1 a
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet, VA 22932 March Mountain Properties I, LLC 71 W0009
Phone: 434-823-5154 1005 Heathercroft Circle, Suite 100 Old Trail Block 12 Pond
Fax: 434-823-4764 Crozet, VA 22932 Old Trail Drive
Crozet, VA 22932
Date: 04/02/2018 Location: Jobsite
Category: Soils/Earthwork Location Details:
Type: Observation Frequency:
Weather: Clear
Air Temp. (deg. F): 56 F&R Personnel: Bailes, William F
Description of Work Completed
Work Completed: Technician arrived as scheduled to observe jobsite operations
Observations: Technician met with Justin of AG Dillard and discussed plans for raising height of dam at existing
pond. Dam to be raised 4 feet in height with aquatic benches created around interior base of dam to a
height level with top of existing dam. Discussions with contractor and engineer confirmed no clay core
needed. Current dam is in native material. Technician also informed contractor that stockpiled topsoil
material was unsuitable for use as fill in dam construction.
Contractor contacted technician later in day to inform that no further inspections would be needed this
day.
Determination: As Specified
Page 1 of 1
Field Observation Form 4-5-18 DFR
�Q Various Report Date: 4/28/2018
raaN. In _
f9N eenrg SM1r611M5wr:8dl
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet, VA 22932 March Mountain Properties 1, LLC 71 W0009
Phone: 434-823-5154 1005 Heathercroft Circle, Suite 100 Old Trail Block 12 Pond
Fax: 434-823-4764 Crozet, VA 22932 Old Trail Drive
Crozet, VA 22932
Date: 04/05/2018 Location: Jobsite
Category: Soils/Earthwork Location Details:
Type: Observation Frequency:
Weather: Clear
Air Temp. (deg. F): 45 F&R Personnel: Bailes, William F
Description of Work Completed
Work Completed: Technician arrived as scheduled to observe jobsite operations
Observations: Technician requested by contractor to observe benching of interior of existing pond. Technician
observed suitable Silt material being placed around interior rim of pond. Material was placed and
compacted with a sheepsfoot roller.
Fill observed by F&R today at the referenced location was found satisfactory.
Determination: As Specified
Page 1 of 1
&p Field Observation Form 4-9-18 DFR
I� Various Report Date: 4/28/2018
Eymmrq SWBi!ify S+a Ed91
Crozet Office
6185 Rockfish Gap Turnpike
Crozet, VA 22932
Phone: 434-823-5154
Fax: 434-823-4764
Date:
04/09/2018
Category:
Soils/Earthwork
Type:
Observation
Weather:
Snow/cloudy
Air Temp. (deg. F):
35
Client: Project:
March Mountain Properties I, LLC 71 W0009
1005 Heathercroft Circle, Suite 100 Old Trail Block 12 Pond
Crozet, VA 22932 Old Trail Drive
Crozet, VA 22932
Location: Jobsite
Location Details:
Frequency:
F&R Personnel: Bailes, William F
Description of Work Completed
Work Completed: Technician arrived as scheduled to observe jobsite operations
Observations: Technician observed fill / compaction above pond overflow pipe. Material reddish silt with no rock
observed. Lifts 6 to 8 in. Compaction with rammax and sheepsfoot roller. Compacted lifts probed with
small diameter steel rod at elevations 4 ft, 5 ft and 6 feet above existing pond bottom.
On exterior side of dam, slope being created with excavated material. Technician observed topsoil
material removed from fill prior to placement. Lifts 6-8 in compacted with CP56 sheepsfoot. Material
brownish silt which contained some soft weathered rock observed to break down under compaction
equipment easily.
Fill observed by F&R today at the referenced location and elevation was found satisfactory.
Determination: As Specified
Page 1 of 1
FAR
RoaEH,so�. H�. E H Ergimm�lq Shniircy SFIa 18d1
Crozet Office
6185 Rockfish Gap Turnpike
Crozet, VA 22932
Phone: 434-823-5154
Fax: 434-823-4764
Field Observation Form
Various
Client: Project:
March Mountain Properties I, LLC 71 W0009
1005 Heathercroft Circle, Suite 100 Old Trail Block 12 Pond
Crozet, VA 22932 Old Trail Drive
Crozet, VA 22932
Date: 04/10/2018 Location: Jobsite
Category: Soils/Earthwork Location Details:
Type: Observation Frequency:
Weather: Clear
Air Temp. (deg. F): 60 F&R Personnel: Bailes, William F
Description of Work Completed
4-10-18 DFR
Report Date: 4/28/2018
Work Completed: Technician arrived as scheduled to observe jobsite operations
Observations: Aquatic benching continues around interior of pond. Technician observd topsoil removed, before fill
placed, and hauled off site. Spillway created between forebay and wet pond. Subgrade of spillway
compacted with sheepsfoot roller.
Determination: As Specified
Page 1 of 1
Field Report
1/11
Report Date: 5/ 018
Various
~HgienirgLro11rty5rcf �.
Crozet Office
Client:
Project:
6185 Rockfish Gap Turnpike
Crozet, VA 22932
March Mountain Properties I, LLC
71 W0009
Phone: 434-823-5154
1005 Heathercroft Circle, Suite 100
Old Trail Block 12 Pond
Fax: 434-823-4764
Crozet, VA 22932
Old Trail Drive
Crozet, VA 22932
Date: 05/01/2018 Location: Jobsite
Category: Soils/Earthwork Location Details:
Weather: Clear
Air Temp. (deg. F): 82 F&R Personnel: Bailes, William F
Description of Work Completed
Nork Completed: Technician arrived as scheduled to observe jobsite operations
=field Notes: Borrow area excavation begun near site to provide appropriate fill for damn.
)etermination: As Specified
Page 1 of 2
Crozet Office
6185 Rockfish Gap Turnpike
Crozet, VA 22932
Phone: 434-823-5154
Fax: 434-823-4764
Date: 05/01 /2018
Category: Soils/Earthwork
Field Report Report Date: 1-18 018
DFR
Various
Client: Project:
March Mountain Properties I, LLC 71 W0009
1005 Heathercroft Circle, Suite 100 Old Trail Block 12 Pond
Crozet, VA 22932 Old Trail Drive
Crozet, VA 22932
Location: Storm Water Pond
Location Details: South side of Damn. At outflow pipe.
Type: Observation Frequency: Periodic
Weather: Clear
Air Temp. (deg. F): 52 F&R Personnel: Armentrout, Chris , Technician
Description of Work Completed
Work Completed: F&R returned to the site as requested for continued pond construction.
Tests Performed: N/A
Field Notes: Upon arrival technician observed A.G.Dillard compacting previous placed fill at/around -9ft below
FG over outflow pipe. A.G.Dillard completed compaction and begun placing next. Technician
observed rocky material containing weathered rock being used as fill for dam. This material contained
large at/around 8" to 14" in varying sizes that did not break down under compaction.
Technician called project engineer E.Dean with F&R, described to engineer type fill material, and
engineer advised that rocky material not be used as fill around the outflow pipe. Fill activities were
stopped until more suitable material was available. Referenced lift of rocky fill was removed.
Determination: As Specified
Page 2 of 2
Crozet Office
6185 Rockfish Gap Turnpike
Crozet, VA 22932
Phone: 434-823-5154
Fax: 434-823-4764
Date:
06/08/2018
Category:
Soils/Earthwork
Coverage:
Fill Monitoring
Type:
Observation
Weather:
Clear
Fill Monitoring 6-8-18 Fill
Client: Project:
March Mountain Properties I, LLC 71 W0009
1005 Heathercroft Circle, Suite 100 Old Trail Block 12 Pond
Crozet, VA 22932 Old Trail Drive
Crozet, VA 22932
Location: Dam — Structural Fill
Location Details: Pond dam
Frequency: Periodic
Wind (mph):
Air Temp. (deg. F): 80 Personnel: Farrish, Christopher L , Technician
Description of Work Completed
Work Description: Periodic visits to the site over the last weeks found no activity on site.
On site today to check site activities, contractor started work again on pond backfill.
Fill Monitoring Summary
Placement
Depth/Elev.
Fill Moisture
Fill Material
Lift
Compaction
Vibration
Density
Location
Reference
Condition
Description
Thickness
Equipment
Used?
Tests
(inches)
Taken
Pond dam
finished grade
Moist
Reddish brown sandy
8 to 10
Sheepsfoot
Yes
No
Elev. (ft.)-7.00
Silt
inches
Roller
to
Elev. (ft.) -2.00
Observations & Comments: Visual and manual methods, including probing with a small diameter steel rod and proofrolls with
loaded dump trucks, were used to evaluate fill placement and compaction. Fill observed by F&R today
at the referenced location was found satisfactory.
Determination: As Specified
Discrepancy Recorded?: No
Please Note: Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 1