Loading...
HomeMy WebLinkAboutSDP201600047 Review Comments Initial Site Plan 2016-09-23Short Review Comments Report for: SDP201600047 SubApplication Type: Staybridge Suites - Initial Initial Site Plan Date Completed:09/07/2016 Reviewer:Johnathan Newberry CDD Planning Review Status:Requested Changes Reviews Comments: Division: Date Completed:08/05/2016 Reviewer:Jay Schlothauer CDD Inspections Review Status:No Objection Reviews Comments:Based on plans dated July 25, 2016. No comments or conditions. Division: Date Completed:08/24/2016 Reviewer:Margaret Maliszewski CDD ARB Review Status:Requested Changes Reviews Comments:This item will be reviewed by the ARB on September 6, 2016. Comments will be available after that meeting. Division: Date Completed:09/07/2016 Reviewer:Robbie Gilmer Fire Rescue Review Status:See Recommendations Reviews Comments:Based on plans dated 7/25/16. 1. Fire flow test required before final approval. Division: Date Completed:09/07/2016 Reviewer:Margaret Maliszewski CDD ARB Review Status:Requested Changes Reviews Comments:The ARB took the following actions on ARB-2016-48: Staybridge Suites Initial Site Plan at the 9/6/2016 meeting. Regarding the initial site development plan: Motion: Mr. Lebo moved that the ARB forward the following recommendations to the Agent for the Site Review Committee: • Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c(2), (3) and (5): A Certificate of Appropriateness is required prior to final site plan approval. A Certificate of Appropriateness may be issued when the following conditions have been met. 1. Identify on the drawings the color of the smooth face panel and provide a sample for review. 2. Add the standard mechanical equipment note to the site plan. “Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated.” 3. Revise the photometric plan to show that spillover does not exceed .5 fc, including along the edge of pavement along Laurel Park Lane. 4. Revise the photometrics using an LLF of 1.0. 5. Revise the lighting plan to make the OSQ-4MEwBLS fixtures easily legible. 6. Revise the lighting plan to include building-mounted lights. 7. Add the standard lighting note to the plan. “Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle.” 8. Revise interior parking lot trees to large shade trees. 9. Identify on the plan the color proposed for the retaining wall block. 10. Revise the plant species so that the number of proposed plants for any one species does not exceed 25% of the total proposed for that plant type (tree, shrub). 11. Revise the cornice to more appropriately reflect the proportions of the building mass. • Regarding recommendations on the plan as it relates to the guidelines: 1. Consider slightly darker shades for the tan wall panels. 2. Consider revising the light pole color to bronze. • Regarding recommended conditions of initial plan approval: A Certificate of Appropriateness is required prior to final site plan approval. • Regarding conditions to be satisfied prior to issuance of a grading permit: None. Mr. Binsted seconded the motion. The motion carried by a vote of 4:0. Division: Page:1 of 3 County of Albemarle Printed On:July 24, 2018 reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle.” 8. Revise interior parking lot trees to large shade trees. 9. Identify on the plan the color proposed for the retaining wall block. 10. Revise the plant species so that the number of proposed plants for any one species does not exceed 25% of the total proposed for that plant type (tree, shrub). 11. Revise the cornice to more appropriately reflect the proportions of the building mass. • Regarding recommendations on the plan as it relates to the guidelines: 1. Consider slightly darker shades for the tan wall panels. 2. Consider revising the light pole color to bronze. • Regarding recommended conditions of initial plan approval: A Certificate of Appropriateness is required prior to final site plan approval. • Regarding conditions to be satisfied prior to issuance of a grading permit: None. Mr. Binsted seconded the motion. The motion carried by a vote of 4:0. Date Completed:08/30/2016 Reviewer:Matthew Wentland CDD Engineering Review Status:See Recommendations Reviews Comments:Based on plans dated 7-25-16: 1. Final Site Plan approval will require an approved VSMP submittal. 2. The maximum grade for parking spaces and access aisles abutting parking spaces shall not exceed 5 percent [18.4.15.15(c)]. 3. Parking spaces may be reduced to 16' when a 2' unobstructed overhang is allowed for [18.4.12.16 (c)(6)]. Please verify that the grading behind the curb for 2' does not cause an obstruction to the overhang area. 4. Bumper blocks should be provided where a sidewalk is located closer than 2' from the edge of the parking area and is less than 6' wide [18.4.12.16(e)]. 5. For constructed slopes, the maximum steepness is 2:1 [Albemarle County Design Standards Manual]. It appears that some areas are graded at a steeper than 2:1 slope. Any slope steeper than 3:1 must also be stabilized with landscaping vegetation hardier than grass, which will not require mowing. Division: Date Completed:08/05/2016 Reviewer:Andrew Slack CDD E911 Review Status:Approved Reviews Comments:Approved. Division: Date Completed:09/06/2016 Reviewer:Alexander Morrison ACSA Review Status:Requested Changes Reviews Comments:JT, I have reviewed the above referenced application and have the following comments: • Water and Sewer construction plan review submittal will be required at the final site plan stage. Submit 3 copies of the plan along with water/sewer data sheets to the ACSA, Attn: Michael Vieira, PE, to begin the review process. • A sewer capacity agreement will be required prior to the ACSA recommending final site plan or construction plan approvals. • Show a grease interceptor. • Call-out the sewer connection as a core and boot. • Call out a 6” tapping sleeve and valve for the fireline. • Show the FDC location. • Show additional fire hydrants (per Fire/Rescue coverage requirements). • Show a large service tap for the domestic water service. • Call-out a water meter vault for the domestic service. Let me know if you have any questions. Division: Page:2 of 3 County of Albemarle Printed On:July 24, 2018 • Show additional fire hydrants (per Fire/Rescue coverage requirements). • Show a large service tap for the domestic water service. • Call-out a water meter vault for the domestic service. Let me know if you have any questions. Date Completed:08/23/2016 Reviewer:Adam Moore VDOT Review Status:Requested Changes Reviews Comments: Division: Date Completed:09/23/2016 Reviewer:Johnathan Newberry CDD Planning Review Status:Approved Reviews Comments: Division: Page:3 of 3 County of Albemarle Printed On:July 24, 2018 KSI lav' ,;lira sr :• COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phonglan2A 5832 Fax(434)972-4126 September 8,2016 Brian Brewer Kimley-Horn&Associates, Inc. 1700 Willow Lawn Drive, Suite 200 Richmond,VA 23230 brian.brewer@kimley-horn.com RE: SDP201600047 Staybridge Suites—Initial Site Development Plan • Dear Mr. Brewer: 1 The Site Review Committee has reviewed the development proposal referenced above. Initial comment ' • for the following divisions of the Department of Community Development and other agencies, as applicable,are attached: Albemarle County Planning Services (Planner) Albemarle County Engineering Services (Engineer) Albemarle County Information Services(E911) Albemarle County Building Inspections Albemarle County Architectural Review Board Albemarle County Department of Fire Rescue Albemarle County Service Authority Virginia Department of Transportation Comments reflect information available at the time the development proposal was reviewed,and should not be considered final. However,the Site Review Committee has attempted to identify all issues that will be required to be resolved prior to Final Site Plan approval.The Lead Reviewer will either approve with conditions or deny the Initial Site Plan within 15 days of the Site Review Meeting. Please contact me at your earliest convenience if you have questions or require additional information. Sincerely, a.4- J.T.Newberry Planner CC: LTD Hollymead LLC 1564 Crossways Boulevard Chesapeake,VA 23320 ndesai( ltdhospitality.com 1211) L. stAtAtuk e+H.aA: Albemarle County Planning Services(Planner)—J.T.Newberry,jnewber yAalbemarle.org 1. Section 32.5.2(a)—On Sheet CA-001,under Site Statistics,please revise the zoning district to be Planned Development—Mixed Commercial(PD-MC)and add Steep Slopes(Managed)to the list of applicable overlay districts. 2. Section 32.5.2(a)—On Sheet CA-001,under Site Statistics,please note this site lies within Block VIII of Hollymead Towncenter,Area C and is subject to the code of development and proffers associated with ZMA200100020. 3. Section 32.5.2(a)—On Sheet CA-001,under Site Statistics,please note the build-to line for Block VIII is 0-10' from the edge of sidewalk and this block permits a maximum of 76,000 square feet of non- residential use. cst cirt". \v-t) `S Section 32.5.2(b)—On Sheet CS-101, 104 parking spaces are provided.Please update the count on Sheet CA-001,CS-101 and CP-101. Cwt 5. Section 32.5.2(n)—Please note the maximum height of the retaining wall on Sheet CS-101. 6. Section 32.5.2(n)/Section 32.7.8/Section 4.17—Please revise the lighting plan in accordance with these sections and the comments from ARB(see below). Albemarle County Engineering Services(Engineer)—Matt Wentland,mwentlandAalbemarle.org 1. Planting plan does not have a scale or North Arrow on the sheet. Appears to be 1:20 scale.(18-32.5.2) /2. 16'parking spaces require a 2'unobstructed overhang.(18-4.12.16.c.6) Planting plan appears to show proposed plantings in this area. —1( 3. Road plans will be required for thru-road construction. Road will be built and accepted into the system or bonded prior to final site plan approval.(18-32.7.2.2) 141, Easement plat will be required for road across adjacent parcel. 5. Approved VSMP plans will be required prior to final site plan approval. (18-32.7.4.1) 6. Gutters shall be required where necessary to control or direct stormwater runoff. (18-4.12.15.g) Virginia Department of Transportation—Adam Moore,Adam.Moore@vdot.virginia.gov—See attached Albemarle County Department of Fire Rescue—Robbie Gilmer,rgilmerAalbemarle.org 1. Fire flow test required before final approval. Albemarle County Information Services(E911)—Andy Slack,aslack@albemarle.org—No objection Albemarle County Building Inspections,Jay Schlothauer,ischloth@albemarle.org—No objection Albemarle County Architectural Review Board—Margaret Maliszewski,mmaliszewski(a,albemarle.org Regarding requirements to satisfy the design guidelines as per§ 18-30.6.4c(2),(3)and(5):A Certificate of Appropriateness is required prior to final site plan approval.A Certificate of Appropriateness may be issued when the following conditions have been met. 1. Identify on the drawings the color of the smooth face panel and provide a sample for review. 2. Add the standard mechanical equipment note to the site plan. "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated." 3. Revise the photometric plan to show that spillover does not exceed .5 fc,including along the edge of pavement along Laurel Park Lane. 4. Revise the photometrics using an LLF of 1.0. 5. Revise the lighting plan to make the OSQ-4MEwBLS fixtures easily legible. 6. Revise the lighting plan to include building-mounted lights. 7. Add the standard lighting note to the plan. "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads.The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle." 8. Revise interior parking lot trees to large shade trees. 9. Identify on the plan the color proposed for the retaining wall block. 10. Revise the plant species so that the number of proposed plants for any one species does not exceed 25%of the total proposed for that plant type(tree,shrub). 11. Revise the cornice to more appropriately reflect the proportions of the building mass. Regarding recommendations on the plan as it relates to the guidelines: 1. Consider slightly darker shades for the tan wall panels. 2. Consider revising the light pole color to bronze. Albemarle County Service Authority—Alex Morrison,amorrison@serviceauthority.org 1. Water and Sewer construction plan review submittal will be required at the final site plan stage. Submit 3 copies of the plan along with water/sewer data sheets to the ACSA,Attn:Michael Vieira, PE,to begin the review process. 2. A sewer capacity agreement will be required prior to the ACSA recommending final site plan or construction plan approvals. 3. Show a grease interceptor. 4. Call-out the sewer connection as a core and boot. 5. Call out a 6"tapping sleeve and valve for the fireline. 6. Show the FDC location. 7. Show additional fire hydrants(per Fire/Rescue coverage requirements). 8. Show a large service tap for the domestic water service. 9. Call-out a water meter vault for the domestic service. • '4b/ itare Johnathan Newberry From: Alexander Morrison <amorrison@serviceauthority.org> Sent: Tuesday, September 06, 2016 10:21 AM To: Johnathan Newberry Subject: SDP201600047: Staybridge Suites -Initial JT, I have reviewed the above referenced application and have the following comments: • Water and Sewer construction plan review submittal will be required at the final site plan stage. Submit 3 copies of the plan along with water/sewer data sheets to the ACSA,Attn: Michael Vieira, PE,to begin the review process. • A sewer capacity agreement will be required prior to the ACSA recommending final site plan or construction plan approvals. • Show a grease interceptor. • Call-out the sewer connection as a core and boot. • Call out a 6"tapping sleeve and valve for the fireline. • Show the FDC location. • Show additional fire hydrants(per Fire/Rescue coverage requirements). • Show a large service tap for the domestic water service. • Call-out a water meter vault for the domestic service. Let me know if you have any questions. Alexander J. Morrison, P.E. Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville,Virginia 22911 (0)434-977-4511 Ext. 116 (C)434-981-5577 (F)434-979-0698 1 4.00 —-..- %IF \ $est, , COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 orange Road Culpeper.Virginia 22701 Charles A.Kilpatrick,P.E. Commissioner August 23,2016 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Atm: J.T. Newberry Re: Staybridge Suites—Initial Site Plan SDP-2016-00047 Review#1 Dear Mr.Newberry: The Department of Transportation,Charlottesville Residency Transportation and Land Use Section,has reviewed the above referenced plan as submitted by Kimley-Horn and associates, Incorporated,dated 25,July 2016 and offers the following comments: 1. Please provide route numbers, ADT, design speed,public/private,and show and label right-of-way for all streets that appear on the plan. 2. Plan sheet#CS-101;please provide proposed drainage data tying into existing storm sewer pipe. Please show that the existing system and outfall is adequate. 3. Please conform to the pavement widening WP-2, 302_02 in the 2008 Road and Bridge standards. Please show on plans mill and overlay. /3 4. Provide sight distance line profiles. Please demonstrate that adequate sight distance is ��1+ provided in both horizontal and vertical. _17',., Plan sheet#CS-101,radii on both entrances are inadequate,please refer to the Road �` ✓' " Design Manual appendix F, and page F-126, figure 4-11. Radii should be within a range of 25'-50' the selected shall accommodate the anticipated type of vehicle usage. 6. Plan sheet#CS-101 proposed sidewalk is outside of right of way and VDOT will not maintain. Consider dedicating right of way for sidewalk or a land use permit will need to be obtained. 7. It appears that Laurel Park Lane to be private, please confirm. 8. From Laurel Park Lane please show sight distance left onto Meeting Street. 9. Please extend photometric values to the surrounding street Timberwood Boulevard. Please provide two copies of the revised plan along with a comment response letter. If further information is desired,please contact Willis C. Bedsaul at 434-422-9866. Please note that the final site plan must show conformance with the VDOT Road Design Manual Appendices B (1) and F, as well as any other applicable standards, regulations,or other requirements. VirginiaDOT.org WE KEEP VIRGINIA MOVING August 23, 2016 J.T. Newberry Page 2 VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, Adam J. Dore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING