Loading...
HomeMy WebLinkAboutWPO201600046 Inspection 2018-06-15COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 229024596 Phone (434) 296-5832 Fax (434) 972-4126 VSMPIVESCP PERMIT SITE INSPECTION REPORT Project Name: Hollymead Town Center Bojangles ProjectfWPO Number, WP02016-00046 Project Address: 3370 Seminole Trail DEQ Permit Number (if VAR101988 a licable): Project Operator: Justin Shimp Operator Telephone #: 434-227-5140 Project Contact: Justin Shimp Contact Telephone M 434-227-5140 Contact E-Mail: iusin@shimp-enaineering.com Qualified Personnel (QP): Inspector: Jonney Otto Weather (WetlDry/Rain): Disturbed Acreage: 1.95 Inspection Date & Time: . Single -Family: ❑ Yes 2rNo Stage of Construction: LJ Pre -Construction Meeting LJ Initial Clearing & Grading Rough Grading ❑ Building Construction ❑ Final Grading ❑ Construction of SWM Facilities Final Stabilization ❑ Notice of Termination ❑ Other: Re -Inspection: ❑ Yes ❑No COVERAGE & POSTING REQUIREMENTS Yes No N/A Reviewed during re -inspection? []Yes ❑No CommentsMascripbon 1 Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A) (9VAC25-870-310)(Alb. Co. Code §17-300, 17-302) 2 A copy of the notice of coverage letter is posted conspicuously near the main entrance of the construction activity? (CGP Part II.C) Notice of the location of the SWPPP is posted near the site's entrance, if 3 applicable, and information for public access is provided? (9VAC25-870- 54.G)(CGP Part II D.2 & 3) SWPPP AVAILABILITY AND CONTENTS Yes No WA Reviewed during re -inspection? []yes ❑No CommentsMasc►fpdon 4 The SWPPP is on -site or made available during the inspection? (CGP Part II D.1 & 2)(9VAC25-870-54.G) f 5 The SWPPP contains a signed copy of the registration statement? (CGP Part 11 A.1.a) 6 The SWPPP includes, upon receipt, a copy of the notice of coverage letter and the CGP? (CGP Part 11 A.1.b & c) Page 1 of 7 The SWPPP includes a narrative description of the nature of the 7 construction activity, including the function of the project? (CGP Part 11 A.1.d) The SWPPP includes a legible site plan identifying all appropriate 8 measures and that includes the locations of support activities and the onsite rain gauge, when applicable? (CGP Part II A.i.e(1-7)) 9 The SWPPP contains the name, phone number and qualifications of "Qualified Personnel" conducting inspections? (CGP Part II A.6) 10 The SWPPP contains an approved erosion and sediment control plan? (9VAC25-870-54.B)(CGP Part II.A.2) The SWPPP contains an approved stormwater management plan or an 11 existing construction site has a stormwater management plan that ensures compliance with the water quality and quantity requirements? (9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria ILB ❑ II.0 ❑ 12 The SWPPP contains an adequate pollution prevention plan? (9VAC25- 870-54.D)(CGP Part II.A.4) The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of 13 concern, exceptional waters and the additional controls measures applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b)) 14 Delegation of Authority is provided and signed in accordance with Part III K? (CGP Part II A.7) 15 The SWPPP is signed and dated in accordance with Part III K? (CGP Pa Il A.8) SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES Yes No N/A Reviewed during inspection? ❑Yes []No Comments/DescrrpOon Is the SWPPP being amended whenever there is a change in the design, 16 onstruction, operation, or maintenance that has a significant effect on the iscC'h) rge of pollutants to surface waters? (CGP Part 11 B(1))(9VAC25-870- eel Has the SWPPP been amended if inspections or investigations by the 17 personnel, or by local, state or federal officials find that �x`lerator'squalified sting control measures are ineffective in minimizing pollutants in el ischarges? (CGP Part II B(2))(9VAC25-870-54.G) 18 Contractor(s) that will implement and maintain each control measure are dentifred? (CGP Part II B(3))(9VAC25-870-54.G) Have there been updates to the SWPPP when any modifications to its implementation have occurred, including a record of dates when major 19 3rading activities occur, construction activities temporarily or permanently r" ase on a portion of the site or stabilization measures are initiated? (CGP Part 11 B.4(a))(9VAC25-870-54.G) 20 Is there documentation in the SWPPP of replaced or modified controls? (CGP Part II B.4(b))(9VAC25-870-54.G) 21 Is the SWPPP updated to indicate areas that have reached final tabilization? (CGP Part II B.4(c))(9VAC25-870-54.G) Is the SWPPP updated to indicate properties that are no longer under the 22 egal control of the operator and the dates on which the operator no longer had legal control over each property? (CGP Part II B.4(d))(9VAC25-870- 4.G) Does the SWPPP identify the date of any prohibited discharges, the 23 volume released, actions taken to minimize the impact of the release and measures taken to prevent the recurrence of any prohibited discharge? CGP Part II BA(e-f)) (9VAC25-870-54.G) Amendments, modifications, or updates to the SWPPP are signed in 24 accordance with Part III K? (CGP Part 11 B(5))(9VAC25-870-54.G) INSPECTIONS AND CORRECTIVE ACTIONS ryeN/A Reviewed during inspection? []Yes ❑No flN0 Comments✓Description Page 2 of 7 Inspections required by the SWPPP are conducted at the required 25 frequency, including a modified frequency for impaired water(s), approved TMDL(s), and exceptional waters when applicable? (CGP Part II F (2)) (CGP Part II A.5.b.3) 26 Inspection reports are completed and signed in accordance with CGP Part II F (3-4)? (CGP Part II F (3-4)) 27 Corrective actions are taken consistent with the requirements of the CGP? (CGP Part 11 G(1-2)) ESC AND SWM PLAN IMPLEMENTATION Yes No WA Reviewed during inspection? Oles []No Comments vescrlptlon 28 Have stream buffers and steep slopes been protected as shown on the plan? Sequencing of the project is implemented in accordance with the 29 approved erosion and sediment control plan and stormwater managemen plans? (9VAC25-870-54.B and C) Have all denuded areas requiring temporary or permanent stabilization been stabilized, and have stabilization requirements for impaired waters, 30 approved TMDL(s), pollutants of concern and exceptional waters, when applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25 880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8)) (CGP 11 E(1-2)) Are soil stockpiles adequately stabilized with seeding and/or protected Dom' C) 39 with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part 11 A.2(c)) (9VAC25-870-54.13) A permanent vegetative cover has been established that is uniform, y)A �; nt cipy, Fc, 4> Six `r, 32 mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3) (CGP Part 11 A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-54.13) Have sediment trapping facilities been constructed as the first step in land 33 disturbance activities? (9VAC 25-840-40.4) (CGP Part II A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-54.13) Have earthen structures been stabilized immediately after installation? 34 (9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP 11 E(1-2)) (9VAC25-870- 54. B) Are sediment traps and basins installed in accordance with MS-6 and the 35 approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.8) Are finished cut and fill slopes adequately stabilized to prevent or correct 36 excessive erosion? (9VAC 25-840-40.7) (CGP Part 11 A.2(c)) (CGP II E(1- 2)) (9VAC25-870-54.13) Is concentrated runoff down cut or fill slopes contained in an adequate 37 permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870,54.13) Is adequate drainage or other protection provided for water seeps? 38 (9VAC 25-840-40.9) (CGP Part II A.2(c)) (CGP 11 E(1-2)) (9VAC25-870- 54.6) Do all operational storm sewer inlets have adequate inlet protection? 39 (9VAC 25-840-40.10) (CGP Part 11 A.2(c)) (CGP Il E(1-2)) (9VAC25-870- 54.B) Are stormwater conveyance channels adequately stabilized with channel 40 lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part II A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-54.13) Is in -stream construction conducted using measures to minimize channel 41 damage? (9VAC 25-840-40.12) (CGP Part 11 A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-54. B) Are temporary stream crossings of non -erodible material installed where 42 applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B) 43 Is necessary restabilization of in -stream construction complete? (9VAC 25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.13) Page 3 of 7 Are utility trench operations conducted and stabilized in accordance with 44 MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B) Are soil and mud kept off paved or public roads to minimize the transport 45 of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B) Have all temporary control structures that are no longer needed been 46 removed and disturbed soil resulting from their removal permanently stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B) Are properties and waterways downstream from development adequately 47 protected from erosion, sediment and damage in accordance with the standards and criteria specified by 9VAC25-840,19(a-n)? (9VAC 25-840- 40.19(a-n)) 48 Permanent control measures included in the SWPPP are in place? (9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a)) POLLUTION PREVENTION PLAN IMPLEMENTATION yes No AfIAJ Reviewed during inspection? []Yes []No Comments✓Desctfpffon Practices are in place to prevent and respond to leaks, spills, and other releases including (i) procedures for expeditiously stopping, containing, 49 and cleaning up spills, leaks, and other releases; and (ii) procedures for reporting leaks, spills, and other releases in accordance with Part I I I G? (CGP Part II A.4.e(1))(9VAC25-870-56) Practices are in place to prevent the discharge of spilled and leaked fuels 50 and chemicals from vehicle fueling and maintenance activities? (CGP Part I I A.4.e(2))(9VAC25-870-56) Practices are in place to prevent the discharge of soaps, solvents, 59 detergents, and wash water from construction materials, including the clean-up of stucco, paint, form release oils, and curing compounds? (CGP Part 11 A.4.e(3))(9VAC25-870-56) Practices are in place to minimize the discharge of pollutants from vehicle 52 and equipment washing, wheel wash water, and other types of washing? (CGP Part II A.4.e(4))(9VAC25-870-56) 53 Concrete wash water is directed into a leak -proof container or leak -proof settling basin? (CGP Part 11 A.4.e(5))(9VAC25-870-56) Practices are in place to minimize the discharge of pollutants from 54 storage, handling, and disposal of construction products, materials, and wastes? (CGP Part 11 A.4.e(6))(9VAC25-870-56) Practices are in place to prevent the discharge of fuels, oils, and other 55 petroleum products, hazardous or toxic wastes, and sanitary wastes? (CGP Part 11 A.4.e(7)(9VAC25-870-56) Practices are in place to minimize any other discharge from the potential 56 pollutant -generating activities not addressed above, when applicable? (CGP Part II A.4.e(8))(9VAC25-870-56) hspector Signature: -✓ 4 Date: V / t �/l Y Page 4 of 7 COUNTY OF ALBEMARLE Department of Community Development VSMP/VESCP PERMIT SITE INSPECTION REPORT Project Name: 011 LV Project/WPO Number: PC _2Q 1 6 Doe, Y b Project Address: -5-3 i t �tr ` CUi J DEQ Permit Number (if applicable): VAR i b i G $g Project Operator: LALn, g Operator Telephone #: ect Contact: Contact Telephone #: tact E-Mail: rDlsturbed 2­1 Qualified Personnel (QP): ector: u�, r Weather (Wet/Dry/Rain): e Acreage. f , Inspection Date & Time: Single -Family: ❑ Yes 260 Stage of Construction: LJ ❑ Building Construction ❑ Notice of Termination Pre -Construction Meeting LJ Initial Clearing & Grading LJ L]0'final Grading ❑ Construction of SWM Facilities ❑ Other: Rough Grading ❑ Final Stabilization Re -Inspection: ❑ Yes 2rNo COVERAGE & POSTING REQUIREMENTS I Yes No N/A Reviewed during re -inspection? []Yes Goo Commenfs/Descdpdon I Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A) (9VAC25-870-310)(Alb. Co. Code §17-300, 17-302) 2 A copy of the notice of coverage letter is posted conspicuously near the main entrance of the construction activity? (CGP Part II.C) Notice of the location of the SWPPP is posted near the site's entrance, if 3 applicable, and information for public access is provided? (9VAC25-870- 54.G)(CGP Part II D.2 & 3) SWPPP AVAILABILITY AND CONTENTS Yes No N/A Reviewed during re -inspection? OYe4200 Commenta/Descrlpdon 4 The SWPPP is on -site or made available during the inspection? (CGP Part 1113.1 & 2)(9VAC25-870-54.G) 5 The SWPPP contains a signed copy of the registration statement. (CGP Part 11 AA.a) B The SWPPP includes, upon receipt, a copy of the notice of coverage / letter and the CGP? (CGP Part 11 A.1.b & c) The SWPPP includes a narrative description of the nature of the 7 construction activity, including the function of the project? (CGP Part II A.1.d) Page 1 of 7 The SWPPP includes a legible site plan identifying all appropriate 8 measures and that includes the locations of support activities and the onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7)) 9 The SWPPP contains the name, phone number and qualifications of "Qualified Personnel" conducting inspections? (CGP Part II A.6) 10 The SWPPP contains an approved erosion and sediment control plan? (9VAC25-670-54.B)(CGP Part II.A.2) The SWPPP contains an approved stormwater management plan or an 11 existing construction site has a stormwater management plan that ensures compliance with the water quality and quantity requirements? (9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 11.6 ❑ ILC ❑ 12 The SWPPP contains an adequate pollution prevention plan? (9VAC25- 870-54.D)(CGP Part II.A.4) The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of 13 concern, exceptional waters and the additional controls measures / applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b)) 14 Delegation of Authority is provided and signed in accordance with Part III K? (CGP Part it A.7) 15 The SWPPP is signed and dated in accordance with Part III K? (CGP Pa II A.8) SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES Yes No WA Reviewed during inspection? []Yes,Oflo Comments/0escriptlon Is the SWPPP being amended whenever there is a change in the design, 16 nstruction, operation, or maintenance that has a significant effect on the ischarge of pollutants to surface waters? (CGP Part II B(1))(9VAC25-870- l G) Has the SWPPP been amended if inspections or investigations by the 17 perator's qualified personnel, or by local, state or federal officials find that , xisting control measures are ineffective in minimizing pollutants in ischarges? (CGP Part II B(2))(9VAC25-870-54.G) 18 ontractor(s) that will implement and maintain each control measure are dentified? (CGP Part II B(3))(9VAC25-870-54.G) Have there been updates to the SWPPP when any modifications to its mplementation have occurred, including a record of dates when major 19 3rading activities occur, construction activities temporarily or permanently ;ease on a portion of the site or stabilization measures are initiated? (CGP Part II 13.4(a))(9VAC25-870-54.G) 20 is there documentation in the SWPPP of replaced or modified controls? CGP Part 11 B.4(b))(9VAC25-870-54.G) 21 Is the SWPPP updated to indicate areas that have reached final stabilization? (CGP Part II B.4(c))(9VAC25-870-54.G) Is the SWPPP updated to indicate properties that are no longer under the 22 "al control of the operator and the dates on which the operator no longer ad legal control over each property? (CGP Part II B.4(d))(9VAC25-870- Does the SWPPP identify the date of any prohibited discharges, the 23 olume released, actions taken to minimize the impact of the release and easures taken to prevent the recurrence of any prohibited discharge? CGP Part If BA(e-f)) (9VAC25-870-54.G) 24 mendments, modifications, or updates to the SWPPP are signed in ccordance with Part III K? (CGP Part II B(5))(9VAC25-870-54.G) INSPECTIONS AND CORRECTIVE ACTIONS Inspections required by the SWPPP are conducted at the required 25 frequency, including a modified frequency for impaired water(s), approved TMDL(s), and exceptional waters when applicable? (CGP Part II F (2)) (CGP Part II A.5.b.3) No JN/AJ Reviewed during inspection? []Yes I3I4io Page 2 of 7 26 app ica Inspection reports are completed and signed in accordance with CGP Part II F (34)? (CGP Part 11 F (3-4)) 27 Corrective actions are taken consistent with the requirements of the CGP? (CGP Part 11 G(1-2)) ESC AND SWM PLAN IMPLEMENTATION Yes No N/A Reviewed during inspection? ZYes ONo Comments/Descdpdon 28 Have stream buffets and steep slopes been protected as shown on the plan? Sequencing of the project is implemented in accordance with the 29 approved erosion and sediment control plan and stormwater management plans? (9VAC25-870-54.13 and C) Have all denuded areas requiring temporary or permanent stabilization been stabilized, and have stabilization requirements for impaired waters, 30 approved TMDL(s), pollutants of concern and exceptional waters, when I' t� 9VAC 25 840-401 9VAC25-870-54 B 9VAC2r, - bI b e, een me . ( . ) ( . ) 880-60) (CGP Part I F.1(a)) (CGP Part 11 A.5.b(1)) (CGP Part 11 A.2.c (8)) (CGP II E(1-2)) Are soil stockpiles adequately stabilized with seeding and/or protected 39 with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part 11 A permanent vegetative cover has been established that is uniform,ra�J�Seer.Zl/�aFfS^ 9P,�lcc� 32 mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3) �7 (CGP Part 11 A.2(c)) (CGP li E(1-2)) (9VAC25-870-54.13) Have sediment trapping facilities been constructed as the first step in land 33 disturbance activities? (9VAC 25-840-40.4) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Have earthen structures been stabilized immediately after installation? 34 (9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870- Are sediment traps and basins installed in accordance with MS-6 and the 35 approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Are finished cut and fill slopes adequately stabilized to prevent or correct 36 excessive erosion? (9VAC 2M40-40.7) (CGP Part 11 A.2(c)) (CGP II E(1- 2)) (9VAC25-870-54.B) Is concentrated runoff down cut or fill slopes contained in an adequate 37 permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Is adequate drainage or other protection provided for water seeps? 38 (9VAC 25-840-40.9) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870- 54.6) Do all operational storm sewer inlets have adequate inlet protection? 39 (9VAC 25-840-40.10) (CGP Part 11 A.2(c)) (CGP 11 E(1-2)) (9VAC25-870- 54.B) Are stormwater conveyance channels adequately stabilized with channel 40 lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part it A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-54.B) Is in -stream construction conducted using measures to minimize channel 49 damage? (9VAC 25-840-40.12) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B) Are temporary stream crossings of non -erodible material installed where 42 applicable? (9VAC 25-840-40.13) (CGP Part 11 A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-54. B) 43 Is necessary restabilization of in -stream construction complete? (9VAC 25-840-40.15) (CGP 11 E(1-2)) (9VAC25-870-54.B) Are utility trench operations conducted and stabilized in accordance with 44 MS-16? (9VAC 25-840-40.16) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B) Are soil and mud kept off paved or public roads to minimize the transport 45 of sediment? (9VAC 25-840-40.17) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B) Page 3 of 7 Have all temporary control structures that are no longer needed been 46 removed and disturbed soil resulting from their removal permanently stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP 11 E(1-2)) ! (9VAC25-870-54. B) Are properties and waterways downstream from development adequately 47 protected from erosion, sediment and damage in accordance with the standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840- 40.19(a-n)) 48 Permanent control measures included in the SWPPP are in place? (9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II FA(a)) POLLUTION PREVENTION PLAN IMPLEMENTATION Yes No N/A Reviewed during inspection? ❑YesCINo Comments/Descrip6on Practices are in place to prevent and respond to leaks, spills, and other releases including () procedures for expeditiously stopping, containing, 49 and cleaning up spills, leaks, and other releases; and (i) procedures for reporting leaks, spills, and other releases in accordance with Part III G? (CGP Part 11 A.4.e(1))(9VAC25-870-56) Practices are in place to prevent the discharge of spilled and leaked fuels 50 and chemicals from vehicle fueling and maintenance activities? (CGP Part II A.4.e(2))(9VAC25-870-56) Practices are in place to prevent the discharge of soaps, solvents, 51 detergents, and wash water from construction materials, including the dean -up of stucco, paint, form release oils, and curing compounds? (CGP Part 11 A.4.e(3))(9VAC25-870-56) Practices are in place to minimize the discharge of pollutants from vehicle 52 and equipment washing, wheel wash water, and other types of washing? (CGP Part II A.4.e(4))(9VAC25-870-56) 53 Concrete wash water is directed into a leak -proof container or leak -proof settling basin? (CGP Part 11 A.4.e(5))(9VAC25-870-56) Practices are in place to minimize the discharge of pollutants from 54 storage, handling, and disposal of construction products, materials, and wastes? (CGP Part Il A.4.e(6))(9VAC25-870-56) Practices are in place to prevent the discharge of fuels, oils, and other 55 petroleum products, hazardous or toxic wastes, and sanitary wastes? (CGP Part 11 A.4.e(7)(9VAC25-870-56) Practices are in place to minimize any other discharge from the potential 56 pollutant -generating activities not addressed above, when applicable? (CGP Part II A.4.e(8))(9VAC25-870-56) r hspector Signatures L Date: 3�lz8fTr Page 4 of 7