HomeMy WebLinkAboutWPO201800045 Calculations 2018-07-24MEMORANDUM — Minor Hill Hydrologic Analysis
i739 .'allied St., Suite A
Charlottesville, VA 22903
i6 540.239.1-428
www.ecosystemservices.us
info @ccosystcniscrvices. us
July 24, 2018
FROM: Ecosystem Services, LLC
SUBJECT: Minor Hill Hydrologic Analysis Overview — Objectives, Procedure, and Outputs
Objectives:
• Create a calibrated existing conditions hydrologic model
• Iterate a proposed conditions hydrologic model for design while keeping proposed outflows
equivalent to the original design discharge for the 10-year storm i.e. 11.6 cfs (see attached
letter)
Procedure:
• Installed stream gage and rain gage
• Parameterized existing conditions model using VGIN landuse data, WSS soils data, and total
station survey data
• Calibrated the existing conditions model to storm events between 10/8/2017 to 2/10/2018
• Parameterized the proposed conditions model based on the proposed grading and outlet
configuration
Outputs:
• Soils and landuse maps (see attachments)
• Peak pond inflow rate comparison between proposed and existing conditions:
Recurrence Interval
Model Output Description
1YR
2YR
10YR
25YR
100YR
Existing Peak Outflow (cfs)
0
0.48
7.50
12.23
35.29
Proposed Peak Outflow (cfs)
5.59
7.03
11.03
17.94
19.97
• Water quality reduction comparison:
TP (lb/yr)
TN (lb/yr)
Existing (Detention Pond)
0.49
1.99
Proposed (Bioretention)
5.20
39.84
Existing detention pond water quality outputs (attachment 4) were calculated by CWP pursuant to DEQ
Guidance Memo No 15-2005 for crediting existing BMPs. This uses Chesapeake Bay Program efficiencies
and downward modifications for missing design criteria.
Proposed water quality reductions were calculated pursuant to DEQ Guidance Memo No 15-2005 and
used the retrofit equation for runoff reduction practices and watershed land use information calculated
through a watershed analysis.
Minor Hill Hydrologic Analysis
July 24, 2018
Attachments:
1. Watershed soils map
2. Watershed landuse map
3. VRRM Spreadsheet
4. Existing BMP water quality reduction spreadsheet
S. County Approval Letter 10/2/1979
6. PCSWMM Outputs
Ecosystem Services, LLC A 1739 Allied St., Suite A, Charlottesville, VA 22903 A 540.239.1428 A www.ecosystemllc.com
Page 2 of 2
w
-
Soil
Symbol
Area
%Total
Hazel loam
39D
0.55
7.60%
Elioak loam
2713
3.99
55.11%
Glenelg loam
134C
1 2.71
37.29%
1739 ALLIED STREET, SUITE A, CHARLOTTESVILLE, VIRGINIA
540.578.4296 WWW.ECOSYSTEMSERVICES.US
SOIL MAP
MINOR HILL
ALBEMARLE COUNTY, VIRGINIA
Legend
Project
Watershed
Soils
27B
27C
34 C
39 D s
65C
95
SCALE: 1 in = 200 feet
PROJECT NO: 17-0035
PM: WKM
DRAWN BY: WKM
SOURCE: VGIN
DATE: 5/20/2018
SHEET: 1 OF 2
Landuse
Area
% Total
Forest
0.05
0.69%
Impervious
2.63
36.33%
Tree
1 2.671
36.88%
Turf Grass
1 1.89
26.10%
1739 ALLIED STREET, SUITE A, CHARLOTTESVILLE, VIRGINIA
540.578.4296 WWW.ECOSYSTEMSERVICES.US
Site ID Site Description CWP Conversion or Existing Practice Proposed Practice if Proposed Practice if Conversion (CBP RR or
Staff Enhancement Conversion Nomenclature) ST
1 137.02 1Minor Hill Townhouses lConversion I Dry Detention Pond I Constructed Wetlar IBioretention A/B soils, underdrain I RR
Enter dimensions in Columns O -- U, OR water quali
measurements directly in
Drainage Area Urban Impervious Urban Pervious Target Storage Available Available IWS Ponding
Site ID (acre) (acres) (acres) Forest (acres) %IC %Turf P (in) Rv WQv (CF) Practice Practice (Yes/No) Depth (in)
Width (ft) Length (ft)
37.02 7.24 2.63 4.61 0.00 36% 64% 1.00 0.49 12751.10
37.02
ty volume from comps and/or field
Column Z
Combo
GIS-
Total
Estimated
Soil
Top
estimated
Total
Volume
% Water
Dry Filter
Wet Filter
Gravel
Bottom
Ponding
Storage
Site ID
Surface
Bottom
Volume
Sum for
Quality
Depth (in)
Depth (in)
Depth (in)
Surface Area
Volume (CF)
Volume
Area (SF)
Surface Area
(CF)
Projects in
Volume
(field value if
(CF)
(SF)
Series*
d iff't)
3921.00
31%
TP TN
Pollutant Pollutant TSS Pollutant
Notes
Load Load Load (Ibs/yr)
(Ibs/yr) (Ibs/yr)
6.93 1 56.92 1 2,246.33
Site ID
Runoff Depth
Captured per
Impervious Acre
(in)
Existing Practice Efficiency Modification) - Putting an x in the box modifies the initial efficiency
Absence of Absence of a Short Undersized 1: D.A.<5 Undersized 2: Pre -Retrofit
Sediment micropool/protect Circuiting ac + 3" orifice OR <12- Volume<2xWQV Performance
Forebay ion at outlet hr drawdown (0.5"x IC) Discount
Total Phosphorus
Removal (%)
Existing Removal (from Table I
Total Phosphorus
Removal (Ibs/yr)
Total Nitrogen
Removal (%)
37.02 10.41 x I x I X I 1 130% 17% 10.49 14%
L-S) - with Modified Efficiencies
Site ID Total Nitrogen Total TSS Removal Total TSS Removal
Removal (Ibs/yr) (%) (Ibs/yr)
137.02 1 1.99 1 7% 1 157.24 1
B, AUBREY HUFFMAN & ASSOCIATES, LTD.
�U
CIVIL ENGINEERING - LAND SURVEYING - LAND PLANNING
VIRGINIA LAND COMPANY BUILDING - ROUTE 29 NORTH
MAILING ADDRESS - P. O. BOX 6124
CHARLOTTESVILLE, VIRGINIA 22906
epbone 973-3326
Mr. J. Harvey Bailey
Albemarle County Engineer
414 East Market Street
Charlottesville, VA 22901
RE: Wynridge, Phase II final plat
Dear Mr. Bailey,
burr, Edwards C. L. S. President
B. Aubrey Huffman C. E. Vice Presid
P
Oct. 2, 1979
The Albemarle County Planning Commission, at its meeting on
September 27, 1979, approved the above referenced plat subject to
several conditions, one of which was compliance with the Storm
water Detention requirements. When the plans were drawn for a
detention pond for Phase I Wynridge, most of the area for Phase II
was included in the calculations. The figures used to determine
the pond capacity are underlined in red on the accompanying drawing
(sheet one).
The second phase will also involve an additional 6.9 acres
which do not drain directly into the proposed pond (marked in
red on sheet 2). I have revised the calculations to adjust for
additional storage as follows:
Peak flow computations 110 year storm frequency)
prior to development - entire basin with
additional 6.9 acres
c=0.2, 1=3.5 in/hr (30 min.), a=30.4 acr
q=21.3 cfs
after development of entire basin with an additional
6.9 acres
c=0.4, 1=3.5 in/hr (30 min.), a-30,4
q=42.6 cfs
As indicated in the above figures, the maximum peak discharge
for the entire area should not exceed 21.3 cfs. Since the additional
6.9 acres will not be affected by the pond, they will drain at a
maximum peak of 9.7 cfs; if this rate is subtracted from the total
allowable rate, the remainder is the maximum rate for the pond
(2193 - 9.7 = 11.6 cfs). By reducing the size of the pipe to a
15" cmp and raising the maximum pool elevation to 9.1 ft. (increasing
the storage capacity to 77,896 cubic feet) the maximum theoretical
discharge becomes 11.3 cfs, within the allowable limit.
W/
The emergency spillway design elevation will be 477.5, the dis-
charge pipe will be a 15" cmp, all other design criteria are unchan c
If this information is sufficient for the requirements of the g
Stormwater Detention Ordinance, please so notify N. Mason Caperton
of the Albemarle County Plannin De artment.
questions or su g p If you have any
ggestions, please contact me at your earliest
convenience.
enclosure
cc Mr. J
Ms N.
.M. Hill
Mason Caperton
Res ctfully,
homas N. Clair
Legend
• Junmons
Oulfalls
r Storages
Conduits
Visible
TAG ='WDT'
Orifices
Weirs
Subcalchments
e.100yr c.10yr
35
30
25
20
3
0
c
m
0
~ 15
10
5
0
Node OR
a.1yr d.25yr b.2yr
Sun 18 Mon 19 Tue 20 Wed
Feb 2018 Date/Time
�. •�
j' �' ,�� •.40*
.i
• i d � F
,L OG
so
�s
Y
4I •
O�
f • mdge Rd �•
Node OF1
e.100yr c.10yr a.1yr d.25yr b.2yr
20
18
16
14
y 12
w
U
3
0
c 10
m
0
8
6
4
2
0
Sun 18 Mon 19 Tue 20 We(
Feb 2018 Date/Time
Pond e. 100yr
5.5
5.0
4.0 ...................
3.5----------- -----
3.0 ........
a
m
0
2.5 ....................
2.0 ....................
1.5............
1.0 .....................
0.5 ------------ -------
0
Sun 18
Feb 2018
Objective functions for Depth (ft)
.From 2/17/2018 20:25:21 to 2/21/2018 3:29:39 (3.29 days)
Exceedance threshold (ft): 0
Deficit threshold (ft): 0
......................................:.............................
Pond e. 100yr
Maximum Depth(ft): 5.611
Minimum Depth(ft): 0 .............................. i
Mean Depth(ft): 0.618
Duration of Exceedances(h): 71.88
Duration of Deficits(h): 0.7167..............._
------------------------- --
Number of Exceedances: 1
Number of Deficits: 1
Volume of Exceedances(ft): 0
.....................................................................................................€-----------------------------
Mon 19 Tue 20
Date/Time
Wed 21
C2 b. 2yr
Sun 18 Mon 19 Tue 20 Wed 21
Feb 2018 Date/Time
14
12
10
C2 b. 2yr
Sun 18 Mon 19 Tue 20 Wed 21
Feb 2018 Date/Time
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.1 (Build 5.1.012) EXISTING
--------------------------------------------------------------
WARNING O1: wet weather time step reduced to recording interval for Rain Gage 2017-
7-18 to 2018-2-9
Element
Count
Number
of
rain gages ...... 8
Number
of
subcatchments ... 1
Number
of
nodes ........... 4
Number
of
links ........... 5
Number
of
pollutants ...... 0
Number
of
land uses ....... 0
Raingage Summary
Data Recording
Name
Data
Source
Type Interval
------------------------------------------------------------------------
100YR NOAA Type
D 9.05in
100YR NOAA Type D 9.05in
INTENSITY
6 min.
10YR NOAA Type
D 5.52in
10YR NOAA Type D 5.52in
INTENSITY
6 min.
1YR NOAA Type D
3.02in
1YR NOAA Type D 3.02in
INTENSITY
6 min.
2017-7-18 to 2018-2-9
2017-7-18 to 2018-2-9
INTENSITY
1 min.
25YR NOAA Type
D 6.78in
25YR NOAA Type D 6.78in
INTENSITY
6 min.
2YR NOAA Type D
3.66in
2YR NOAA Type D 3.66in
INTENSITY
6 min.
d._25yr
d._25yr
INTENSITY 6
min.
e. 100yr
e.
100yr
INTENSITY 6
min.
********************
Subcatchment Summary
Name Area Width %Impery %Slope Rain Gage
Outlet
------------------------------------------------------------------------------------
-----------------------
S1 7.24 463.86 36.23 10.6750 e._100yr
Pond
************
Node Summary
************
Invert
Max.
Ponded External
Name
-------------------------------------------------------------------------------
Type
Elev.
Depth
Area Inflow
J2
JUNCTION
460.90
9.25
0.0
J3
JUNCTION
459.98
15.33
0.0
OF1
OUTFALL
457.02
15.33
0.0
Pond
STORAGE
463.00
10.00
0.0
Link Summary
Name From Node To Node Type Length %Slope
Roughness
------------------------------------------------------------------------------------
C2
J2
J3
CONDUIT 34.0 2.7036
0.0110
C3
J3
OF1
CONDUIT 56.4 5.2553
0.0400
OR1
Pond
J2
ORIFICE
OR2
Pond
J2
ORIFICE
W1
Pond
J3
WEIR
*********************
Cross Section Summary
Full
Full
Hyd.
Max.
No. of
Full
Conduit Shape
Depth
Area
Rad.
Width
Barrels
Flow
------------------------------------------------------------------------------------
C2 CIRCULAR
1.25
1.23
0.31
1.25
1
12.55
C3 Overflow
15.33
1086.59
7.47
129.00
1
35364.44
****************
Transect Summary
Transect
Overflow
Area:
0.0014
0.0041
0.0068
0.0097
0.0131
0.0171
0.0215
0.0260
0.0307
0.0355
0.0416
0.0487
0.0591
0.0709
0.0830
0.0952
0.1078
0.1215
0.1357
0.1508
0.1667
0.1835
0.2010
0.2190
0.2386
0.2589
0.2797
0.3014
0.3251
0.3518
0.3799
0.4088
0.4377
0.4668
0.4968
0.5276
0.5588
0.5905
0.6225
0.6546
0.6877
0.7208
0.7543
0.7885
0.8228
0.8571
0.8920
0.9277
0.9637
1.0000
Hrad:
0.0223
0.0587
0.0917
0.1219
0.1331
0.1454
0.1750
0.2033
0.2302
0.2323
0.2529
0.2581
0.1975
0.2190
0.2522
0.2846
0.2991
0.3295
0.3585
0.3854
0.3754
0.3947
0.4190
0.4225
0.4457
0.4651
0.4945
0.5059
0.4759
0.4841
0.4991
0.5331
0.5668
0.5971
0.6148
0.6341
0.6668
0.6885
0.7212
0.7360
0.7685
0.8007
0.8148
0.8471
0.8791
0.9109
0.9266
0.9425
0.9718
1.0000
Width:
0.0705
0.0743
0.0782
0.0820
0.1007
0.1194
0.1228
0.1262
0.1295
0.1492
0.1766
0.2332
0.3052
0.3306
0.3345
0.3384
0.3654
0.3837
0.3963
0.4235
0.4478
0.4696
0.4846
0.5265
0.5446
0.5674
0.5763
0.6091
0.7063
0.7545
0.7907
0.7937
0.7967
0.8044
0.8312
0.8554
0.8590
0.8777
0.8808
0.9070
0.9099
0.9127
0.9383
0.9406
0.9429
0.9451
0.9666
0.9880
0.9935
1.0000
NOTE: The summary statistics displayed in this report are
based on results found at every computational time step,
not just on results from each reporting time step.
Analysis Options
Flow Units ............... CFS
Process Models:
Rainfall/Runoff ........ YES
RDII ...................
Snowmelt ...............
Groundwater ............
Flow Routing ...........
Ponding Allowed ........
Water Quality ..........
Infiltration Method ......
Flow Routing Method ......
Starting Date ............
Ending Date ..............
Antecedent Dry Days ......
Report Time Step .........
Wet Time Step ............
Dry Time Step ............
Routing Time Step ........
Variable Time Step .......
Maximum Trials ...........
Number of Threads ........
Head Tolerance ...........
**************************
Runoff Quantity Continuity
**************************
Total Precipitation ......
Evaporation Loss .........
Infiltration Loss ........
Surface Runoff ...........
Final Storage ............
Continuity Error (%) .....
Flow Routing Continuity
**************************
Dry Weather Inflow .......
Wet Weather Inflow .......
Groundwater Inflow .......
RDII Inflow ..............
External Inflow ..........
External Outflow .........
Flooding Loss ............
Evaporation Loss .........
Exfiltration Loss ........
Initial Stored Volume ....
Final Stored Volume ......
Continuity Error (%) .....
NO
NO
NO
YES
NO
NO
MODIFIED_GREEN_AMPT
DYNWAVE
02/18/2018 00:00:00
02/20/2018 23:54:00
0.0
00:01:00
00:01:00
00:05:00
5.00 sec
YES
8
1
0.005000 ft
Volume Depth
acre-feet inches
5.459
9.050
0.004
0.007
1.997
3.310
3.445
5.711
0.014
0.024
-0.013
Volume
Volume
acre-feet
---------
10^6 gal
---------
0.000
0.000
3.444
1.122
0.000
0.000
0.000
0.000
0.000
0.000
2.654
0.865
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.790
0.257
0.001
Time -Step Critical Elements
Link C2 (16.12%)
Highest Flow Instability Indexes
All links are stable.
Routing Time Step Summary
*************************
Minimum
Time Step
1.28 sec
Average
Time Step
4.49 sec
Maximum
Time Step
5.00 sec
Percent
in Steady State
0.00
Average
Iterations per Step
2.00
Percent
Not Converging
0.00
***************************
Subcatchment Runoff Summary
***************************
Total Peak Runoff
Total Total Total Total Total
Precip Runon Evap Infil Runoff
Runoff Runoff Coeff
Subcatchment in in in in in 10^6
gal CFS
------------------------------------------------------------------------------------
--------------------
S1 9.05 0.00 0.01 3.31 5.71
1.12 53.50 0.631
Node Depth Summary
--------------------------------------------------
Average Maximum Maximum Time of Max Reported
Depth
Depth
HGL
Occurrence
Max Depth
Node
Type
Feet
Feet
Feet
days
hr:min
Feet
---------------------------------------------------------------------------------
J2
JUNCTION
0.12
0.98
461.88
0
12:08
0.98
J3
JUNCTION
0.07
0.78
460.76
0
12:08
0.78
OF1
OUTFALL
0.07
0.78
457.80
0
12:08
0.78
Pond
STORAGE
6.67
9.79
472.79
0
12:08
9.79
Node Inflow Summary
Maximum
Maximum
Lateral
Total
Flow
Lateral
Total
Time
of Max
Inflow
Inflow
Balance
Inflow
Inflow
Occurrence
Volume
Volume
Error
Node
Type
CFS
CFS
days
hr:min
10^6 gal 10^6
gal
------------------------------------------------------------------------------------
Percent
-------------
J2
JUNCTION
0.00
12.00
0
12:08
0
0.679
-0.000
J3
JUNCTION
0.00
35.35
0
12:08
0
0.865
0.003
OF1
OUTFALL
0.00
35.35
0
12:08
0
0.865
0.000
Pond
STORAGE
53.50
53.50
0
12:06
1.12
1.12
0.000
Node Surcharge Summary
No nodes were surcharged.
*********************
Node Flooding Summary
*********************
No nodes were flooded.
**********************
Storage Volume Summary
**********************
------------------------------------------------------------------------------------
--------------
Average
Avg
Evap
Exfil
Maximum
Max
Time of
Max Maximum
Volume
Pcnt
Pcnt
Pcnt
Volume
Pcnt
Occurrence Outflow
Storage Unit
1000 ft3
Full
Loss
Loss
1000 ft3
Full
days
hr:min CFS
------------------------------------------------------------------------------------
--------------
Pond
32.276
53
0
0
58.858
97
0
12:08 35.35
***********************
Outfall Loading Summary
***********************
-----------------------------------------------------------
Flow
Avg
Max
Total
Freq
Flow
Flow
Volume
Outfall Node Pcnt
CFS
CFS
10^6 gal
-----------------------------------------------------------
OF1 97.33
-----------------------------------------------------------
1.33
35.35
0.865
System 97.33 1.33 35.35 0.865
********************
Link Flow Summary
********************
-----------------------------------------------------------------------------
Maximum
Time
of Max
Maximum
Max/
Max/
IFlowl
Occurrence
IVelocl
Full
Full
Link
-----------------------------------------------------------------------------
Type
CFS
days
hr:min
ft/sec
Flow
Depth
C2
CONDUIT
12.00
0
12:08
15.87
0.96
0.70
C3
CHANNEL
35.35
0
12:08
5.86
0.00
0.05
OR1
ORIFICE
0.00
0
12:08
OR2
ORIFICE
12.00
0
12:08
W1
WEIR
23.34
0
12:08
0.39
Flow Classification Summary
Adjusted ---------- Fraction of Time in Flow Class ----------
/Actual Up Down Sub Sup Up Down Norm Inlet
Conduit Length Dry Dry Dry Crit Crit Crit Crit Ltd Ctrl
------------------------------------------------------------------------------------
C2 1.00 0.01 0.00 0.00 0.00 0.99 0.00 0.00 0.02 0.00
C3 1.00 0.01 0.00 0.00 0.76 0.23 0.00 0.00 0.01 0.00
*************************
Conduit Surcharge Summary
*************************
No conduits were surcharged.
Analysis begun on: Wed Mar 07 15:32:46 2018
Analysis ended on: Wed Mar 07 15:32:47 2018
Total elapsed time: 00:00:01
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.1 (Build 5.1.012) PROPOSED
--------------------------------------------------------------
WARNING O1: wet weather time step reduced to recording interval for Rain Gage 2017-
7-18 to 2018-2-9
Element
Count
Number
of
rain gages ...... 9
Number
of
subcatchments ... 1
Number
of
nodes ........... 5
Number
of
links ........... 7
Number
of
pollutants ...... 0
Number
of
land uses ....... 0
Raingage Summary
Data Recording
Name
------------------------------------------------------------------------
Data
Source
Type Interval
100YR NOAA Type
D 9.05in
100YR NOAA Type D 9.05in
INTENSITY
6 min.
10YR NOAA Type
D 5.52in
10YR NOAA Type D 5.52in
INTENSITY
6 min.
1YR NOAA Type D
3.02in
1YR NOAA Type D 3.02in
INTENSITY
6 min.
2017-7-18 to 2018-2-9
2017-7-18 to 2018-2-9
INTENSITY
1 min.
25YR NOAA Type
D 6.78in
25YR NOAA Type D 6.78in
INTENSITY
6 min.
2YR NOAA Type D
3.66in
2YR NOAA Type D 3.66in
INTENSITY
6 min.
c._l0yr
c._l0yr
INTENSITY 6
min.
d._25yr
d._25yr
INTENSITY 6
min.
e. 100yr
e.
100yr
INTENSITY 6
min.
********************
Subcatchment Summary
Name Area Width %Impery %Slope Rain Gage
Outlet
-----------------------
S1
Pond
Node Summary
7.24 463.86 36.23 10.6750 c. l0yr
Invert
Max.
Ponded External
Name
Type
Elev.
Depth
Area Inflow
-------------------------------------------------------------------------------
J1
JUNCTION
461.10
10.90
0.0
J2
JUNCTION
460.90
9.25
0.0
J3
JUNCTION
459.98
15.33
0.0
OF1
OUTFALL
457.02
15.33
0.0
Pond
STORAGE
464.60
8.40
0.0
Link Summary
Name
From Node
To Node
Type
Length
%Slope
Roughness
------------------------------------------------------------------------------------
C1
J1
J2
CONDUIT
20.0
1.0001
0.0130
C2
J2
J3
CONDUIT
34.0
2.7036
0.0110
C3
J3
OF1
CONDUIT
56.4
5.2553
0.0400
OR1
Pond
J1
ORIFICE
OR2
Pond
J2
ORIFICE
OR3
Pond
Jl
ORIFICE
W1
Pond
J3
WEIR
Cross Section Summary
Full
Full
Hyd.
Max.
No. of
Full
Conduit
Shape
Depth
Area
Rad.
Width
Barrels
Flow
------------------------------------------------------------------------------------
C1
CIRCULAR
1.00
0.79
0.25
1.00
1
3.56
C2
CIRCULAR
1.25
1.23
0.31
1.25
1
12.55
C3
Overflow
15.33
1086.59
7.47
129.00
1
35364.44
****************
Transect Summary
****************
Transect Overflow
Area:
0.0014
0.0041
0.0068
0.0097
0.0131
0.0171
0.0215
0.0260
0.0307
0.0355
0.0416
0.0487
0.0591
0.0709
0.0830
0.0952
0.1078
0.1215
0.1357
0.1508
0.1667
0.1835
0.2010
0.2190
0.2386
0.2589
0.2797
0.3014
0.3251
0.3518
0.3799
0.4088
0.4377
0.4668
0.4968
0.5276
0.5588
0.5905
0.6225
0.6546
0.6877
0.7208
0.7543
0.7885
0.8228
0.8571
0.8920
0.9277
0.9637
1.0000
Hrad:
0.0223
0.0587
0.0917
0.1219
0.1331
0.1454
0.1750
0.2033
0.2302
0.2323
0.2529
0.2581
0.1975
0.2190
0.2522
0.2846
0.2991
0.3295
0.3585
0.3854
0.3754
0.3947
0.4190
0.4225
0.4457
0.4651
0.4945
0.5059
0.4759
0.4841
0.4991
0.5331
0.5668
0.5971
0.6148
0.6341
0.6668
0.6885
0.7212
0.7360
0.7685
0.8007
0.8148
0.8471
0.8791
0.9109
0.9266
0.9425
0.9718
1.0000
Width:
0.0705
0.0743
0.0782
0.0820
0.1007
0.1194
0.1228
0.1262
0.1295
0.1492
0.1766
0.2332
0.3052
0.3306
0.3345
0.3384
0.3654
0.3837
0.3963
0.4235
0.4478
0.4696
0.4846
0.5265
0.5446
0.5674
0.5763
0.6091
0.7063
0.7545
0.7907
0.7937
0.7967
0.8044
0.8312
0.8554
0.8590
0.8777
0.8808
0.9070
0.9099
0.9127
0.9383
0.9406
0.9429
0.9451
0.9666
0.9880
0.9935
1.0000
NOTE: The summary statistics displayed in this report are
based on results found at every computational time step,
not just on results from each reporting time step.
Analysis Options
****************
Flow Units ...............
Process Models:
Rainfall/Runoff ........
RDII ...................
Snowmelt ...............
Groundwater ............
Flow Routing ...........
Ponding Allowed ........
Water Quality ..........
Infiltration Method ......
Flow Routing Method ......
Starting Date ............
Ending Date ..............
Antecedent Dry Days ......
Report Time Step .........
Wet Time Step ............
Dry Time Step ............
Routing Time Step ........
Variable Time Step .......
Maximum Trials ...........
Number of Threads ........
Head Tolerance ...........
**************************
Runoff Quantity Continuity
**************************
Total Precipitation ......
Evaporation Loss .........
Infiltration Loss ........
Surface Runoff ...........
Final Storage ............
Continuity Error (%) .....
Flow Routing Continuity
Dry Weather Inflow .......
Wet Weather Inflow .......
Groundwater Inflow .......
RDII Inflow ..............
External Inflow ..........
CFS
YES
NO
NO
NO
YES
NO
NO
MODIFIED GREEN AMPT
DYNWAVE
02/18/2018 00:00:00
02/20/2018 23:54:00
0.0
00:01:00
00:01:00
00:05:00
5.00 sec
YES
8
1
0.005000 ft
Volume
acre-feet
3.330
0.004
1.515
1.797
0.014
-0.012
Volume
acre-feet
0.000
1.797
0.000
0.000
0.000
Depth
inches
5.520
0.007
2.511
2.979
0.024
Volume
10^6 gal
0.000
0.586
0.000
0.000
0.000
External Outflow .........
Flooding Loss ............
Evaporation Loss .........
Exfiltration Loss ........
Initial Stored Volume ....
Final Stored Volume ......
Continuity Error (%) .....
***************************
Time -Step Critical Elements
Link Cl (44.43%)
Highest Flow Instability Indexes
All links are stable.
*************************
Routing Time Step Summary
*************************
Minimum Time Step
Average Time Step
Maximum Time Step
Percent in Steady State
Average Iterations per Step
Percent Not Converging
***************************
Subcatchment Runoff Summary
***************************
Total Peak Runoff
1.757
0.000
0.000
0.000
0.000
0.040
0.000
0.68 sec
3.76 sec
5.00 sec
-0.00
2.02
0.22
0.573
0.000
0.000
0.000
0.000
0.013
Total Total Total Total Total
Precip Runon Evap Infil Runoff
Runoff Runoff Coeff
Subcatchment in in in in in 10^6
gal CFS
------------------------------------------------------------------------------------
--------------------
S1 5.52 0.00 0.01 2.51 2.98
0.59 28.00 0.540
******************
Node Depth Summary
******************
--------------------------------------------------
Average Maximum Maximum Time of Max Reported
Depth
Depth
HGL
Occurrence
Max Depth
Node
Type
Feet
Feet
Feet
days
hr:min
Feet
---------------------------------------------------------------------------------
J1
JUNCTION
0.28
2.66
463.76
0
12:19
2.66
J2
JUNCTION
0.14
0.91
461.81
0
12:19
0.91
J3
JUNCTION
0.08
0.45
460.43
0
12:19
0.45
OF1
OUTFALL
0.08
0.45
457.47
0
12:19
0.45
Pond STORAGE 0.72 3.30 467.90 0 12:19 3.30
*******************
Node Inflow Summary
*******************
------------------------------------------------------------------------------------
-------------
Maximum
Maximum
Lateral
Total
Flow
Lateral
Total
Time
of Max
Inflow
Inflow
Balance
Inflow
Inflow
Occurrence
Volume
Volume
Error
Node
Type
CFS
CFS
days
hr:min
10^6 gal 10^6
gal
------------------------------------------------------------------------------------
Percent
-------------
J1
JUNCTION
0.00
11.03
0
12:19
0
0.573
-0.001
J2
JUNCTION
0.00
11.03
0
12:19
0
0.573
0.003
J3
JUNCTION
0.00
11.03
0
12:19
0
0.573
-0.001
OF1
OUTFALL
0.00
11.03
0
12:19
0
0.573
0.000
Pond
STORAGE
28.00
28.00
0
12:06
0.586
0.586
0.000
**********************
Node Surcharge Summary
No nodes were surcharged.
*********************
Node Flooding Summary
*********************
No nodes were flooded.
Storage Volume Summary
------------------------------------------------------------------------------------
--------------
Average
Avg
Evap
Exfil
Maximum
Max
Time of
Max Maximum
Volume
Pcnt
Pcnt
Pcnt
Volume
Pcnt
Occurrence Outflow
Storage Unit
1000 ft3
Full
Loss
Loss
1000 ft3
Full
days
hr:min CFS
------------------------------------------------------------------------------------
--------------
Pond
2.800
5
0
0
16.545
28
0
12:19 11.03
Outfall Loading Summary
-----------------------------------------------------------
Flow
Avg
Max
Total
Freq
Flow
Flow
Volume
Outfall Node Pcnt
CFS
CFS
10^6 gal
-----------------------------------------------------------
OF1 50.26
2.04
11.03
0.573
-----------------------------------------------------------
System 50.26
2.04
11.03
0.573
Link Flow Summary
-----------------------------------------------------------------------------
Maximum
Time
of Max
Maximum
Max/
Max/
IFlowl
Occurrence
IVelocl
Full
Full
Link
-----------------------------------------------------------------------------
Type
CFS
days
hr:min
ft/sec
Flow
Depth
C1
CONDUIT
11.03
0
12:19
14.28
3.10
0.95
C2
CONDUIT
11.03
0
12:19
16.12
0.88
0.55
C3
CHANNEL
11.03
0
12:19
3.82
0.00
0.03
OR1
ORIFICE
11.03
0
12:19
1.00
OR2
ORIFICE
0.00
0
00:00
OR3
ORIFICE
0.00
0
00:00
W1
WEIR
0.00
0
00:00
0.00
***************************
Flow Classification Summary
***************************
Adjusted ---------- Fraction of Time in Flow Class ----------
/Actual Up Down Sub Sup Up Down Norm Inlet
Conduit Length Dry Dry Dry Crit Crit Crit Crit Ltd Ctrl
------------------------------------------------------------------------------------
C1 1.00 0.04 0.00 0.00 0.45 0.51 0.00 0.00 0.64 0.00
C2 1.00 0.04 0.00 0.00 0.37 0.59 0.00 0.00 0.49 0.00
C3 1.00 0.31 0.00 0.00 0.40 0.29 0.00 0.00 0.57 0.00
*************************
Conduit Surcharge Summary
*************************
----------------------------------------------------------------------------
Hours Hours
--------- Hours Full -------- Above Full Capacity
Conduit Both Ends Upstream Dnstream Normal Flow Limited
----------------------------------------------------------------------------
C1 0.01 1.23 0.01 1.57 0.01
Analysis begun on: Wed Mar 07 16:26:18 2018
Analysis ended on: Wed Mar 07 16:26:19 2018
Total elapsed time: 00:00:01