additionally,provide the slope for the SWM access road. This shall meet county design standards. 11. [ZMA2013-14,ZMA2000-91 Proffer 8.2. Affordable Housing. Label the 28 units that are to be affordable. 12. [SP2006-34] Condition#1. County and VDOT approval of the final lane configuration for the Northwest Passage over the stream crossing with the final road plans. 13. [SP2006-34] Condition#2. County and VDOT approval of final design plans and hydrologic/hydraulic computations for the stream crossing. 14. [SP2006-34 Condition#3&ZMA2013-14,ZMA2000-9 Proffer 4.1.] A revised CLOMR showing the change in the floodplain will be required prior to final site plan and VSMP approval. 15. [SP2006-34] Condition#9. All of the above noted landscaping shall be shown on the road plans submitted for the Northwest Passage prior to final site plan approval. The plans shall include complete planting schedule key to the plan. The plans are subject to approval of the Design Planner. 16. [SP2006-34] Condition#5. Provide a stream buffer mitigation plan for approval by the Natural Resources Manager in accordance with this condition. 17. [SP2006-34,SP2002-72] Conditions. All conditions of the SPs remain valid and shall be complied with prior to final site plan approval. 18. [ZMA2013-07 Application Plan] Provide written certification from a licensed surveyor or engineer confirming that the conservation line shown on the application plan for ZMA 2013-07 and the conservation line shown on this site plan are in the exact same location. 19. [ZMA2013-14,ZMA2000-91 To ensure the long-term implementation of the zoning for the North Pointe development,prior to final site plan approval provide written documentation from the owner of TMP 32-23,Violet Hill Associates C/O Great Eastern Management Co,which states that they are aware and agree to the following,which affect the use of their property. la. [ZMA2013-14,ZMA2000-9,SP2002-721 Unit Types. The North Pointe development is required to have a minimum of 205 multifamily units. The application plan lists the units in this section of North Pointe(Northwestern Residential)as multifamily units. Currently single-family attached townhomes on individual lots are proposed for this section. This modification in unit type is permitted; however, staff feels it pertinent to notify the other owner of this modification as they will be required to develop the minimum number of multifamily units on their property. Please provide written documentation from the owner of TMP 32-23,Violet Hill Associates C/O Great Eastern Management Co,that they are aware of this modification. lb. [ZMA2013-14,ZMA2000-9] Road Alignment. The alignment of Lewis and Clark Drive at the shared property line of TMP 32-22K and TMP 32-23 is shifting locations from what was depicted on the application plan. Provide written documentation from the adjacent property owner,Violet Hill Associates C/O Great Eastern Management Co,that documents they are in agreeance with the shift in alignment as proposed on the site plan under review. lc. [ZMA2013-14,ZMA2000-91 Amenities and Open Space. The open space and amenities required throughout the North Pointe development are to be accessible for use by all section of the development. Provide written documentation from the adjacent property owner,Violet Hill Associates C/O Great Eastern Management Co,that documents they understand this criteria. Each of the developments Covenants and Restrictions documents and plans shall make note of this. 20. [Comment] Road Alignment. The current alignment for Lewis and Clark Drive crosses onto a small portion of TMP 32-22P. Prior to final site plan approval a boundary line adjustment shall take place. 1604 21. [ZMA2013-14,ZMA2000-91 Revise the tracking of unit type throughout the plan. The proposed unit types are attached townhomes,not multifamily,nor other, specifically list them as"Attached Townhomes". 22. [4.12.16] Guest Spaces. Label all guest spaces on the plan. 23. [4.12.16] Parking Spaces. There is a typographical/math error for the parking provided. 409 is listed; however, it should be 414,which equals parking required. 24. [Comment] Throughout the plan label and provide acreages of all open space, conservation, greenway, and buffer areas. 25. [Comment] Because each driveway varies in size please dimension the driveways for each lot. Please depict, label, and dimension the garages for each lot. 26. [ZMA2013-14,ZMA2000-9] Setbacks. Revise the setbacks to match the setbacks for the unit type "Attached Townhomes": Front min 8' and"max 30', side 6',rear minimum 10' and max none. Garage doorway 18'. 27. [Comment] Why is"Building 6"listed as a building type B,when building 1 and 13, located adjacent to it are type A?Ensure all the building types are appropriately labeled throughout the plan. 28. [32.6.2(d)] Water and sewer facilities. Provide profiles and cross sections of all water and sewer lines including clearance where lines cross. 29. [32.6.2(d)] Water and sewer facilities. Provide the station on the plan to conform to the station shown on the profile and indicate the top and invert elevation of each structure. 30. [32.6.2(d)] Water and sewer facilities. Provide all sewer appurtenances by type and number. 31. [32.6.2(e)] Public facilities and utilities. All water and sewer facilities to be dedicated to public use and the easements for those facilities and shall be identified by a statement that the facilities are to be dedicated to the Albemarle County Service Authority. 32. [32.5.2(j)] Building 26 does not appear to be served by sewer,as a line does not run along its frontage. Please verify. 33. [32.5.2(n)&4.16] Recreational requirements of section 4.16 are applicable to Planned Development zoning districts. Demonstrate how the recreational regulations will be met and if substitutions will be provided with this portion of the development. 34. [32.6.2(d)] Drainage easements outside of the public right-of-way shall not be dedicated to public use, unless VDOT has agreed to accept and maintain these easements. 35. [32.6.2(j)] Landscape plan.A landscape plan that complies with section 32.7.9 is required with the final site plan. Additionally, landscaping shall also be in conformity with the conditions of approval of SP2006-34,ZMA2013-14. 36. 132.7.9.4(b)] Existing trees may be preserved in lieu of planting new plant materials in order to satisfy the landscaping and screening requirements of section 32.7.9, subject to the agent's approval. If you intend to use existing trees to satisfy any of the landscape plan requirements,please include the following: 1. Areas and other features shown on landscape plan.The landscape plan shall show the trees to be 1110 4 ' preserved,the limits of clearing,the location and type of protective fencing,grade changes requiring tree wells or walls, and trenching or tunneling proposed beyond the limits of clearing. 2. Conservation checklist.The applicant shall sign a conservation checklist approved by the agent to ensure that the specified trees will be protected during construction. Except as otherwise expressly approved by the agent in a particular case,the checklist shall conform to the specifications in the Virginia Erosion and Sediment Control Handbook,pages II1-393 through III-413, and as hereafter amended. 37. [Comment] The final site plan shall not be approved until! all SRC reviewers have approved the plan.Their comments attached. Please contact Christopher Perez in the Planning Division by using cperez@albemarle.org or 434-296-5832 ext. 3443 for further information. Review Comments r r SDP201800007 Vial Site Plan - Project Name: NORTH POlf jTE - INITIAL Date Completed: Tuesday. April 03. 2018 Department/Division/Agency: Review Status: Reviewer Matthew Wentland j COD Engineering Requested Changes 1-A revised VSMP plan will need to be approved prior to final site plan approval 2. Revised road plans will need to be approved prior to FSP approval 3. All plans related to the Rt 29 improvements will need to be approved prior to FSP approval. 4. The public road,ROW has been shifted about 20'SW of previously shown locations and improvements are shown on an adjacent parcel Please provide an easement and verify that the connection to the rest of North Pointe is still viable 5 Provide a turnaround at the end of Girard Lane that does not rely on the parking spaces being unoccupied 6 A revised CLOMR showing the change in the floodplain will be required before FSP/VSMP approval 7. Providewritten verification from all easement holders that improvements and grading located within said easements are acceptable Page: '.1 County of Albemarle Printed On: 104/1112018 Review Comment for SDP201800007 Initial Site Plan Project Name: NORTH POINTE - INITIAL Date Completed: Sunday, March 18. 2018 DepartmentDivision?Agency: Review Status: Reviewer: Shawn Maddox -j Fire Rescue Requested Changes 1. If building hieghts are to exceed 30 then aerial apparatus access must be provided See code sections below for access requirements 2.Aturnaround must be provided at the end of Girard Lane 3. Streets shall be marked no parking in areas that would not allow for 20 of clear unobstructed travel width with on street parking 4- Fire flow test results will be required prior to final acceptance Code reference- D105.1 Where required Where the vertical distance between the grade plane and the highest roof surface exceeds 30 feet (9144 mm), approved aerial fire apparatus access roads shall be provided For purposes of this section the highest roof surface shall be determined by measurement to the eave of a pitched roof the intersection of the roof to the exterior wall or the top of parapet walls whichever is greater. D105 2 Width Aerial fire apparatus access roads shall have a minimum unobstructed width of 26 feet ((7925 mm). exclusive }of shoulders in the immediate vicinity of the building or portion thereof 0105.3 Proximity to building At least one of the required access routes meeting this condition shall be located within a minimum of 15 feet (4572 mm) and a maximum of 30 feet (9144 mm{from the building. and shall be positioned parallel to one entire side of the building The side of the building on which the aerial fire apparatus access road is positioned shall be approved by the fire code official 0105.4 Obstructions Overhead utility and power lines shall not be located over the aerial fire apparatus access road or between the aerial fire apparatus road and the building Other obstructions shall be permitted to be placed with the approval of the fire code official Page: 1 County of Albemarle Frinted On: 104/0412018 • Imre OFA sl_ ..� 1f1;11,0107.. COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone (434)296-5832 Fax(434) 972-4126 April 5,2018 Scott Collins c/o Collins Engineering 200 Garrett Street, Suite K Charlottesville, Va 22902 RE: ARB-2018-30: North Pointe Initial Plan Dear Mr.Collins, At its meeting on Monday,April 2, 2018,the Albemarle County Architectural Review Board unanimously voted to forward the following recommendations on the above-noted Initial Site Development Plan to the agent for the Site Review Committee: • Regarding requirements to satisfy the design guidelines as per§ 18-30.6.4c(2),(3)and(5)and recommended conditions of initial plan approval: o Priorlto Initial Plan approval, the following items shall be resolved to the satisfaction of the ARB: None. • Regarding recommendations on the plan as it relates to the guidelines: None. • Regarding conditions to be satisfied prior to issuance of a grading permit: 1. Revise the plan to clearly show existing wooded area to remain and tree protection fencing throughout the site plan. • Regarding the final site plan submittal: 1. Submit architectural designs for review with the final site plan. The plans and elevations shall address the following: a. A maximum of two adjacent facades shall be co-planar. b. Adjacent townhouses shall not have the same siding color. c. Two townhouses having full brick facades shall not be adjacent. d. Show how the side and rear townhouse elevations will have an appropriate appearance for the EC. 2. Include sufficient architectural features and detailing on all building elevations facing the EC to achieve an appropriate appearance for the EC. 3. Provide architectural elevations for review. 4. Add to following note the site plan and the architectural plan:"Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated." 5. Include with the final site plan a landscape plan that addresses the requirement for the 40' landscape buffer along the EC frontage of the development. 6. Provide landscaping at the entrance to the development to establish an appropriate appearance for the EC. 7. Arrange utilities to allow for street trees consistently spaced 40' on center along interior roads. 8. Add the standard plant health note to the plan:"All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited Shrubs and trees shall be pruned minimally and only to support the overall health of the plant." lisof Now 9. Revise the plan to clearly show existing wooded area to remain and tree protection fencing throughout the site plan. You may submit your application for continued ARB review at your earliest convenience.Application forms, checklists and schedules are available on-line at www.albemarle.org/ARB.Please be certain that your ARB submittal addresses the above-noted issues. If you have any questions concerning any of the above,please feel free to contact me. Sincerely, 17/4dx:crtitOf ��t Margaret Maliszewski Chief of Planning/Resource Management cc: Neighborhood Investments—NP, LLC 810 Catalpa Ct Charlottesville VA 22903 File *me Nome \iv If L, �V `!*'4-4 � J, p e COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper,Virginia 22701 Stephen C. Brich, P.E. Commissioner March 30,2018 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Christopher Perez Re: North Pointe Northwest— Initial Site Plan SDP-2018-00007 Review#1 Dear Mr. Perez: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Collins Engineering, dated 20 February 2018, and offers the following comments: 1. The Route 29 Improvements Plan (SUB201600196) for the entrance of this site, which must be approved in conjunction with this plan, has not been approved. 2. The minimum horizontal radius in the GS-7 design standards is based on a super- elevation of the street. Is that the intent and, if so, is there enough distance to return to normal elevation before the Route 29 entrance? If the street is not super-elevated, the minimum radius is 335' per the GS-SSAR. 3. Sheet 6 has a callout for GR-2 flush with face of curb along Lewis & Clark Drive. Are guardrails warranted here? Also note that the guardrail at the Route 29 entrance crosses the sidewalk. 4. Why is there a break in the median between Route 29 and Aldrich Lane? 5. A temporary turnaround is required at the end of Lewis &Clark Drive. See Appendix F of the Road Design Manual for turnaround design standards, or acceptance will end at the Aldrich Terrace intersection. 6. Where transit buses will be present, the minimum bike lane width is 5 feet. 7. There is a curb inlet in the bus pullout that needs to be shifted to the curb. If further information is desired,please contact Justin Deel at 434-422-9894. VirginiaDOT.org WE KEEP VIRGINIA MOVING March 30, 2018 Christopher Perez Page 2 A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, Itutt •hifiRt/ Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING Christopher Perez From: Richard Nelson <rnelson@serviceauthority.org> Sent: Thursday, March 15, 2018 4:00 PM To: Christopher Perez Cc: Alex Morrison Subject: SDP201800007 - North Pointe - Initial Chris, I recommend approval for SDP201800007 - North Pointe—Initial. Three (3) copies of the site plan will need to be submitted to ACSA for water and sewer construction review, as well as RWSA sewer capacity approval, prior to final site plan approval. Thanks, Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434) 977-4511 • 1 Review Comment- for SDP201800007 Initial Site Plan .L Project Name: NORTH POINTE - INITIAL Date Completed:[Tuesday March 13. 2018 DepartmentDMsion/Agency: Review Status: Elise Kiewra H CDD E911 LJ No Objection vi Reviewer.� � No objection per site plan dated 2120118 • Page: 1 County of Albemarle Printed On: 104104/2018 Review Comments '')r SDP201800007 tial Site Plan -1 Project Name: NORTH POINTE - INITIAL Date Completed:[Monday. March 19. 2018 i DepartmentDivision+Agency: Review Status: Reviewer. Michael Dellinger - CDD Inspections H No Objection No objection Page: 11 County of Albemarle Printed On: 104?04/2018