HomeMy WebLinkAboutWPO201500055 Inspection 2018-06-19COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902-4696
Phone (434) 296-5832 Fax (434) 972-4126
VSMPIVESCP PERMIT SITE INSPECTION REPORT
Project Name:
Branchlands Whistler House
Project/WPO Number:
WPO2015-00055
Project Address:
1250 Branchlands Dr
DEQ Permit Number (if
applicable):
VAR101393
Project Operator:
W.M. Jordan
Operator Telephone #:
804-233-6921
Project Contact:
Roy Jones
Contact Telephone #:
804-233-6921
Contact E-Mail:
Qualified Personnel (QP):
Everett Treadway 37336
Inspector:
Geoff Elsie
Weather (Wet/Dry/Rain):
Disturbed Acreage:
1.36
Inspection Data & Time:
Single -Family: ❑ Yes ❑No
Stage of Construction: LJ Pre -Construction Meeting
❑ Building Construction ❑ Final Grading ❑
❑ Notice of Termination Other.
LJ Initial Clearing & Grading
Construction of SWM Facilities
Rough Grading
P15�lnal Stabilization
Re -Inspection:
❑ Yes
COVERAGE & POSTING REQUIREMENTS
Yes
No
WA
Reviewed during re -inspection? ❑Yes []No
Comments699 fption
1
Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
(9VAC25-870-310)(Alb. Co. Code § 17-300,17-302)
2
A copy of the notice of coverage letter is posted conspicuously near the
main entrance of the construction activity? (CGP Part I I.C)
Notice of the location of the SWPPP is posted near the site's entrance, if
01
3
applicable, and information for public access is provided? (9VAC25-870-
54.GxCGP Part II D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS
Yes
No
N/A
Reviewed during re -inspection? []Yes []No
CommentvDescripdan
¢
The SWPPP is on -site or made available during the inspection? (CGP
Part II D.1
& 2)(9VAC25-870-54.G)
.�
5
The SWPPP contains a signed copy of the registration statement?
(CGP Part II A.1.a)
6
The SWPPP includes, upon receipt, a copy of the notice of coverage
letter and the CGP? (CGP Part II A.1.b & c)
Page 1 of 7
The SWPPP includes a narrative description of the nature of the
7 construction activity, including the function of the project? (CGP Part I I
A.1.d)
The SWPPP includes a legible site plan identifying all appropriate
8 measures and that includes the locations of support activities and the
onske rain gauge, when applicable? (CGP Part 11 A.1.e(1-7))
9 The SWPPP contains the name, phone number and qualifications of
"Qualified Personnel" conducting inspections? (CGP Part II A.B)
10 The SWPPP contains an approved erosion and sediment control plan?
(9VAC25-870-54.B)(CGP Part II.A.2)
The SWPPP contains an approved stormwater management plan or an
11 existing construction site has a stormwater management plan that
ensures compliance with the water quality and quantity requiremen ?
(9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 11112JR11.0 ❑
12 The SWPPP contains an adequate pollution prevention plan? (9VAC25-
870-54.D)(CGP Part II.A.4)
13 ,The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
concern, exceptional waters and the additional controls measures
applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b))
14 Delegation of Authority is provided and signed in accordance with Part III
K. (CGP Part 11 A.7)
15 The SWPPP is signed and dated in accordance with Part III K? (CGP Pa
j 11 A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES Iyes No IN/AI Reviewed during inspection? ❑Yes []No
is the SWPPP being amended. whenever there is a change in the design,
18 onstruction, operation, or maintenance that has a significant effect on the
discharge of pollutants to surface waters? (CGP Part 11 B(1))(9VAC25-870- j
Has the SWPPP been amended if inspections or investigations by the
1 perator's qualified personnel, or by local, state or federal officials find that
xisting control measures are ineffective in minimizing pollutants in
discharges? (CGP Part II B(2))(9VAC25-870-54.G)
18 iContractor(s) that will implement and maintain each control measure are
lidentified? (CGP Part II B(3)x9VAC25-870-54.G)
Have there been updates to the SWPPP when any modifications to its
implementation have occurred, including a record of dates when major
19 rading activities occur, construction activities temporarily or permanently
ase on a portion of the site or stabilization measures are initiated? (CGP
Part II B.4(a))(9VAC25-870-54.G)
20 Is there documentation in the SWPPP of replaced or modified controls?
CGP Part 11 B.4(b))(9VAC25-870-54.G)
21 !Is the SWPPP updated to indicate areas that have reached final
stabilization? (CGP Part II B.4(c))(9VAC25-870-54.G)
lis the SWPPP updated to indicate properties that are no longer under the
22 pegal control of the operator and the dates on which the operator no longer
1had legal control over each property? (CGP Part II B.4(d))(9VAC25-870-
)oes the SWPPP identify the date of any prohibited discharges, the
23 olume released, actions taken to minimize the impact of the release and
easures taken to prevent the recurrence of any prohibited discharge?
CGP Part 11 BA(e-f)) (9VAC25-870-54.G)
24 mendments, modifications, or updates to the SWPPP are signed in
ccordance with Part III K? (CGP Part II B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS lyesl No jN/A1 Reviewed during inspection? ❑Yes [:]No
Page 2 of 7
Inspections required by the SWPPP are conducted at the required
25 frequency, including a modified frequency for impaired water(s), approved
TMDL(s), and exceptional waters when applicable? (CGP Part II F (2))
(CGP Part II A.5.b.3)
26 Inspection reports are completed and signed in accordance with CGP
Part II F (3-4)? (CGP Part II F (3-4))
27 Corrective actions are taken consistent with the requirements of the
CGP. (CGP Part II G(1-2))
ESC AND SWM PLAN IMPLEMENTATION Yes No NlAi Reviewed during inspedlon? []Yes []No
CommenWiDear.4pdim
28 Have stream buffers and steep slopes been protected as shown on the
plan?
Sequencing of the project is implemented in accordance with the
29 approved erosion and sediment control plan and stormwater managemen
plans? (9VAC25-870-54.B and C)
Have all denuded areas requiring temporary or permanent stabilization
been stabilized, and have stabilization requirements for impaired waters,
30 approved TMDL(s), pollutants of concern and exceptional waters, when
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25
880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8))
(CGP II E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
31 with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II
A.2(c)) (9VAC25-870-54.13)
A permanent vegetative cover has been established that is uniform,
32 mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
(CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Have sediment trapping facilities been constructed as the first step in land
33 disturbance activities? (9VAC 25-840-40.4) (CGP Part II A.2(c)) (CGP 11
E(1-2)) (9VAC25-870-54.B)
Have earthen structures been stabilized immediately after installation?
34 (9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Are sediment traps and basins installed in accordance with MS-6 and the
35 approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part 11
A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-54.B)
Are finished cut and fill slopes adequately stabilized to prevent or correct
36 excessive erosion? (9VAC 25-840-40.7) (CGP Part 11 A.2(c)) (CGP II E(1-
2)) (9VAC25-870-54.8)
Is concentrated runoff down cut or fill slopes contained in an adequate
37 permanent or temporary structure? (9VAC 254840-40.8) (CGP Part I I
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Is adequate drainage or other protection provided for water seeps?
38 (9VAC 25-840-40.9) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Do all operational storm sewer inlets have adequate inlet protection?
39 (9VAC 25-840-40.10) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Are stomiwater conveyance channels adequately stabilized with channel
40 lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part I I A.2(c))
(CGP 11 E(1-2)) (9VAC25-870-54.13)
Is in -stream construction conducted using measures to minimize channel
41 damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54.8)
Are temporary stream crossings of non -erodible material installed where
42 applicable? (9VAC 25-840-40.13) (CGP Part 11 A.2(c)) (CGP 11 E(1-2))
(9VAC25-870-54.B)
43 Is necessary restabilization of in -stream construction complete? (9VAC
25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.13)
Page 3 of 7
Are utility trench operations conducted and stabilized in accordance with
44 MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54.13)
Are soil and mud kept off paved or public roads to minimize the transport
45 of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2))
i
(9VAC25-870-54.B)
Have all temporary control structures that are no longer needed been
46 removed and disturbed soil resulting from their removal permanently
stabilized? (9VAC 25-840-40.18) (CGP Part 11 A.2(c)) (CGP 11 E(1-2))
(9VAC25-870-54.B)
'
Are properties and waterways downstream from development adequately
protected from erosion, sediment and damage in accordance with the
47
a
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840-
,,4
1 40.19(a-n))
1 Permanent control measures included in the SWPPP are in place?
48
(9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a))
1 POLLUTION PREVENTION PLAN IMPLEMENTATION iYes
No!N/A1
Reviewed during inspection. ❑Yes ❑No
Comments/Descdption
1 Practices are in place to prevent and respond to leaks, spills, and other
'
releases including (i) procedures for expeditiously stopping, containing, I
1
I
49 and cleaning up spills, leaks, and other releases; and (ii) procedures for
reporting leaks, spills, and other releases in accordance with Part III G?
(CGP Part II A.4.e(1))(9VAC25-870-56)
Practices are in place to prevent the discharge of spilled and leaked fuels
50 and chemicals from vehicle fueling and maintenance activities? (CGP Part I I
`
A.4.e(2 ))(9VAC25-870-56)
Practices are in place to prevent the discharge of soaps, solvents,
59 detergents, and wash water from construction materials, including the
clean-up of stucco, paint, form release oils, and curing compounds? (CGP
I
I Part II A.4.e(3))(9VAC25-870-56) d
Practices are in place to minimize the discharge of pollutants from vehicle
'
52 and equipment washing, wheel wash water, and other types of washing?
(CGP Part 11 A.4.e(4)x9VAC25-870-56)
Concrete wash water is directed into a leak -proof container or leak -proof
53
!
settling basin? (CGP Part II A.4.e(5))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from
54 storage, handling, and disposal of construction products, materials, and
I
wastes? (CGP Part II A.4.e(6))(9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
55 petroleum products, hazardous or toxic wastes, and sanitary wastes?
(CGP Part II A.4.e(7x9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
56 pollutant -generating activities not addressed above, when applicable?
_/Yf\11-1.^nl^ C^1
�a.ur rai L n
Inspector Signature:
Date: 6.r/5;'4_
Page 4 of 7
Notes:
-e--eJ
e-w -::0 ob-ii-4
CONSTRUCTION GENERAL PERMIT SITE INSPECTION REPORT
Project Name:
REQUEST FOR CORRECTIVE ACTION
Permit Number (if applicable):
Date:
Regulatory
Checklist #
Citation/Legal
Occurrence
ObservatlontRecommended Corrective Acton
requirement'
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
1 Refers to applicable regulation found In the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and
Sediment Control Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for
Discharges of Stormwater from Construction Activities (9VAC25-880).
Page 5of7
Recommended Convcdve Action:
Recommended Corrective Action Deadline:
Tarcieted Re -inspection Date:
Comments:
The recommended corrective action deadline date applies to all conditions noted on this report unless otherwise noted. If listed condition(s) currently
constitute non-compliance and/or corrective actions are not completed by the deadline, other enforcement actions may be issued to the entity responsible for
ensuring compliance on the above project.
Inspector Signature:
Page 6 of 7
Date:
CONSTRUCTION GENERAL PERMIT SITE INSPECTION PHOTO LOG
Project Name:
Permit Numtrer; Daw.
Page 7 of 7