HomeMy WebLinkAboutWPO201700014 Bond Estimates 2018-07-19Prosect Name: University of Virginia Research Park -Town Center Building Four -Water Protection Ordinance Plan WP0201700014 WPO file number: WP0201700014 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed (Note: Qty. reflect phase 1 and 2, without duplication -JA, 7/19/18) stablization (PS, TS) silt fence (SF) safety fence (SAF) tree protection (TP) diversion (DV, FD, RWD) temporary slope drain (TSD) pipe length 0 ft earthwork for trap/basin structures for basin silt fence inlet protection (IP) stone inlet protection (IP) outlet protection (OP) channel (SCC, matted) check dam construction entrance (CE) wash rack paved construction entrance rip -rap, placed height of dam at toeLft ft .ft length ft depth in channel ft height of fill at face ft length of dam ft top width 6 (area above transition) 33 sf (total width of dam) 12 ft (height below transition) 3 ft (area below transition) 9 sf (total fill volume) 213.9 cy length of spillway �ft width of spillway ft riser height aft riser diameter 0 in barrel length 0 ft barrel diameter 0 in length depth width survey and layout (price per 0.1 mi.) acres mobilization stream crossing (computed independently) pipe diameter -in cut at high sideft cutatface ft length of cutoft ft width of cut (area below transition 93 sf (total width of cut) 43 ft (depth below transitioi 3 ft (area above transition 55.5 sf (total fill volume) 825.0 cy (TOAL CYestimate) 896 cy (spillway stone tons) 18 tons $2,500.00 $0.00 $2,000.00 $0.00 depth width survey and layout (price per 0.1 mi.) acres mobilization stream crossing (computed independently) pipe diameter -in cut at high sideft cutatface ft length of cutoft ft width of cut (area below transition 93 sf (total width of cut) 43 ft (depth below transitioi 3 ft (area above transition 55.5 sf (total fill volume) 825.0 cy (TOAL CYestimate) 896 cy (spillway stone tons) 18 tons (riser unit price) $0.00 base plate orfdn - (barrel unit price) $0.00 barrel collars Mft baffle length 1081.5 ft width Fft width 0 ft channel width 0 ft _ft length 0 tft (tons) 0 tons traps and basins - M. Yerbv. 7/19/18; chk. JA -7/19 WP0201700014 UVA Research Park Town Center 4 ESC -bond -est 071918 monicaY acres $3,000.00 $37,500.00 236 . ft $4.50 $10,631.25 1656.0 ft $4.50 $7,452.00 1081.5 ft $10000$ R, 2320 ft $13.00 $30,153.50 $2,109.38 $0.00 $0.00 $13.00 $11,648.00 $50.00 $900.00 $60.00 $0.00 $6,750.00 $2,500.00 $0.00 cost sum $119,944.13 contingency $11,994.41 Total $131,940 7/19/2018 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 $10000$ R, $200.00 $6,800 .00 $2,109.38 $2,109.38 $0.00 $0.00 $0.00 $2,500.00 $0.00 $2,000.00 $0.00 $3,500.00 $3,500.00 $60.00 $0.00 $6,750.00 $2,500.00 $0.00 cost sum $119,944.13 contingency $11,994.41 Total $131,940 7/19/2018