Loading...
HomeMy WebLinkAboutWPO200400004 Bond Release Stormwater Management Plan 2018-02-09 4.1 of IWO'. hAid; COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 STORMWATER MANAGEMENT PERFORMANCE BOND RELEASE PROJECT NAME: BG✓/'V7 ( ArQ y 1Aietv-' PLAN/PERMIT NO. ..//.0() 2°Oq — 0000 y DATE: 9/ 'e.4 / 49 This project has been satisfactorily completed and the stormwater management performance bond may be released at this time if all re-inspection and annual maintenance fee ' voiced have been paid. rosion Control Inspector Community Development Department All fees invoiced on the above project have beenIlected. - A-41t.t .k--11( # jp Director of Community// Developmen Count Engineer 2.! L// FT Date Date As-built plan was approved by Engineering Division: I 2-14 A-7 ;• N/A N/A DEQ Termination Date __Z___ Cc: Ana Kilmer Revised 10/16/2017 MTN.. County of Albemarle Department of Community Development Memorandum To: Ana Kilmer,Management Analyst Greg Harper, Water Resources Manager From: Mark Hopkins Division: Inspections—E&S Control Date: 9 February 2018 Subject: Conversion to Permanent Stormwater Management Facility The requirements of the stormwater management and water quality component of the water protection performance bond have been satisfactorily completed and this component of the bond may be released at this time. The permanent stormwater management facility(ies) should now be included in the Stormwater Inspection Program. PROJECT NAME: Ballard Field Upper Subdivision TMP: 05500-00-00-07100 SITE PLAN NUMBER: 2004-00400 FACILITY DESCRIPTION Type(s)and number of BMPs 1 —wet pond (incl.non-structural) #— [click to select type] Description of Outfall drains to channel to stream (Ex:24"RCP from 36"CMP riser) Water Quality ® Yes ❑No Design Storm ® 10yr El 2yr Any Additional Information (incl. stream buffer mitigation) A copy of the site plan and details of the BMP(s)are attached. I:\DEPT\Community Development\Fonns\Inspections\SWM Bond Release Form-conversion to permanent swm facility REVISED 3 8 2010.doc