July 27, 2018
Bill Akers
Capitol Signs
11214 Howards Mill Rd
Glen Allen, VA 23059
RE: ARB -2018-104: McDonald's at Stony Point Rd: Wall signs, Springboard Canopy, Welcome
Point Gateway (TMP 07800-00-00-004A0)
Dear Mr. Akers,
I have reviewed the above -noted application. The following revisions are requested to make the proposal
consistent with the Entrance Corridor Guidelines.
1. Revise sheets `Rev A' (Dwg. No. IN455510S), Sheet 1 of 3, showing the wall sign; the Coats
specification sheet for the Pre -browse Drive-thru order board; and the Coates specification sheet
for the Primary Drive-thru order board to include the standard lighting note: The level of
illumination provided by the LED lights will not exceed the illumination produced by a single
stroke of 30 milliamp (ma) neon.
2. The Welcome Point Gateway does not meet the Entrance Corridor Design Guidelines regarding
accessory structures, unity and coherence, simplicity and reserve, integrated design, harmonious
color, and visual clutter. Please provide for review alternatives to the gateway and canopy that
have significantly reduced visual impacts. An order station without an overhead element, which
would eliminate the need for the gateway, is recommended.
3. The landscaping plan provided (LP -1) does not show the current site plan/layout or the proposed
signs and structures. Provide a current landscape plan on a current site plan that shows all
proposed site changes. Provide a landscape schedule that reflects what is currently planted. Make
a note if any landscaping will be removed or replaced. Provide a separate landscape schedule for
any proposed landscaping.
4. The site plan provided (SP. 1) is not the most current version available. A revised site plan (SP. 1)
with a revision date of 7/9/18 has been provided as part of the Letter of Revision application that
is being reviewed simultaneously. Provide the most current site plan as part of this application
package.
5. The building elevations that have been submitted are for another building. Provide building
elevations for the correct building that show the exact proposed placement of wall signs.
6. The proposed "Slim Springboard Canopy" does not reflect the dimensions and profile of the
proposed "New COD -- Customer Order Display" as depicted in detail 7 of SD.2, which has been
submitted with the Letter of Revision application. Rectify the discrepancy.
7. Details on the illumination from any canopy, gateway, or other similar structure must be
submitted for review (i.e., the LED downlight on the springboard canopy). Provide the
photometric plan or diagram showing the value of the illumination at the ground, as well as
manufacturer's cut sheets that describe illumination intensity (output in lumens), shielding, and
color. Note that all lights emitting 3,000 lumens or more must be full cut-off fixtures.
Please respond by email within 15 days of the date of this letter indicating whether you will or will not
proceed with these revisions. Your decision to make the revisions will suspend the 60 -day review period
associated with your original submittal. If you choose to complete the revisions, please email the revised
drawings to me. If you choose not to proceed with these revisions, staff will be unable to approve your
application. Failure to respond to this letter shall be presumed to be a request to proceed to action on the
application without further revisions.
If you have any questions about this action, please contact me as soon as possible.
Sincerely,
gdlk�
Heather McMahon, Senior Planner
hmcmahonkalbemarle.org
434-296-5832 x3278
cc: File ARB -2018-104