HomeMy WebLinkAboutWPO201600009 Approval - County 2018-07-30 (2)COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
Project:
Plan preparer
Owner or rep.:
Received date:
(Rev. 1)
(Rev. 2)
(Rev. 3)
Date of comments:
(Rev. 1)
(Rev. 2)
(Rev. 3)
Reviewer:
VSMP Plan review Amendment
Old Trail Village Blocks 10, 16, 17, 18 & 30 —SWM Plan Amendment
Jimmy Taggart, PE; Bill Ledbetter —Roudabush, Gale & Associates, Inc.
[BLedbettergroudabush.com; JTaggartgroudabush.com ]
914 Monticello Road, Charlottesville, VA 22902
March Mountain Properties LLC [1005 Heathercroft Circle, Suite 100]
Dave Brockman, dave a oldtrailvilla eg com
21 May 2018
12 Jul 2018 (.PDF)
24 Jul 2018 (.PDF)
30 Jul 2018 (.PDF)
5 Jul 2018
17 Jul 2018
28 Jul 2018
30 Jul 2018 Approved
John Anderson
SWPPP, ESOP, Mitigation Plans not reviewed with this correspondence —NA (SWM Plan Amendment)
WP0201600009 —Amendment to SWM Facility L-3
(Also see Stantec Stormwater Management Design Summary —East Side, Old Trail Village, Rev. 6/27/16 /pg. 4.5:
Quantity Compliance Summary. Also, p. 10 of .PDF Attached to this correspondence: Water Quantity Compliance
Summary Table, Node ID L3, showing Q2, Qio pre -development =4.71 and 14.32 cfs, respectively.)
A. Stormwater Pollution Prevention Plan (SWPPP) —NA
B. VSMP: SWPPP: Stormwater Management Plan (WP0201600009)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP.
This plan is approved.
1. Water Quantity requirements are met: Q2, Qlo pre -development —4.71 and 14.32 cfs, respectively*
while Q2, Qio proposed peak developed discharge —1.97 and 11.91 cfs, respectively.
* Ref. Stantec Report, rev. 6/27/16, Table 1 p. 4.5 (Also, p. 5 of Attached 6/19/16 SWMP review comments)
2. Water Quality Compliance is met* since the approved bioretention basin and proposed extended
detention -enhanced SWM facilities are equivalent at phosphorus removal efficiency.
9VAC25-870-96; Link: htips:Hlis.vireinia.cov/cci-bin/legp6O4.exe?000+ree+9VAC25-870-96 )
Engineering Review Comments
Page 2 of 3
Bioretention basin
50%
Bioretention filter
50%
Extended detention -enhanced
50%
38-66%
Retention basin II (4 x WQ Vol)
50%
Infiltration (1 x WQ Vol)
50%
*pending additional design review
3. Please provide additional (enhanced extended detention) SWM facility detail, including details at
least comparable to VSWMH Vol. 1, Min. Std. 3.07, Fig. 3.07-1a and Fig 3.07-1b* and Fig. 12,
Stantec Stormwater Master Plan, Old Trail Village, approved April 25, 2016. Level of detail
provided on sheets 4 and 5 is insufficient to guide review, construction, or inspection. Please see
Attached (Fig. 12). Also, note level of detail provided with Sheet 10, L-3 Bioretention Grading
and Layout, Stantec, 5/20/16, included as plan sheet 3 with this submittal. Please reference
Stantec (5/20/16) plan and profile (L3) for appropriate level of design detail. (Rev. 1) Partially
addressed. As follow-up, please see New comments, below.
* Link NSWMH: https://www.deq.vir ig nia.gov/Portals/O/DEQ/Water/Publications/HndbkVolumeI.pdf
4. Minor:
a. Riser top elevation, sheet 4 (Outlet #1 /Routing), 636.22 does not match sheet 5 profile.
Please reconcile. (Rev. 1) Addressed.
b. Sheet 2 and 4, 201.15' 36" RCP is inconsistent with sheet 5 As -built, HDPE. Please
reconcile. (Rev. 1) Addressed.
5. With additional design detail for enhanced extended detention, additional comments are possible.
New:
1. Sheet 4: Please label floor dimensions, forebay and extended detention. (Rev. 2) Partially
addressed. As follow-up, please label floor dimensions to aid construction inspection. (Rev. 3)
Addressed.
VSWMH, First Edition, 1999, Min. Std. 3.07 guides review; please:
a. Provide shallow marsh. Show in plan /profile —adjust design to reflect Min. Std. 3.07
guidance relative to shallow marsh size, depth, plantings, etc. Ref., for example, pg. 3.07-19,
pool volume /depth of an extended detention shallow marsh. (Rev. 2) Addressed.
(Link /Min. Std. 3.07: https://www.deq.virginia.gov/Portals/0/DEO/Water/Publications/HndbkVolumeLpdf )
b. Provide sediment forebay sizing calculation that shows that the sediment forebay is sized
to hold 0.25 inches of runoff per impervious acre of contributing drainage area, with an
absolute minimum of 0.1 inches per impervious acre. Ref. VSWMH, Min. Std. 3.04, pg. 3.04-
3, Volume. (Rev. 2) Addressed. As follow-up: Please compare weir elevation (633') with
sediment forebay stage storage data: if 3,349 CF required at elevation < 633', capacity of
forebay appears insufficient. Please revise, or call if review comment an oversight error.
VSWMH First Edit. 1999, Fig. 3.04-2 appears to indicate weir volume /capacity tied to weir elevation.
(Rev. 3) Addressed.
►11
SEDIMENT FOREBAY STAGE STORAGE
Elev(Fq-- aS lCFl
631.000 0.000
632-000 410.206
634.000 1825.670
636.000 7660.118
REQUIRED: 3,349 CIF
AVAJLABLE: 4.743 CIF
C. Provide fixed, vertical, sediment depth marker for the forebay; show on plans (Ref.
VSWMH, Std. 3.04-3 /Maintenance, para. 2). (Rev. 2) Addressed.
d. Include text hele, from Min. Std. 3.04 (pg. 3.04-3) Maintenance, on plans: (Rev. 2)
Addressed.
e. Provide schematic showing features equivalent to those shown in Fig. 3.07-2a, Enhanced
Extended Detention Basin Plan. Marsh features are required; marsh distinguishes Enhanced
ED, by definition. (Rev. 2) Addressed.
f. Provide profile showing features equivalent to those shown in Fig. 3.07-2b, Enhanced
Engineering Review Comments
Page 3 of 3
Extended Detention Basin —Section. Marsh features are required; marsh distinguishes
Enhanced Ex. Detention. (Rev. 2) Addressed.
g. Reference narrative design information, tables and figures in VSWMH, Min. Std. 3.07;
this information guides design, review, inspection and construction. (Rev. 2) Addressed.
h. Provide liner to prevent infiltration, per pg. 3.07-22, else infiltration may prevent the
shallow marsh from holding water. (Rev. 2) Addressed. Applicant response: a note has been
added to state that a geotechnical engineer must test the area for determining the necessity of a
geosynthetic pond liner in the marsh design area.
i. Reference buffer zone recommendation, Min. Std. 3.07, pg. 3.07-24. Show on plans, as
necessary, via note. (Rev. 2) Addressed.
j. Add plan note requiring removal of sediment and other debris during conversion of
sediment basin to enhanced ED; ref. pg. 3.07-17, 3. (Rev. 2) Addressed.
k. Reference Inspections, pg. 3.07-28, and include Chapter 3 Appendix annual inspection
checklist (Attached to these comments) on the plans (transfer to plans). (Rev. 2) Addressed.
1. Also, include maintenance and inspection guidelines, items L-7., Min. Std. 3.01, pg.
3.01-17/18, on plans. (Rev. 2) Addressed.
Note: Looking ahead to VSMP As -built, please consider and ensure that earthen embankment
(already constructed) meets Minimum Std. 3.01, Earthen Embankment requirements with respect to
material, core, compaction, inspection, etc. A (geotechnical) inspection report with details of
construction is expected, and is a minimum requirement. Min. Std. 3.01, p. 3.01-13, Embankment
Construction, states: "A geotechnical or construction inspector should be on site during embankment
construction. Inspectors should be required to more than just test fill compaction, i.e., observe
foundation preparation, pipe installation, riser construction, filter installation, etc." Albemarle requests
construction inspection observations and test results with As -built drawing for enhanced extended
detention basin earthen embankment, already constructed. The fact that the embankment is nearly
entirely in cut may simplify the task. (Rev. 2) Addressed. Applicant acknowledges; All geotech
reports relative to the construction of the embankmentibasin parameters will be submitted with the as -
built drawing.
C. VSMP: SWPPP: Erosion Control Plan (WP02016-00009) —NA
D. Mitigation Plan (WP02016-00009) NA
Process:
Now approved, please call if March Mountain wishes to adjust existing SWM Plan bond amount. Albemarle accepts
current amount as a relatively reasonable estimate of expense to construct revised SWM facility, but Applicant may
wish to review previously -approved and bonded SWM facility (L-3) to avoid unnecessary avoidable bond expense,
should enhanced extended detention pond bond amount appear to be less than the original SWM facility L3 bond
amount.
County forms can be found on the county website forms center under engineering;
http://www.albemarle.org/deptforms.asp?department=cdeng)Uo
Please feel free to call if any questions.
Thank you 434.872-4501 —0069
WP0201600009—OTV blocks 10, 16, 17, 18—VSMP_Amendment 073018approv