HomeMy WebLinkAboutSUB201800096 Review Comments Appeal to BOS 2018-07-17 (5)'Al County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA, 22902 Phone 434-296-5832 Fax 434-972-4126 Memorandum To: Scott Collins From: Christopher P. Perez, Senior Planner Division: Planning Date: July 17, 2018 Subject: SUB201800096 Estes Park - Lot 69 - Final Subdivision Plat The County of Albemarle Planning Division will approve the plat referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] 1. [ZMA2012-8] Density. This development is only permitted 68 lots. It appears a numbering error occurred in the Phase II plat, in which lot number 56 was never platted. Based on how the proffers are written, please revise the lot number throughout the plat to state: "Lot 56, which is the 68rh lot permitted for the development". ACSA — Alex Morrison I wanted to follow-up on a few items for Estes Park so we can get dedication wrapped up and the 1 year warranty clock started. We also received SUB201800096 (for the new lot 69) for review, which will require some components of dedication before we can approve. Specifically the easements need to be recorded and referenced on the subdivision plat before we can approve. The original plats recorded require no revisions to easements and the deeds have been approved. I have attached the approved deeds for reference. Please record these deeds and provide the deed book and page number to me. Scott will need to reference the deed book and page on the subdivision plat (and show the easements). Part of the sewer easement is located on proposed lot 69. I will send you the letter of dedication for Phase 1 & 2 shortly which you will need to complete, sign, notarize and return to our office. Once both of these items are complete for dedication I will be able to dedicate the infrastructure. We will hold approval on the subdivision plat until the easements are recorded and referenced. If that occurs while we are still working on the letters of dedication we will go ahead and issue approval for lot 69 but will not approve a building permit until dedication is complete. Please confirm receipt of this e-mail and let me know if you have any questions. Fire and Rescue — Shawn Maddox No objection Engineering —Matthew Wentland No objection Building Inspections — Michael Dellinger No objection VDOT — Adam Moore No objection E911 - Elise Kiewra No objection Staff has provided references to provisions of Chapter 14 of the Code of the County of Albemarle. The Code is kept up to date by the County Attorney's office. The Code may found on the County Attorney's website which may be found under "Departments and Services" at Albemarle.org. In accord with the provisions of Section 14-229(B) of Chapter 14 of the Code if the developer fails to submit a revised final plat to address all of the requirements within six (6) months after the date of this letter the application shall be deemed to have been voluntarily withdrawn by the developer. If you have any questions about these conditions or the submittal requirements please feel free to contact me at extension 3443, or at cperez@albemarle.org. Sincerely, Christopher P. Perez Senior Planner