HomeMy WebLinkAboutWPO201600082 Inspection 2018-06-22COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMPIVESCP PERMIT SITE INSPECTION REPORT
Project Name:
5th Street Commercial Development
Project/WPO Number:
WP02016-00082
Project Address:
5th Street
DEQ Permit Number (If
applicable):
VAR10K228
Project Operator:
Design Builders, LLC
Operator Telephone #:
434-906-2702
Project Contact:
Katurah Roell
Contact Telephone #:
434.906-2702
Contact E-Mail:
katurahsr@gmaii.com
Qualified Personnel (QP):
Isaiah Nisos — D07186
Inspector:
Geoff Elsie
Weather (Wet/Dry/Rain):
7o S
Disturbed Acreage:
4.41
Inspection Date & Time:
Q'
Single -Family: ❑ Yes o
Stage of Construction: LJ Pre -Construction Meeting LJ Initial Clearing & Grading
❑ Building Construction ❑ Final Grading ❑ Construction of SWM Facilities
❑ Notice of Termination EI Other: ,
Rough Grading
❑ Final Stabilization
Re -inspection:
❑ Yes 290
COVERAGE & POSTING REQUIREMENTS
Yes
No
N/A
Reviewed during re -inspection? ❑Yes ❑No
Comments/DescripMw
1
Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
(9VAC25-870-310)(Alb. Co. Code §17-300, 17-302)
2
A copy of the notice of coverage letter is posted conspicuously near the
main entrance of the construction activity? (CGP Part II.C)
Notice of the location of the SWPPP is posted near the site's entrance, if
3
applicable, and information for public access is provided? (9VAC25-870-
54.GxCGP Part II D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS
Yes
No
WA
Reviewed during re -inspection? []Yes []No
Comments/�esaiptlon
4
The SWPPP is on -site or made available during the inspection? (CGP
Part II 13.1 & 2)(9VAC25-870-54.G)
5
The SWPPP contains a signed copy of the registration statement?
(CGP Part 11 A.1.a)
6
The SWPPP includes, upon receipt, a copy of the notice of coverage
letter and the CGP? (CGP Part Il A.1.b & c)
Page 1 of 7
The SWPPP includes a narrative description of the nature of the
7 construction activity, including the function of the project? (CGP Part II
A.1.d)
The SWPPP includes a legible site plan identifying all appropriate
8 measures and that includes the locations of support activities and the
onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7))
9 The SWPPP contains the name, phone number and qualifications of
"Qualified Personnel" conducting inspections? (CGP Part II A.6)
10 The SWPPP contains an approved erosion and sediment control plan?
(9VAC25-870-54.B)(CGP Part 1I.A.2)
The SWPPP contains an approved stormwater management plan or an
existing construction site has a stormwater management plan that
1 f Ii ensures compliance with the water quality and quantity requirerpnts?
! (9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 111.113 ILC ❑
12 ' The SWPPP contains an adequate pollution prevention plan? (9VAC25-
870-54.D)(CGP Part II.A.4)
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
13 concern, exceptional waters and the additional controls measures
applicable? (9VAC 25-870-54.EXCGP Part IIA.5 (a-b))
14 Delegation of Authority is provided and signed in accordance with Part III
K? (CGP Part 11 A.7)
15 The SWPPP is signed and dated in accordance with Part III K? (CGP Pa
II A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES IYesl No
Is the SWPPP being amended whenever there is a change in the design,
construction, operation, or maintenance that has a significant effect on the
1B ,discharge of pollutants to surface waters? (CGP Part II B(1))(9VAC25-870-
�perator's
as the SWPPP been amended if inspections or investigations by the
17 qualified personnel, or by local, state or federal officials find that
Asting control measures are ineffective in minimizing pollutants in
ischarges? (CGP Part 11 B(2))(9VAC25-870-54.G)
18 1Contractor(s) that will implement and maintain each control measure are
udentified? (CGP Part 11 B(3))(9VAC25-870-54.G)
!Have there been updates to the SWPPP when any modifications to its
implementation have occurred, including a record of dates when major
19 3rading activities occur, construction activities temporarily or permanently
ease on a portion of the site or stabilization measures are initiated? (CGP
Part Ii BA(a))(9VAC25-870-54.G)
20 Is there documentation in the SWPPP of replaced or modified controls?
CGP Part 11 B.4(b))(9VAC25-870-54.G)
21 is the SWPPP updated to indicate areas that have reached final
stabilization? (CGP Part II B.4(c))(9VAC25-870-54.G)
Is the SWPPP updated to indicate properties that are no longer under the
22 legal control of the operator and the dates on which the operator no longer
shad legal control over each property? (CGP Part 11 13.4(d))(9VAC25-870-
Does the SW PPP identify the date of any prohibited discharges, the
23 volume released, actions taken to minimize the impact of the release and
measures taken to prevent the recurrence of any prohibited discharge?
(CGP Part 11 B.4(e-f)) (9VAC25-870-54.G)
24 Amendments, modifications, or updates to the SWPPP are signed in
[accordance with Part III K? (CGP Part 11 B(5)x9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS IYesl No
Reviewed during inspection? ❑Yes ❑No
A44PLe- Ft. ►-
q prw r-e
t)p +�AFA
�s`,r�.�,,✓,J s
k-z.,L/ G
Reviewed during inspection? ❑Yes [:]No
Page 2 of 7
Are utility trench operations conducted and stabilized in accordance with
44 MS-16? (9VAC 25-840-40.16) (CGP Part Il A.2(c)) (CGP II E(1-2))
(9VAC25-870-54.B)
Are soil and mud kept off paved or public roads to minimize the transport
45 of sediment? (9VAC 25-840-40.17) (CGP Part 11 A.2(c)) (CGP 11 E(1-2))
(9VAC25-870-54.B)
Have all temporary control structures that are no longer needed been
46 removed and disturbed soil resulting from their removal permanently
stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP 11 E(1-2))
(9VAC25-870-54.8)
Are properties and waterways downstream from development adequately
47 protected from erosion, sediment and damage in accordance with the
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840-
40.19(a-n))
48 Permanent control measures included in the SWPPP are in place?
(9VAC25-870-54.C) (9VAC25-880-60) (CGP Part 11 F.1(a))
POLLUTION PREVENTION PLAN IMPLEMENTATION Yes No MA Reviewed during inspection? []Yes ❑No
Comment&Vescriptkm
Practices are in place to prevent and respond to leaks, spills, and other
releases including (1) procedures for expeditiously stopping, containing,
49 and cleaning up spills, leaks, and other releases; and (11) procedures for
reporting leaks, spills, and other releases in accordance with Part III G?
(CGP Part 11 A.4.e(7))(9VAC25-870-56)
Practices are in place to prevent the discharge of spilled and leaked fuels
50 and chemicals from vehicle fueling and maintenance activities? (CGP Part II
A.4.e(2)x9VAC25-870-56)
Practices are in place to prevent the discharge of soaps, solvents,
59 detergents, and wash water from construction materials, including the
clean-up of stucco, paint, form release oils, and curing compounds? (CGP
Part II A.4.e(3))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from vehicle
52 and equipment washing, wheel wash water, and other types of washing?
(CGP Part 11 A.4.e(4)j(9VAC25-870-56)
53 Concrete wash water is directed into a leak -proof container or leak -proof
settling basin? (CGP Part 11 A.4.e(5)x9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from
54 storage, handling, and disposal of construction products, materials, and
wastes? (CGP Part 11 A.4.e(6)X9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
55 petroleum products, hazardous or to)ac wastes, and sanitary wastes?
(CGP Part 11 A.4.e(7)(9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
56 pollutant -generating activities not addressed above, when applicable?
(CGP Part II A.4.e(8))(9VAC25-870-56)
Inspector Signature:
te: G ' Z Z — /,P'
Page 4 of 7
Inspections required by the SWPPP are conducted at the required V�e�
25 i frequency, including a modified frequency for impaired water(s), approved
1 TMDL(s), and exceptional waters when applicable? (CGP Part II F (2))
(CGP Part II A.5.b.3)
Inspection reports are completed and signed in accordance with CGP
25 + Part II F (3-4)? (CGP Part II F (3-4))
27 Corrective actions are taken consistent with the requirements of the �/ I
I CGP? (CGP Part II G(1-2))
ESC AND SWM PLAN IMPLEMENTATION IYes,
No INIA
Reviewed during inspection? ❑Yes []No
CommentsIDescd 0don
28
Have stream buffers and steep slopes been protected as shown on the
plan?
�I
29
Sequencing of the project is implemented in accordance with the
approved erosion and sediment control plan and stormwater managemen
`
/1
I <<
Y-e J f AP
S�
plans? (9VAC25-870-54.B and C)
S Have all denuded areas requiring temporary or permanent stabilization s.
been stabilized, and have stabilization requirements for impaired waters, j
S 1/�� �5
30
+approved TMDL(s), pollutants of concern and exceptional waters, when
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25
880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8))
{
(CGP 11 E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
fir _,
31
with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II
A.2(c)) (9VAC25-870-54.13) ii
A permanent vegetative cover has been established that is uniform,
32
mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
I'
(CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.13)
'•
Have sediment trapping facilities been constructed as the first step in Iand
; ,5�'K� r•dS -
33
disturbance activities? (9VAC 25-840-40.4) (CGP Part II A.2(c)) (CGP II
E(1-2)) (9VAC25-870-54.B)
Have earthen structures been stabilized immediately after installation?
34
(9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-
54.8)
Are sediment traps and basins installed in accordance with MS-6 and the
'
35
approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Are finished cut and fill slopes adequately stabilized to prevent or correct
W �k a� j Jr.
'
36
excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP 11 E(1-
2)) (9VAC25-870-54.B)
l
Is concentrated runoff down cut or fill slopes contained in an adequate
37
permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part li
A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-54.13)
Is adequate drainage or other protection provided for water seeps?
38
(9VAC 25-840-40.9) (CGP Part I A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.8)
+
Do all operational storm sewer inlets have adequate inlet protection?
I
39
(9VAC 25-840-40.10) (CGP Part 11 A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-
54.13)
Are stormwater conveyance channels adequately stabilized with channel
40
lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part I I A.2(c))
(CGP II E(1-2)) (9VAC25-870-54.B)
41
i Is in -stream construction conducted using measures to minimize channel
damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP II E(1-2))
i
Are temporary stream crossings of non -erodible material installed where
42 applicable? (9VAC 25-840-40.13) (CGP Part it A.2(c)) (CGP 11 E(1-2))
(9VAC25-870-54.13)
43 Is necessary restabilization of in -stream construction complete? (9VAC
25-840-40.16) (CGP II E(1-2)) (9VAC25-870-54.B)
Page 3of7
Notes:
CONSTRUCTION GENERAL PERMIT SITE INSPECTION REPORT
REQUEST FOR CORRECTIVE ACTION
Project Name: Permit Number (if applicable): Date:
ry Regulato
Occurrence
ObservationlRecommended Corrective Action
Checklist #
Citation/Legtry
requirement'
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
1 Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and
Sediment Control Regulations (9VAC25-840), the Virginia Stonnwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for
Discharges of StDrmwater from Construction Activities (9VAC25-880).
Page 5 of 7
Recommended Corrective Action:
Recommended Corrective Action Deadline:
Tarneted Re-Insoection Date:
Comments:
The recommended corrective action deadline date applies to all conditions noted on this report unless otherwise noted. If listed condition(s) currently
constitute non-compliance and/or corrective actions are not completed by the deadline, other enforcement actions may be issued to the entity responsible for
ensuring compliance on the above project.
Inspector Signature:
Page 6 of 7
Date:
CONSTRUCTION GENERAL PERMIT SITE INSPECTION PHOTO LOG
Project game_
FIB 1
DescripRli�n;
"Photo'
Fig.
Permit Number:
Dwte:
Fig_ A
Descriplmn Deseriptlarr
PF�t�la" "Photo"
Page 7 pF 7