Loading...
HomeMy WebLinkAboutSDP199300018 Review Comments Letter of Revision 1 2018-07-27 (5)pF AL �411111QM Old /:\ 45114 � Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 July 27, 2018 Bill Akers Capitol Signs 11214 Howards Mill Rd Glen Allen, VA 23059 RE: ARB -2018-104: McDonald's at Stony Point Rd: Wall signs, Springboard Canopy, Welcome Point Gateway (TMP 07800-00-00-004A0) Dear Mr. Akers, I have reviewed the above -noted application. The following revisions are requested to make the proposal consistent with the Entrance Corridor Guidelines. 1. Revise sheets `Rev A' (Dwg. No. IN455510S), Sheet 1 of 3, showing the wall sign; the Coats specification sheet for the Pre -browse Drive-thru order board; and the Coates specification sheet for the Primary Drive-thru order board to include the standard lighting note: The level of illumination provided by the LED lights will not exceed the illumination produced by a single stroke of 30 milliamp (ma) neon. 2. The Welcome Point Gateway does not meet the Entrance Corridor Design Guidelines regarding accessory structures, unity and coherence, simplicity and reserve, integrated design, harmonious color, and visual clutter. Please provide for review alternatives to the gateway and canopy that have significantly reduced visual impacts. An order station without an overhead element, which would eliminate the need for the gateway, is recommended. 3. The landscaping plan provided (LP -1) does not show the current site plan/layout or the proposed signs and structures. Provide a current landscape plan on a current site plan that shows all proposed site changes. Provide a landscape schedule that reflects what is currently planted. Make a note if any landscaping will be removed or replaced. Provide a separate landscape schedule for any proposed landscaping. 4. The site plan provided (SP. 1) is not the most current version available. A revised site plan (SP. 1) with a revision date of 7/9/18 has been provided as part of the Letter of Revision application that is being reviewed simultaneously. Provide the most current site plan as part of this application package. 5. The building elevations that have been submitted are for another building. Provide building elevations for the correct building that show the exact proposed placement of wall signs. 6. The proposed "Slim Springboard Canopy" does not reflect the dimensions and profile of the proposed "New COD -- Customer Order Display" as depicted in detail 7 of SD.2, which has been submitted with the Letter of Revision application. Rectify the discrepancy. 7. Details on the illumination from any canopy, gateway, or other similar structure must be submitted for review (i.e., the LED downlight on the springboard canopy). Provide the photometric plan or diagram showing the value of the illumination at the ground, as well as manufacturer's cut sheets that describe illumination intensity (output in lumens), shielding, and color. Note that all lights emitting 3,000 lumens or more must be full cut-off fixtures. Please respond by email within 15 days of the date of this letter indicating whether you will or will not proceed with these revisions. Your decision to make the revisions will suspend the 60 -day review period associated with your original submittal. If you choose to complete the revisions, please email the revised drawings to me. If you choose not to proceed with these revisions, staff will be unable to approve your application. Failure to respond to this letter shall be presumed to be a request to proceed to action on the application without further revisions. If you have any questions about this action, please contact me as soon as possible. Sincerely, gdlk� Heather McMahon, Senior Planner hmcmahonkalbemarle.org 434-296-5832 x3278 cc: File ARB -2018-104 McDonalds Corp 1522 Park Rd Waynesboro, VA 22980