Loading...
HomeMy WebLinkAboutWPO201700026 Inspection 2018-06-15Compliant Notice to •Comply ❑ S1np lNorlc R Bond Msp ❑ Under SIMD ❑ Re-inspe dole ftej ❑ SWPPP INSPECTION Project Name: Aa V Ad S File Number: W Q DEQ General Permit Number: County Inspector: h A lnopeptlon Date: - L% Time: . For Warnings or Akftes, DATE TO CCWPLYBY lnKM conbois ❑ Clearing ❑ Rough Grading a Constns Lion [� Finish Grading ❑ Stabilization ❑ svrrn conversion � tree Wo %tt+Bs Pasting at the The coverage lets and SWPPP book location must be posted in a prominent place at site entrance the entrance to the job site, available to the public on request. SWPPPo The complete document must be for inspection on -site avaRabie for review Coverage A current coverage letter (expiration date of 201,9) must be included Registration A registration statement must be included that goes with the coverage letter. The Statement acreage disturbed must be accurate. PPP plan A copy of the polkiiion prevention plan and a copy of the current DEQ permit code must be included in the SWPPP. The plan must be marked to show location of measures. rnspecuon reports must be up4o-date, Informafine, documenting prros, and occurring at reports required Intervals. Rain events and inspections for rein every must be noted. Inspection reportsJcarreLA I Results of inspecfbrrs must be followed up with corrective actions where necessary s/ Fueling stations must be contalned, and spill prevention and cleanup kits In place Washouts A lined sump area must be provided far any concrete washout. Washout facilities for paint, grouts, etc. are also needed. Trash and Trash and debris must be cleaned up so that it does not lemma the job site. Any debris contaminates must be protected from becoming runoff during rains (cover dumpsters). Trash is not to be buried on -site. cannauon ' Sanitation facilities must be provided and maintained, and protected from spills, away from inlets. A Erasion and Sediment Ct '' j P 1,54 e(L A Control and Stormwater Management Per plans and Standards