Loading...
HomeMy WebLinkAboutSDP201200060 Calculations Final Site Plan and Comps. 2012-09-28 Noe WATER DATA SHEET Date 9/201/2- . (1) Project Name MORD? CheEe--K ?(Lo(-ESS,ONAL C ENTE12 (2) Project Location WEST oP -r t-rE 29 /FONTA1nis Ave INT,C. (3) Consultants -rim e.>R u. (4) Sources (5) Design Population 10o,a a -5F FFic 'S PAC- (6) Hydraulic Capacity (7) Pipe Material ?VC- (8) Pipe Diameter (Inches) Length (Feet) 4" 6" 8" (pO 10" 1302. 12" (9) Fire Hydrant Assemblies (Number) (10) Valves: (A) Gate 1 (Number) (B) Air Relief (Number) (11) Fittings: (A) Cross (Number) (B) Tee 7 (Number) (C) 90° Ell 2, (Number) (D)45° Bend S (Number) (E) 221 Bend (a (Number) (F) Reducer 2. (Number) (G) Blow-off Assemblies (Number) (12) Minimum pressure at critical water meter (20 psi required) Authority Provide: Booster Station Storage Reservoir A-1 fire SEWER DATA SHEET Date 91201(Z- (1) Project Name Plage/ ('. er/Z OrpFe'SSio' '&. C(p)TcYL (2) Project Location wEST F TSE ZTE 29 J CoN-rA INC AVE 1NTV• (3) Consultants 1").41.40/JS r.26Yte (4) Waste Treatment Facility (5) Design Population too,QDV S.E. 0PFICtI Vumber) (6) Connections ( (Number) (7) Industrial Waste (8) Pipe Material PVC (9) Pipe Diameter(Inches) Length (Feet) 6" 5-0 8" 10" 12" 15" 18" 21" 24" TOTAL FEET TO (10) Manholes: (A) Standard (Number) (B) Drop (Number) (11) (A) Siphons & Pump Stations (Number) (B) Force Main (Size-Length) (Feet) Authority Provide: Drainage Basin Sub Drainage Basin A-2