VSMPNESCP PERMIT SITE INSPECTION REPORT
Project Name:
Canaan Christian Center
ProjecVWPO Number:
WPO201600054
Project Address:
860 Hacktown Rd
DEQ Permit Number (If
a Ilcable):
VAR10J636
Project Operator:
Canaan Christian Center
Operator Telephone #:
434-760-2352
Project Contact:
Pastors Hernandez
Contact Telephone #:
434-760-2352
Contact E-Mail:
pastorajulia@fetec.org
Qualified Personnel (QP):
Earl W. Cauley - 37700
Inspector:
Geoff Elise
Weather (Wet/Dry/Rain):
�s
Disturbed Acreage:
2.00
Inspection Date & Time:
Single -Family: ❑ Yes
No
Stage of Construction: Pre -Construction Meeting LJ Initial Clearing & Grading LJ Rough Grading
❑ Building Construction ❑ Final Grading ❑ Construction of SWM Facilities L?Knal Stabilization
2 Notice of Termination Other:
Re -Inspection:
❑ Yes ZNo
COVERAGE & POSTING REQUIREMENTS
yes
No
N/A
Reviewed during re -inspection? []Yes ❑No
Commenfs1Description
1
Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
(9VAC25-870-310)(Alb. Co. Code §17-300, 17-302)
2
A copy of the notice of coverage letter is posted conspicuously near the
main entrance of the construction activity? (CGP Part II.C)
Notice of the location of the SWPPP is posted near the site's entrance, if
3
applicable, and information for public access is provided? (9VAC25-870-
54.GxCGP Part 11 D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS
Yes
No
N/A
Reviewed during re -inspection? []Yes []No
Comments0escripffon
4
The SWPPP is on -site or made available during the inspection? (CGP
Part II D.1 & 2)(9VAC25-870-54.G)
5
The SWPPP contains a signed copy of the registration statement?
(CGP Part II A.1.a)
6
The SWPPP includes, upon receipt, a copy of the notice of coverage
letter and the CGP? (CGP Part I I A.1.b & c)
Page 1 of 7
The SWPPP includes a narrative description of the nature of the
7 construction activity, including the function of the project? (CGP Part II
A.1.d)
The SWPPP includes a legible site plan identifying all appropriate
8 measures and that includes the locations of support activities and the
onsite rain gauge, when applicable? (CGP Part 11 A.1.e(1-7))
9 The SWPPP contains the name, phone number and qualifications of
"Qualified Personnel" conducting inspections? (CGP Part II A.6)
10 ° The SWPPP contains an approved erosion and sediment control plan?
(9VAC25-870-54.B)(CGP Part II.A.2)
The SWPPP contains an approved stormwater management plan or an
11 existing construction site has a stormwater management plan that
ensures compliance with the water quality and quantity requirements?
(9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 11.13 ❑ ILC ❑
12 ` The SWPPP contains an adequate pollution prevention plan? (9VAC25-
870-54.D)(CGP Part II.A.4)
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
13 concern, exceptional waters and the additional controls measures
applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b))
14 Delegation of Authority is provided and signed in accordance with Part III
K. (CGP Part II A.7)
15 The SWPPP is signed and dated in accordance with Part III K? (CGP Pa
II A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES
Its the SWPPP being amended whenever there is a change in the design,
16 onstruction, operation, or maintenance that has a significant effect on the
;discharge of pollutants to surface waters? (CGP Part II B(1))(9VAC25-870- I
Has the SWPPP been amended if inspections or investigations by the
17 operator's qualified personnel, or by local, state or federal officials find that !
existing control measures are ineffective in minimizing pollutants in
discharges? (CGP Part II B(2))(9VAC25-870-54.G)
18 Contractor(s) that will implement and maintain each control measure are
identified? (CGP Part II B(3))(9VAC25-870-54.G)
Have there been updates to the SWPPP when any modifications to its
implementation have occurred, including a record of dates when major
19 Orading activities occur, construction activities temporarily or permanently
Icease on a portion of the site or stabilization measures are initiated? (CGP
;Part li B.4(a))(9VAC25-870-54.G)
20 lls there documentation in the SWPPP of replaced or modified controls?
CGP Part II 13.4(b))(9VAC25-870-54.13)
21 Its the SWPPP updated to indicate areas that have reached final
tabilization? (CGP Part 11 B.4(c))(9VAC25-870-54.G)
Is the SWPPP updated to indicate properties that are no longer under the
legal control of the operator and the dates on which the operator no longer
22 had legal control over each property? (CGP Part II B.4(d))(9VAC25-870-
,Does the SWPPP identify the date of any prohibited discharges, the
23 volume released, actions taken to minimize the impact of the release and
;measures taken to prevent the recurrence of any prohibited discharge?
i(CGP Part II B.4(e-f)) (9VAC25-870-54.G)
24 iAmendments, modifications, or updates to the SWPPP are signed in
iaccordance with Part III K? (CGP Part II B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS
No IN/AI Reviewed during inspection? ❑Yes ❑No
No IN1A1 Reviewed during inspection? ❑Yes ❑No
Page 2 of 7
Inspections required by the SWPPP are conducted at the required
25
frequency, including a modified frequency for impaired water(s), approved
TMDL(s), and exceptional waters when applicable? (CGP Part 11 F (2))
(CGP Part II A.5.b.3)
26
Inspection reports are completed and signed in accordance with CGP
Part II F (3-4)? (CGP Part II F (3-4))
27
Corrective actions are taken consistent with the requirements of the
CGP? (CGP Part II G(1-2))
ESC AND SWM PLAN IMPLEMENTATION Yes No WA
Reviewed during inspection? ❑Yes (]No
CommentaVescrfpdon
28
Havestream buffers and steep slopes been protected as shown on the
plan?
Sequencing of the project is implemented in accordance with the
29
approved erosion and sediment control plan and stormwater managemen
plans? (9VAC25-870-54.B and C)
Have all denuded areas requiring temporary or permanent stabilization
4�
been stabilized, and have stabilization requirements for impaired waters,
30
approved TMDL(s), pollutants of concern and exceptional waters, when
e}J d�LQ.1
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.13) (9VAC2
880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8)).
(CGP II E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
31
with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part 11
A.2(c)) (9VAC25-870-54.13)
A permanent vegetative cover has been established that is uniform,
32
mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
(CGP Part Il A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-54.B)
Have sediment trapping facilities been constructed as the first step in land
33
disturbance activities? (9VAC 25-840-40.4) (CGP Part II A.2(c)) (CGP II
E(1-2)) (9VAC25-870-54.B)
Have earthen structures been stabilized immediately after installation?
34
(9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Are sediment traps and basins installed in accordance with MS-6 and the
35
approved plan? (9VAC 25-840-40.6) (CGP Part 11 A.2.c (9)) (CGP Part II
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.13)
Are finished cut and fill slopes adequately stabilized to prevent or correct
36
excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP II E(1-
5
2)) (9VAC25-870-54.B)
Is concentrated runoff down cut or fill slopes contained in an adequate
37
permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II
A.2(c)) (CGP II E(1-2)) (9VAC25-870-4.B)
Is adequate drainage or other protection provided for water seeps?
38
(9VAC 25-840-40.9) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Do all operational storm sewer inlets have adequate inlet protection?
39
(9VAC 25-840-40.10) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Are stomawater conveyance channels adequately stabilized with channel
40
lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part 11 A.2(c))
(CGP II E(1-2)) (9VAC25-870-54.8)�,
Is in -stream construction conducted using measures to minimize channel
41
damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54.B)
Are temporary stream crossings of non -erodible material installed where
42
applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP 11 E(1-2))
(9VAC25-870-54.13)
43
Is necessary restabilization of in -stream construction complete? (9VAC
25-840-40.15) (CGP 11 E(1-2)) (9VAC25-870-54.B)
Page 3 of 7
�
Are utility trench operations conducted and stabilized in accordance with
44
MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54.8)
Are soil and mud kept off paved or public roads to minimize the transport
45 of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP 11 E(1-2))
(9VAC25-870-54.13)
Have all temporary control structures that are no longer needed been
46 I removed and disturbed soil resulting from their removal permanently
stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2))
/i
4 is /krN ram,
Are properties and waterways downstream from development adequately
47 protected from erosion, sediment and damage in accordance with the
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840- l i
40.19(a-n))
Permanent control measures included in the SWPPP are in place? ' I
48 (9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a)) j
POLLUTION PREVENTION PLAN IMPLEMENTATION ;Yes, No
Reviewed during inspection? ❑Yes []No
Practices are in place to prevent and respond to leaks, spills, and other I
releases including (i) procedures for expeditiously stopping, containing, Il
49 and cleaning up spills, leaks, and other releases; and (ii) procedures for i
reporting leaks, spills, and other releases in accordance with Part III G? +
(CGP Part II A.4.e(1))(9VAC25-870-56) I
Practices are in place to prevent the discharge of spilled and leaked fuels
50 and chemicals from vehicle fueling and maintenance activities? (CGP Part 11
' A.4.e(2))(9VAC25-870-56) +
Practices are in place to prevent the discharge of soaps, solvents, j
51 detergents, and wash water from construction materials, including the
clean-up of stucco, paint, form release oils, and curing compounds? (CGP
Part II A.4.e(3))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from vehicle
52 and equipment washing, wheel wash water, and other types of washing?
(CGP Part 11 A.4.e(4))(9VAC25-870-56) I
53 Concrete wash water is directed into a leak -proof container or leak -proof
settling basin? (CGP Part II A.4.e(5))(9VAC25-870-56) j
Practices are in place to minimize the discharge of pollutants from
54 storage, handling, and disposal of construction products, materials, and i
wastes? (CGP Part II A.4.e(6))(9VAC25-870-56)
I Practices are in place to prevent the discharge of fuels, oils, and other €
55 .i petroleum products, hazardous or toxic wastes, and sanitary wastes?
i (CGP Part II A.4.e(7)(9VAC25-870-56) '
Practices are in place to minimize any other discharge from the potential
56 i pollutant -generating activities not addressed above, when applicable?
(CGP Part II A.4.e(8))(9VAC25-870-56)
Inspector Signature:
Date: &'
Page 4 of 7
Notes:
CCU J 44e
CONSTRUCTION GENERAL PERMIT SITE INSPECTION REPORT
REQUEST FOR CORRECTIVE ACTION
Project Name: Permit Number (if applicable): Date:
Regulatory
Regulatory
Occurrence
ObservationiRecommended Corrective Action
Checklist #
Citation/Legal
requirement'
Observation:
Recommended CorrectiveAcdon:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
I Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and
Sediment Control Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for
Discharges of Stormwater from Construction Activities (9VAC25-880).
Page 5 of 7
Recommended Corrective Action:
Recommended Corrective Action Deadline:
Tarsieted Re-Insoection Date:
The recommended corrective action deadline date applies to all conditions noted on this report unless otherwise noted. If listed condition(s) currently
constitute non-compliance and/or corrective actions are not completed by the deadline, other enforcement actions may be issued to the entity responsible for
ensuring compliance on the above project.
Inspector Signature:
Date:
Page 6 of 7
CONSTRUCTION GENERAL PERMIT SITE INSPECTION PHOTO LOG
fj sct Name: Permit Number_ Date,
Fig. 9 F19.
Descriptiod- Descri#llon
"Photo" "PhOW
Description. DOcripilian_
°Photo" I "Photo"