HomeMy WebLinkAboutWPO201700014 Bond Estimates 2018-07-19Prosect Name: University of Virginia Research Park -Town Center Building Four -Water Protection Ordinance Plan WP0201700014
WPO file number: WP0201700014
Erosion and Sediment Control Bond Estimate
Item Item No. Unit Unit Cost Cost
Number installed
(Note: Qty. reflect phase 1 and 2, without duplication -JA, 7/19/18)
stablization (PS, TS)
silt fence (SF)
safety fence (SAF)
tree protection (TP)
diversion (DV, FD, RWD)
temporary slope drain (TSD) pipe length 0 ft
earthwork for trap/basin
structures for basin
silt fence inlet protection (IP)
stone inlet protection (IP)
outlet protection (OP)
channel (SCC, matted)
check dam
construction entrance (CE)
wash rack
paved construction entrance
rip -rap, placed
height of dam at toeLft ft
.ft
length ft
depth in channel ft
height of fill at face ft
length of dam ft
top width 6
(area above transition) 33 sf
(total width of dam) 12 ft
(height below transition) 3 ft
(area below transition) 9 sf
(total fill volume) 213.9 cy
length of spillway �ft
width of spillway ft
riser height aft
riser diameter 0 in
barrel length 0 ft
barrel diameter 0 in
length
depth
width
survey and layout (price per 0.1 mi.) acres
mobilization
stream crossing (computed independently)
pipe diameter -in
cut at high sideft
cutatface
ft
length of cutoft
ft
width of cut
(area below transition
93 sf
(total width of cut)
43 ft
(depth below transitioi
3 ft
(area above transition
55.5 sf
(total fill volume)
825.0 cy
(TOAL CYestimate)
896 cy
(spillway stone tons)
18 tons
$2,500.00
$0.00
$2,000.00
$0.00
depth
width
survey and layout (price per 0.1 mi.) acres
mobilization
stream crossing (computed independently)
pipe diameter -in
cut at high sideft
cutatface
ft
length of cutoft
ft
width of cut
(area below transition
93 sf
(total width of cut)
43 ft
(depth below transitioi
3 ft
(area above transition
55.5 sf
(total fill volume)
825.0 cy
(TOAL CYestimate)
896 cy
(spillway stone tons)
18 tons
(riser unit price)
$0.00
base plate orfdn
-
(barrel unit price)
$0.00
barrel collars
Mft
baffle length
1081.5 ft
width Fft
width 0 ft
channel width 0 ft
_ft length 0 tft
(tons) 0 tons
traps and basins -
M. Yerbv. 7/19/18; chk. JA -7/19
WP0201700014 UVA Research Park Town Center 4 ESC -bond -est 071918 monicaY
acres
$3,000.00
$37,500.00
236 . ft
$4.50
$10,631.25
1656.0 ft
$4.50
$7,452.00
1081.5 ft
$10000$
R,
2320 ft
$13.00
$30,153.50
$2,109.38
$0.00
$0.00
$13.00 $11,648.00
$50.00 $900.00
$60.00 $0.00
$6,750.00
$2,500.00
$0.00
cost sum $119,944.13
contingency $11,994.41
Total $131,940
7/19/2018
$0.00
$200.00
$0
$0.00
$200.00
$0
$50.00
$0
$10000$
R,
$200.00
$6,800 .00
$2,109.38
$2,109.38
$0.00
$0.00
$0.00
$2,500.00
$0.00
$2,000.00
$0.00
$3,500.00
$3,500.00
$60.00 $0.00
$6,750.00
$2,500.00
$0.00
cost sum $119,944.13
contingency $11,994.41
Total $131,940
7/19/2018