VSMPNESCP PERMIT SITE INSPECTION REPORT
Project Name:
Faith Christian Center International
Project(WPO Number:
WP02014-00070
Project Address:
2184 Richmond Road
DEQ Permit Number (If
applicable):
VAR10G420
Project Operator:
Harrrestime FacilitySolutions
Operator Telephone #:
719-532-0780
Project Contact:
Brian Smith
Contact Telephone #:
434-296-36"
Contact E-Mall:
bpspe@embargmail.com
Qualified Personnel (QP):
Malcolm Vanderploeg - 42835
Inspector:
Geoff Elsie
Weather (WetlDry/Rain):
Disturbed Acreage: 1
6.20
inspection Date & Time:
Single -Family: ❑ Yes VNo
Stage of Construction: LJ Pre -Construction Meeting
❑ Building Construction ❑ Final Grading ❑
Notice of Termination Other.
LJ Initial Clearing & Grading LJ
Construction of SWM Facilities
Rough Grading
❑ Final Stabilization
Re -Inspection:
❑ Yes ❑No
COVERAGE & POSTING REQUIREMENTS
Yes
No
JAfIA
Reviewed during re -inspection? []Yes❑No
Comments/DescripaDlon
1
Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
(9VAC25-870-310)(Alb. Co. Code §17-300, 17-302)
2
A copy of the notice of coverage letter is posted conspicuously near the
main entrance of the construction activity? (CGP Part II.C)
Notice of the location of the SWPPP is posted near the site's entrance, if
3
applicable, and information for public access is provided? (9VAC25-870-
54.GxCGP Part II D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS
Yes
No
N/A
Reviewed during re -inspection? []Yes ❑No
CommenWDescrfption
4
The SWPPP is on -site or made available during the inspection? (CGP
Part II DA & 2)(9VAC25-870-54.G)
5
The SWPPP contains a signed copy of the registration statement?
(CGP Part II A.1.a)
6
The SWPPP includes, upon receipt, a copy of the notice of coverage
letter and the CGP? (CGP Part II A.1.b & c)
Page 1 of 7
The SWPPP includes a narrative description of the nature of the
7 l construction activity, including the function of the project? (CGP Part II
1 A.1.d)
The SWPPP includes a legible site plan identifying all appropriate
8 measures and that includes the locations of support activities and the
onsite rain Gauge, when applicable? (CGP Part II A.1.e(1-7))
The SWPPP contains the name, phone number and qualifications of I
9 "Qualified Personnel" conducting inspections? (CGP Part Il A.6)
The SWPPP contains an approved erosion and sediment control plan? !
10 (9VAC25-870-54.B)(CGP Part II.A.2)
The SWPPP contains an approved stormwater management plan or an >
existing construction site has a stormwater management plan that
11 ensures compliance with the water quality and quantity requirements? I ;
(9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 11.8 ❑ ILC ❑
The SWPPP contains an adequate pollution prevention plan? (9VAC25- '
12 870-54.D)(CGP Part II.A.4) {
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of i
13 concern, exceptional waters and the additional controls measures
applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b))
14 Delegation of Authority is provided and signed in accordance with Part Ill
K. (CGP Part II A.7)
15 The SWPPP is signed and dated in accordance with Part III K? (CGP Pa '
11 A.8)
i
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES IYes9 No I N/A1 Reviewed during inspection? ❑Yes []No
Is the SWPPP being amended whenever there is a change in the design,
16 onstruction, operation, or maintenance that has a significant effect on the ;
ischarge of pollutants to surface waters? (CGP Part 11 B(1))(9VAC25-870- i
4.G) i
Has the SWPPP been amended if inspections or investigations by the
operator's qualified personnel, or by local, state or federal officials find that
17 xisting control measures are ineffective in minimizing pollutants in
ischarges? (CGP Part ii B(2))(9VAC25-870-54.G) ! `
i ontractor(s) that will implement and maintain each control measure are %
18 identified? (CGP Part li B(3))(9VAC25-870-54.G) i
Have there been updates to the SWPPP when any modifications to its
implementation have occurred, including a record of dates when major
19 rading activities occur, construction activities temporarily or permanently j
ase on a portion of the site or stabilization measures are initiated? (CGP
;Part 11 B.4(a))(9VAC25-870-54.G)
20 11s there documentation in the SWPPP of replaced or modified controls? i
CGP Part 11 B.4(b))(9VAC25-870-54.G)
{ 21 Is the SWPPP updated to indicate areas that have reached final
!stabilization? (CGP Part 11 13.4(c))(9VAC25-870-54.13) ,
Is the SWPPP updated to indicate properties that are no longer under the
22 legal control of the operator and the dates on which the operator no longer
ad legal control over each property? (CGP Part 11 B.4(d))(9VAC25-870-
4.G)
Does the SWPPP identify the date of any prohibited discharges, the
olume released, actions taken to minimize the impact of the release and
23 measures taken to prevent the recurrence of any prohibited discharge?
CGP Part II BA(e-f)) (9VAC25-870-54.G)
24 mendments, modifications, or updates to the SWPPP are signed in
accordance with Part III K? (CGP Part 11 B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS ;Yes! No iN1AI Reviewed during inspection? []Yes []No
Page 2 of 7
Inspections required by the SWPPP are conducted at the required
25
frequency, including a modified frequency for impaired water(s), approved
TMDL(s), and exceptional waters when applicable? (CGP Part II F (2))
(CGP Part II A.5.b.3)
26
Inspection reports are completed and signed in accordance with CGP
Part II F (3-4)? (CGP Part II F (34))
27
Corrective actions are taken consistent with the requirements of the
CGP? (CGP Part Il G(1-2))
ESC AND SWM PLAN IMPLEMENTATION
Yes
No
MA
Reviewed during inspection? [3Yes []No
Comments0escNpHon
28
Have stream buffers and steep slopes been protected as shown on the
plan?
Sequencing of the project is implemented in accordance with the
29
approved erosion and sediment control plan and stormwater managemen
plans? (9VAC25-870-54.B and C)
Have all denuded areas requiring temporary or permanent stabilization
30
been stabilized, and have stabilization requirements for impaired waters,
approved TMDL(s), pollutants of concern and exceptional waters, when
��`S�►� �] Vd2j ,
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC2
V lJ
880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8))
(CGP II E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
31
with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II
A.2(c)) (9VAC25-870-54.13)
A permanent vegetative cover has been established that is uniform,
32
mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
(CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
`
��� CCV LVA-_
Have sediment trapping facilities been constructed as the first step in land
33
disturbance activities? (9VAC 25-840-40.4) (CGP Part II A.2(c)) (CGP Il
E(1-2)) (9VAC25-870-54.13)
Have earthen structures been stabilized immediately after installation?
34
(9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.131)
Are sediment traps and basins installed in accordance with MS-6 and the
35
approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II
A.2(c)) (CGP II E(1-2)) (9VAC25-870,154.13)
Are finished cut and fill slopes adequately stabilized to prevent or correct
['&te,L
36
excessive erosion? (9VAC 25-840-40.7) (CGP Part 11 A.2(c)) (CGP II E(1-
2)) (9VAC25-870-54.B)
Is concentrated runoff down cut or fill slopes contained in an adequate
37
permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part Il
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Is adequate drainage or other protection provided for water seeps?
38
(9VAC 25-840-40.9) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Do all operational storm sewer inlets have adequate inlet protection?
"� v 2 Cdr-�
39
(9VAC 25-840-40.10) (CGP Part II A.2(c)) (CGP I E(1-2)) (9VAC25-870-
54.13)
�•L� .
Are stormwater conveyance channels adequately stabilized with channel
40
lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part II A.2(c))
(CGP II E(1-2)) (9VAC25-870-54.B)
Is in -stream construction conducted using measures to minimize channel
41
damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54.8)
Are temporary stream crossings of non -erodible material installed where
42
applicable? (9VAC 25-840-40.13) (CGP Part 11 A.2(c)) (CGP II E(1-2))
(9VAC25-870-54.B)
43
Is necessary restabilization of in -stream construction complete? (9VAC
25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.B)
Page 3 of 7
i
Are utility trench operations conducted and stabilized in accordance with
44
MS-16? (9VAC 25-840-40.16) (CGP Part 11 A.2(c)) (CGP II E(1-2))
(9VAC25-870-54.B)
i
# Are soil and mud kept off paved or public roads to minimize the transport
45 I of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54.B)
Have all temporary control structures that are no longer needed been I ,,k p,C� % er"
I removed and disturbed soil resulting from their removal permanently I
i 46 stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54.13) 4045
Are properties and waterways downstream from development adequately
47 protected from erosion, sediment and damage in accordance with the
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840-�
40.19(a-n ))
CIS
Permanent control measures included in the SWPPP are in place? I i
48 (9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a)) I I
POLLUTION PREVENTION PLAN IMPLEMENTATION
Practices are in place to prevent and respond to leaks, spills, and other
releases including (1) procedures for expeditiously stopping, containing,
49 and cleaning up spills, leaks, and other releases; and (ii) procedures for
reporting
I releases in accordance with Part III G?
CGP Part IA.4.e(1))(9VAC25-870 56)
Practices are in place to prevent the discharge of spilled and leaked fuels
50 and chemicals from vehicle fueling and maintenance activities? (CGP Part 11
i
NO !N/A; Reviewed during inspection? ❑Yes []No
Practices are in place to prevent the discharge of soaps, solvents,
59 detergents, and wash water from construction materials, including the i
clean-up of stucco, paint, form release oils, and curing compounds? (CGP'
Part II A.4.e(3))(9VAC25-870-56)
I Practices are in place to minimize the discharge of pollutants from vehicle
52 and equipment washing, wheel wash water, and other types of washing?
(CGP Part II A.4.e(4))(9VAC25-870-56) •,�f t
Concrete wash water is directed into a leak -proof container or leak -proof
i 53 settling basin? (CGP Part II A.4.e(5))(9VAC25-870-56) j
Practices are in place to minimize the discharge of pollutants from t !
54 storage, handling, and disposal of construction products, materials, and ;; I
wastes? (CGP Part 11 A.4.e(6))(9VAC25-870-56) ?'
Practices are in place to prevent the discharge of fuels, oils, and other
s 55 petroleum products, hazardous or toxic wastes, and sanitary wastes?
(CGP Part 11 A.4.e(7)(9VAC25-87056) z
iPractices are in place to minimize any other discharge from the potential
56 pollutant -generating activities not addressed above, when applicable?
(CGP Part II A.4.e(8))(9VAC25-870-56)
Inspector Signature:
Date:
Page 4 of 7
Notes:
CONSTRUCTION GENERAL PERMIT SITE INSPECTION REPORT
Project Name:
REQUEST FOR CORRECTIVE ACTION
Permit Number (if applicable):
Date:
tory Regula
tory
Checklist #
Catlo l
Occurrence
Observation/Recommended Corrective Action
requirement'
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
I Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virglnla Erosion and
Sediment Control Regulations (gVAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for
Discharges of Stormwater from Construction Activities (9VAC25-880).
Page 5 of 7
Recommended Corrective Action.
Recommended Corrective Action Deadline:
Tar eted Re -Inspection Date:
The recommended corrective action deadline date applies to all conditions noted on this report unless otherwise noted, If listed condition(s) currently
constitute non-compliance and/or corrective actions are not completed by the deadline, other enforcement actions may be issued to the entity responsible for
ensuring compliance on the above project -
Inspector Signature: Date:
Page 6 of 7
CONSTRUCTION GENERAL PERMIT SITE INSPECTION PHOTO LOG
Psalout time: Permit Number,
Fig, 1
Description;
"Phdo"
Date-
Fig-
Desc6pt,on:
`Photo"
FIg. 4
Desorption.
'Photo -
Page 7 of 7