VSMPIVESCP PERMIT SITE INSPECTION REPORT
Project Name:
Riverside Village
ProjectNfPO Number:
WP02014-00074
Project Address:
Rt 20 South of the Elks Lodge
DEQ Permit Number (if
a licabie):
VAR10E316
Project Operator:
:r* V4I r
Operator Telephone #:
Project Contact:
�.S
Contact Telephone #:
Contact E-Mail:
f
`
Qualified Personnel (QP):
Inspector:
Geoff Else
Weather (Wet/Dry/Rain):
Disturbed Acreage:
11.64
inspection Date & Time:
Single -Family. ❑ Yes 2rNo
Stage of Construction: LJ Pre -Construction Meeting
❑ Building Construction ❑ Final Grading ❑
❑ Notice of Termination ❑ Other:
L Initial Clearing & Grading
Construction of SWM Facilities
Rough Grading
❑ Final Stabilization
Re -Inspection:
❑ Yes 0 No
COVERAGE & POSTING REQUIREMENTS
Yes
No
N/A
Reviewed during re -inspection? []Yes []No
Comments/Descripdon
1
Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
(9VAC25-870-310)(Alb. Co. Code §17-300, 17-302)
2
A copy of the notice of coverage letter is posted conspicuously near the
main entrance of the construction activity? (CGP Part II.C)
Notice of the location of the SWPPP is posted near the site's entrance, if
3
applicable, and information for public access is provided? (9VAC25-870-
54.G)(CGP Part II D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS
Yes
No
N/A
Reviewed during re -inspection? []Yes [:]No
CommentsVescrip6on
4
The SWPPP is on -site or made available during the inspection? (CGP
Part 11 D.1 & 2)(9VAC25-870-54.G)
5
The SWPPP contains a signed copy of the registration statement?
(CGP Part II A.1.a)
e
The SWPPP includes, upon receipt, a copy of the notice of coverage
letter and the CGP? (CGP Part II A.1.b & c)
/
Page 1 of 7
—. .-.-. a r,r,r.,__ 1.. �__ _ ____a:__— r— :..a:......i 4L.......a.--4F fh..
7
I JJU OVVr'r r- IIHJIUUGh U 1142110L1YG %JGA I1'.luv11 V1 U— 11--
construction activity, including the function of the project? (CGP Part II
AAA) f j
The SWPPP includes a legible site plan identifying all appropriate
8
measures and that includes the locations of support activities and the
onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7))
;
The SWPPP contains the name, phone number and qualifications of
9
"Qualified Personnel" conducting inspections? (CGP Part II A.6) ' I
10
The SWPPP contains an approved erosion and sediment control plan?
(9VAC25-870-54.B)(CGP Part II.A.2)
The SWPPP contains an approved stormwater management plan or an ! ;
existing construction site has a stormwater management plan Jtha11
the
requirnts?9VAC25-870-54.0
ensures compliance with water quality and quantity
CGP Part II.A.3) Technical Criteria II.BLC ❑
The SWPPP contains an adequate pollution prevention plan? (9VAC25- 4
12
870-54.D)(CGP Part II.A.4)
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
! 13
concern, exceptional waters and the additional controls measures ,
applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b))
Delegation of Authority is provided and signed in accordance with Part III
14
K? (CGP Part I A.7) j '•
i
The SWPPP is signed and dated in accordance with Part III K? (CGP Parts.i
I
15
II A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES Ye No
N/A
Reviewed during inspection? ❑Yes []No
Comments/Descripdon
Is the SWPPP being amended whenever there is a change in the design, !
j
onstruction, operation, or maintenance that has a significant effect on the
16
ischarge of pollutants to surface waters? (CGP Part II B(1))(9VAC25-870-
i
!
S4.G)
'Has the SWPPP been amended if inspections or investigations by the
!
operator's qualified personnel, or by local, state or federal officials find that
I 17
iexisting control measures are ineffective in minimizing pollutants in
discharges? (CGP Part II B(2)x9VAC25-870-54.G)
18
Contractor(s) that will implement and maintain each control measure areXii
II B(3))(9VAC25-870-54.G)
identified? (CGP Part
Have there been updates to the SWPPP when any modifications to its I
limplementation have occurred, including a record of dates when major
f
19
�rading activities occur, construction activities temporarily or permanently i
.cease on a portion of the site or stabilization measures are initiated? (CGP +
IPart 11 B.4(a))(9VAC25-870-54.G)
lls there documentation in the SWPPP of replaced or modified controls?
20
;(CGP Part II B.4(b))(9VAC25-870-54.G)
21
;Is the SWPPP updated to indicate areas that have reached final j
istabilization? (CGP Part II B.4(c))(9VAC25-870-54.G)
Its the SWPPP updated to indicate properties that are no longer under the i
'legal control of the operator and the dates on which the operator no longer
22
head legal control over each property? (CGP Part II B.4(d))(9VAC25-870-
14.G)
,Does the SWPPP identify the date of any prohibited discharges, the
Ivolume released, actions taken to minimize the impact of the release and i
23
imeasures taken to prevent the recurrence of any prohibited discharge? i
i(CGP Part II B.4(e-f)) (9VAC25-870-•54.G) ;
l ,
Amendments, modifications, or updates to the SWPPP are signed in i
j 24
accordance with Part III K? (CGP Part II B(5)x9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS Yes' No IN/A Reviewed during inspection? ❑Yes ❑No
I Comments/Descripi lon
Page 2 of 7
Inspections required by the SWPPP are conducted at the required
25
frequency, including a modified frequency for impaired water(s), approved
TMDL(s), and exceptional waters when applicable? (CGP Part II F (2))
(CGP Part II A.5.b.3)
26
Inspection reports are completed and signed in accordance with CGP
Part II F (3-4)? (CGP Part II F (3-4))
27 Corrective actions are taken consistent with the requirements of the
CGP? (CGP Part II G(1-2))
ESC AND SWM PLAN IMPLEMENTATION Yes No N/A Reviewed during inspection? ❑Yes [:]No
Comment e"Cripfion
28 Have stream buffers and steep slopes been protected as shown on the
plan?
Sequencing of the project is implemented in accordance with the
29 approved erosion and sediment control plan and stormwater managemen
plans? (9VAC25-870-54.13 and C)
Have all denuded areas requiring temporary or permanent stabilization
been stabilized, and have stabilization requirements for impaired waters,
30 approved TMDL(s), pollutants of concern and exceptional waters, when
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC2
880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part 11 A.2.c (8))
(CGP If E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
31 with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part 11
A.2(c)) (9VAC25-870-54.13)
A permanent vegetative cover has been established that is uniform,
32 mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
(CGP Part If A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-54.B)
Have sediment trapping facilities been constructed as the first step in land
33 disturbance activities? (9VAC 25-840-40.4) (CGP Part II A.2(c)) (CGP II
E(1-2)) (9VAC25-870-54.B)
Have earthen structures been stabilized immediately after installation?
34 (9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-
54.13)
Are sediment traps and basins installed in accordance with MS-6 and the
35 approved plan? (9VAC 25-840-40.6) (CGP Part Il A.2.c (9)) (CGP Part If
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Are finished cut and fill slopes adequately stabilized to prevent or correct
36 excessive erosion? (9VAC 25-840-40.7) (CGP Part 11 A.2(c)) (CGP II E(1-
2)) (9VAC25-870-54.B)
Is concentrated runoff down cut or fill slopes contained in an adequate
37 permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II
A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-54.B)
Is adequate drainage or other protection provided for water seeps?
38 (9VAC 25-840-40.9) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870
54.B)
Do all operational storm sewer inlets have adequate inlet protection?
39 (9VAC 25-840-40.10) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
543)
Are stormwater conveyance channels adequately stabilized with channel
40 fining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part I I A.2(c))
(CGP it E(1-2)) (9VAC25-870-54.B)
Is in -stream construction conducted using measures to minimize channel
41 damage? (9VAC 25-840-40.12) (CGP Part 11 A.2(c)) (CGP 11 E(1-2))
(9VAC25-870-54.B)
Are temporary stream crossings of non -erodible material installed where
42 applicable? (9VAC 25-840-40.13) (CGP Part 11 A.2(c)) (CGP It E(1-2))
{9VAC25-870-54.B)
43 Is necessary restabilization of in -stream construction complete? (9VAC
25-840-40.15) (CGP 11 E(1-2)) (9VAC2"70-54.121)
Page 3of7
Are utility trench operations conducted and stabilized in accordance with
44 1 MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2))
Are soil and mud kept off paved or public roads to minimize the transport
45 of sediment? (9VAC 25-840-40.17) (CGP Part 11 A.2(c)) (CGP It E(1-2))
(9VAC25-870-54.13 )
Have all temporary control structures that are no longer needed been
46 removed and disturbed soil resulting from their removal permanently
stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B)
Are properties and waterways downstream from development adequately
47 protected from erosion, sediment and damage in accordance with the
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840-
40.19(a-n))
48 Permanent control measures included in the SW PPP are in place?
(9VAC25-870-54.C) (9VAC25-880-60) (CGP Part Il F.1(a))
POLLUTION PREVENTION PLAN IMPLEMENTATION
Practices are in place to prevent and respond to leaks, spills, and other
releases including (i) procedures for expeditiously stopping, containing,
49 and cleaning up spills, leaks, and other releases; and (1i) procedures for
reporting leaks, spills, and other releases in accordance with Part III G?
(CGP Part II A.4.e(i))(9VAC25-870-56)
i Practices are in place to prevent the discharge of spilled and leaked fuels
50 i and chemicals from vehicle fueling and maintenance activities? (CGP Part I I
Practices are in place to prevent the discharge of soaps, solvents,
51 detergents, and wash water from construction materials, including the
clean-up of stucco, paint, form release oils, and curing compounds? (CGI
Part II A.4.e(3))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from vehicle
52 and equipment washing, wheel wash water, and other types of washing?
(CGP Part II A.4.e(4))(9VAC25-870-56)
53 Concrete wash water is directed into a leak -proof container or leak -proof
settling basin? (CGP Part II A.4.e(5))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from
54 storage, handling, and disposal of construction products, materials, and
wastes? (CGP Part 11 A.4.e(6)x9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
55 petroleum products, hazardous or toxic wastes, and sanitary wastes?
(CGP Part II A.4.e(7)(9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
56 pollutant -generating activities not addressed abo e, when applicable?
(CGP Part II A.4.e(8))(9VAC25-870-56)
Inspector Signature:
No IN/AI Reviewed during inspection? []Yes ❑No
Date: Cd 2,6 l(r
Page 4 of 7
Notes:
�✓Na�2.� J',tb� s f,
CONSTRUCTION GENERAL PERMIT SITE INSPECTION REPORT
REQUEST FOR CORRECTIVE ACTION
Project Name: Permit Number (if applicable): Date:
Regulatory
Regulatory
Checklist#
Citation/Legal
Occurrence
Observation/Recommended Corrective Action
requirement'
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
I Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and
Sediment Control Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for
Discharges of Stormwater from Construction Activities (9VAC25-880).
Page 5 of 7
Recommended Corrective Action:
Recommended Corrective Action Deadline:
Targeted Re -Inspection Date:
Comments:
The recommended corrective action deadline date applies to all conditions noted on this report unless otherwise noted. It listed condition(s) currently
constitute non-compliance and/or corrective actions are not completed by the deadline, other enforcement actions may be issued to the entity responsible for
ensuring compliance on the above project.
Inspector Signature: _ Date: