HomeMy WebLinkAboutSUB201600021 Correspondence 2018-08-026P
LAND SURVEYING
ENGINEERING
LAND PLANNING
JIM L. TAGGART, P.E.
DON FRANCO, P.E.
DAVID M. ROBINSON, P.E.
AMMY M. GEORGE, L.A.
July 25, 2018
ROUDABUSH, GALE & ASSOCIATES, INC. $
A PROFESSIONAL CORPORATION S p
Serving Virginia Since 1956
ENGINEERING DEPARTMENT SURVEY DEPARTMENT
172 SOUTH PANTOPS DRIVE, STE.A 914 MONTICELLO ROAD
CHARLOTTESVILLE,VA22911 CHARLOTTESVILLE. VA 22902 WILL [AM J. LEDBETTER, L.S.
PHONE. (434) 979-8121 PHONE (434) 977-0205 BRIAN D. JAMISON, L.S.
FAX (434) 979-1681 FAX (434) 296-5220 DAVID A. JORDAN, L.S.
INFO@ROHDABUSH.COM KRISTOPHERC. WINTERS. L.S.
Albemarle County
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
RE: Old Trail Village Blocks 10, 16, 17, 18 and 30 As -built Road Plans
I have made an inspection and performed as -built surveys of the roads in Old Trail Village
Blocks 10, 16, 17, 18 and 30. I certify that the roads have been built in accordance with the
approved construction plans.
As -built public road plans dated January 25, 2016, and last revised on July 15, 2015 were
prepared based on field surveys of the final constructed improvement locations. The plans have
been submitted to the Virginia Department of Transportation and County of Albemarle. The as -
built plans show both the final horizontal and vertical alignments for the roads, the locations and
elevations of storm drainage pipes, the locations of all stormwater conveyance channels and
easements and all public road signage. All horizontal and vertical variations between the
approved plans and the as -built features are indicated on the as -built plans.
William J. Ledbetter, L.S.
S.L.WILLIAMSON COMPANY, INC.
ASPHALT PAVING AND ROAD CONSTRUCTION 1/r4,0
7/30/2018
A.G. Dillard, Inc.
Josh Rector
295 Memory Lane
Troy, VA 22974
Re: Asphalt Material Placed in OldTrail
Mr. Rector,
The asphalt material placed at Old Trail has been produced per the current VDOT approved mix
design. SLWCO designs and produces all of mix per these mix designs unless specific project
specifications are given to us that describe a different material blend.
Sin00
cer ly,
�..,�
L rry Epp rd Jr.
Vice President, SL Williamson Company
1230 River Road
Charlottesville, VA 22901
TEL 434-295-6137 - 800-868-6137 - FAX 434-977-7852 I 1230 RIVER ROAD - CHARLOTTESVILLE, VIRGINIA 22901
wwwslwilliamson.com
r nl 1)sepl'
`{7
NIC Received-
Received by:•
Intnke: Parwnrd to Alnnegnnent Analyst s rk'si"
Ff�tctN��'
SCHEDULE OF COMPLETION FOR BONDED IMPROVEMENTS
PROJECT NAME: ti :'L ► i � 710 t f t;1.' r.I?, f % �:
(as on bond estimate request form and approved plan)
This form is intended to facilitate the completion or bonded improvements in a timely manner by assuring the
developer has a schedule in place, and by providing this Department a means to assess the developer's ability to
meet the completion date stated in the bond agreement. The developer must provide a completion date for each
milestone listed below.
Date
Milestone
Publi--
r ' :° I'! ,
Start of construction.
j
Submit all paperwork in accordance with the County's "Public Road Acceptance Procedure"
(certificate of completion, as -built plans, recorded plats, professional engineer certi fication
for completed improvements, etc.).
VDOT documentation of acceptance (request to Board of Supervisors to adopt
resolution to accept road(s) into secondary road system).
Private Roads
Start of construction.
Submit al I paperwork in accordance with County's "Private Road Acceptance Procedure"
(compiled report of CBR tests, stone depth inspections, and fill compaction tests,
certified by a professional engineer, certificate of completion, as -built plans, recorded plats,
professional engineer certification for completed improvements, etc.).
Request 45 -day inspection from County.
^�eY' "'Gi'O
Request linal inspection from County.
Water & Sewer Improvements
Improvements dedicated and "acceptance" letter issued by the Albemarle County Service
Authority.
Additional Bonded Subdivision Improvements flandscaning, pedestrian oaths, sidewalks etc.
Submit signed and sealed letter from a professional engincer listing and certifying that
completed improvements are built according to approved plans and request inspection
from County.
Revised 11A 21110
Page I oft
SCHEDULE OF COMPLETION FOR BONDED IMPROVEMENTS
By signing below, the owner/developer agrees to complete the bonded improvements in accordance
with the above schedule. if, during the course of construction, the owner/developer finds they will
be unable to meet the schedule, they must provide written justification to the County Engineer of
the reasons preventing completion along with a revised completion schedule.
1. �
f
' Signa ure of Owner/Developer
Print Name Date
SCREDULE,OF COMPLETION ACCEPTED:
if
County Engineer Date
Se'e' .1
Subdivision/Roaa Kerformance Bond Completion Date